The overheating compliance route in a TM59 assessment

7 min readBy PlanScope Editorial Team

The modelling route is the only option once glazing grows or windows cannot open at night. Here is what the assessment assumes, and where those assumptions usually flatter the design.

A TM59 overheating assessment is one of two ways to demonstrate that a new home will not overheat, and choosing between them is a design decision rather than a reporting decision. Approved Document O offers a simplified route, which limits glazing area and prescribes minimum openable free areas by risk category, and a dynamic thermal modelling route built on the CIBSE methodology for assessing overheating risk in homes. The simplified route is quick and inflexible. The modelling route is slower, costs more, and is the only option once the design wants large glazing, a single aspect, or windows that cannot be opened at night.

Decide which route you are on before the elevations are fixed, because the simplified route's glazing limits are not something you can retrofit into a design that has already been sold to a client.

The two compliance routes compared

Route What it involves When it suits
Simplified method Maximum glazing areas and minimum openable free areas by orientation and risk category, taken from the tables in Approved Document O Modest glazing, cross-ventilated dual aspect homes, low external noise
Dynamic thermal modelling Hour-by-hour simulation against the CIBSE criteria, with the weather files and modifications the approved document specifies Large glazing, single aspect flats, urban sites where windows cannot open at night, and anywhere the simplified route fails

There is a third case worth naming. Where a planning authority's own policy requires an overheating assessment, for instance under a cooling hierarchy policy, the modelling route may be required for the planning application even where the simplified route would satisfy the building regulations. Check the local policy before assuming that building control is the only audience.

Weather files, scenarios and occupancy profiles

Three inputs determine the answer more than the building fabric does, and all three should be stated plainly on the first page of the report.

The weather file. The methodology uses design summer year files for the nearest available location, and the approved document specifies which file and which emissions and percentile scenario forms the compliance case. The alternative files, covering a short intense warm spell and a longer less intense one, are used as sensitivity tests rather than as the compliance case. A report that does not name the file it used cannot be checked.

The location. Using a weather file for a city 80 kilometres away because it was to hand will change the result. So will ignoring the urban heat island effect on a dense inner-city site, where the published file may understate night-time temperatures.

The occupancy profile. The methodology sets standard profiles, with bedrooms occupied overnight, living spaces occupied through the day and evening, and stated internal gains from people, lighting and equipment. Those profiles are deliberately conservative, and substituting a lighter occupancy assumption to pass the criteria is the single most common manipulation in this field. If a non-standard profile is used, it has to be justified and flagged.

The criteria for bedrooms and living spaces

For predominantly naturally ventilated homes there are two criteria and both must be met.

The first applies to occupied rooms across the May to September period, and limits the hours during which the operative temperature exceeds the comfort threshold by one degree or more to a small percentage of occupied hours.

The second applies to bedrooms at night, between 22:00 and 07:00, and limits the hours during which the operative temperature exceeds 26 degrees to one per cent of the annual hours in that period. That works out at around 32 hours across the year, which is a tight allowance and the one most schemes fail.

For homes that are predominantly mechanically ventilated, a single criterion applies, limiting hours above 26 degrees across all occupied rooms to a small percentage of annual occupied hours.

Report every room against every applicable criterion, not just the worst one. An officer or a building control body checking the work needs to see which rooms pass by a wide margin and which pass by an hour, because the second group is where a change during construction will cause a failure. An Overheating Risk Assessment that reports only a headline pass is not checkable.

Window opening assumptions and the noise constraint

This is where most modelling goes wrong, and it goes wrong in the applicant's favour.

The model assumes windows open when the room is warm. Whether they can be opened in reality depends on the openable free area after restrictors, guarding and the opening geometry, on security at ground floor level, on whether the flat has a single aspect so no cross-ventilation is possible, and on the external noise environment at night.

The approved document deals with the noise point directly. Where windows have to be closed at night to keep internal noise within acceptable limits, the model has to reflect that, which usually means the scheme needs mechanical ventilation and sometimes cooling. You cannot assume an open window for thermal purposes and a closed window for acoustic purposes in the same room on the same night.

So check three things in any model. What openable free area was assumed, room by room, and does it match the window schedule. What noise level was assumed at the facade, and does it match the Noise Impact Assessment. And whether restrictors, which are commonly fitted above ground floor level, were applied in the model.

Mitigation in the order the hierarchy requires

The hierarchy is not a preference. It is the order in which measures have to be considered, and a scheme that jumps to cooling without exhausting the earlier steps will be asked to go back.

  1. Reduce unwanted solar gains through orientation, glazing area and proportion, glazing specification and g-value.
  2. Provide external shading, whether fixed brise soleil, deep reveals, balconies acting as shading, or external blinds, which outperform internal blinds substantially.
  3. Reduce internal gains, mainly by insulating and locating heating and hot water distribution properly, since uninsulated pipework in a riser is a large and avoidable gain in flats.
  4. Provide passive means of removing heat, including openable area, cross-ventilation where the plan allows, and night purge.
  5. Provide mechanical ventilation where passive means are constrained.
  6. Provide active cooling only where the preceding steps cannot deliver compliance, and state the energy consequence.

Two measures worth more than their reputation. Deeper reveals and recessed windows cost little and shade a surprising amount on south and west elevations. And moving a bedroom from a west-facing single aspect position to an east-facing one at plan stage solves a problem that no amount of glazing specification will fix afterwards.

Where overheating meets acoustics and air quality

The three assessments constrain each other, and on an urban site they have to be run together rather than in sequence.

Noise sets whether windows can open at night, which sets whether the thermal model can rely on them. Air quality does the same on a site within or beside a management area, where opening a window onto a busy road at a low level is not an acceptable ventilation strategy, and an Air Quality Assessment may point towards filtered mechanical supply. Daylight pulls the other way, since reducing glazing to control solar gain reduces daylight, and a Daylight and Sunlight Assessment may set a floor below which the glazing cannot go.

Run one coordination exercise where the acoustician, the air quality assessor and the thermal modeller agree the facade strategy per elevation. Doing it in series, with each consultant inheriting the previous one's assumptions, produces a design that fails one test whichever way it is adjusted.

Reporting the results for a planning submission

A submission that survives review states the software used and its version, the weather file and scenario by name, the location and any urban heat island adjustment, the occupancy and gains profiles with any departure from the standard set flagged, a room schedule identifying every occupied room modelled and every one excluded with a reason, the openable free area assumed for each room cross-referenced to the window schedule, the facade noise levels assumed and their source, results for every room against every applicable criterion in a table, the sensitivity results using the alternative weather files, the mitigation described in hierarchy order, and a statement of residual risk.

Where the scheme also needs an Energy Statement, keep the two consistent. A fabric specification in the energy work that differs from the one in the thermal model is the most frequently spotted inconsistency in a planning submission, and it undermines both documents.

This is general guidance, not legal advice; check the position with your local planning authority, building control body or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Dynamic thermal modelling is work councils expect a suitably qualified author to carry out, so professional review is strongly advised.

Browse the report types on PlanScope to see how the overheating, energy and acoustic documents fit together.

Frequently asked questions

What are the two overheating compliance routes?

The simplified method in Approved Document O, which limits glazing area and prescribes minimum openable free areas by orientation and risk category, and dynamic thermal modelling against the CIBSE criteria with the weather files and modifications the approved document specifies. The modelling route becomes necessary with large glazing, single aspect flats or windows that cannot open at night.

What is the bedroom night-time criterion?

For predominantly naturally ventilated homes, the operative temperature in a bedroom must not exceed 26 degrees for more than one per cent of the annual hours between 22:00 and 07:00. That is around 32 hours across the year, which is a tight allowance and the criterion most schemes fail on west-facing single aspect rooms.

Which weather file should the model use?

A design summer year file for the nearest available location, with the file, emissions scenario and percentile that the approved document specifies as the compliance case. The other files, covering a short intense warm spell and a longer less intense one, are sensitivity tests. On a dense inner-city site, consider whether the published file understates night-time temperatures.

Can the model assume windows are open at night?

Only where they can actually be opened. If windows must be closed at night to keep internal noise acceptable, the model has to reflect that, which usually means mechanical ventilation and sometimes cooling. You cannot assume an open window for the thermal model and a closed one for the acoustic assessment in the same room.

Why do the overheating, noise and air quality studies have to be coordinated?

Because each constrains the others. Noise sets whether windows can open, air quality can rule out opening onto a busy road at low level, and daylight sets a floor on how far glazing can be reduced to control solar gain. Run one coordination exercise agreeing the facade strategy per elevation rather than passing assumptions down a chain.

Sources and further reading

overheatingtm59part odynamic thermal modellingenergyresidential design

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →