Daylight, Sunlight and Amenity

Overshadowing studies: what an officer expects to see

6 min readBy PlanScope Editorial Team

Shadow plots, sun hours plots and a table of sunlit areas, built on a model that includes the fences. Here is what an overshadowing study should contain and where they go wrong.

An overshadowing study is a set of shadow drawings and area calculations that answers one question: how much less sun will the neighbouring garden, window or amenity space get once the proposal is built. Officers ask for it when a scheme is close to a boundary, taller than what it replaces, or already attracting objections about light. What they expect to see is narrower than most people assume, and the studies that get sent back usually fail on the model rather than on the result.

If you are building a new house in a back garden or adding a second storey near a boundary, commission the study before the design is fixed. It costs less to move a wall on a drawing than to defend a shadow at committee.

Agreeing the scope before anyone models anything

Three decisions define the study, and getting them agreed with the council at pre-application saves a round of revisions.

Which receptors. Normally the gardens and principal windows of the properties that adjoin the site, plus any amenity space the scheme itself creates. On a corner plot or a stepped terrace, the affected properties are not always the obvious two.

Which dates. The spring equinox on 21 March is the primary test date for sunlight to gardens. Many councils also ask for 21 June and 21 December to show the summer and winter extremes. Some ask for equinox plus two intermediate dates.

Which cases. At minimum, existing and proposed. Where a neighbouring scheme already has permission, a cumulative case showing both is worth including, because leaving it out invites the objection that the study understates the position.

What has to be in the model

This is where studies fail. A shadow calculation is only as good as the geometry behind it.

  • A topographic survey with levels, because a site that falls away from the boundary produces a different shadow from a flat one.
  • The existing building being retained or replaced, modelled accurately rather than as a box.
  • Neighbouring buildings, at their real heights and positions, including rear extensions and outbuildings.
  • Boundary walls and fences at their actual heights. A 1.8 m close-boarded fence already shades a strip of garden and it belongs in both the existing and proposed cases.
  • Retained trees, where they are protected or certain to remain. Trees that may be removed should be shown in a sensitivity case rather than quietly deleted.
  • The correct north point, taken from the survey rather than from a site plan of uncertain origin.

State the coordinate basis and the source of every element. An officer who cannot tell where the neighbour's ridge height came from will not rely on the output.

Times, and the detail almost everyone gets wrong

Shadow plots are calculated in solar time, which is not the same as the time on a clock in Britain in summer. Whether the drawings are labelled in solar time, Greenwich Mean Time or British Summer Time changes what the reader thinks they are looking at.

Pick one convention, state it on every drawing, and use it consistently. Hourly intervals through the day are the norm, with half hourly steps where the shadow moves quickly across a small garden.

The outputs officers actually read

A study that hands over forty images without a conclusion is harder to use than one with six drawings and a table.

  1. Shadow plans at hourly intervals on each test date, existing and proposed, drawn at the same scale with the same rendering.
  2. Sun hours on ground plots, shading the area that receives two hours or more of sunlight on 21 March in each case.
  3. A table giving the sunlit area of each assessed garden, in square metres and as a percentage of the total, for the existing and proposed cases.
  4. The ratio of proposed to existing sunlit area, since a fall below 0.8 is treated as a noticeable loss under the BRE guidance.
  5. A short written conclusion for each receptor, stating the numbers rather than describing the images.

Include a plan showing which areas were assessed and which were excluded, with the reasons. Excluding a side passage is reasonable. Excluding the half of the garden nearest the extension is not, and it will be spotted.

Where the study fits in the wider assessment

Overshadowing is one part of a family of tests, and mixing them up muddles the argument.

Test What it assesses Typical reference
Sunlight to gardens Sunlit area of amenity space on 21 March Two hours over half the area, and a 0.8 ratio for change
Sunlight to windows Annual and winter sunlight to windows facing within 90 degrees of due south Annual probable sunlight hours
Daylight to windows Skylight reaching the window and the room behind it Vertical sky component and the no-sky line
Council design rules Proximity and bulk near boundaries 45 degree or 25 degree lines in a local design guide

An Overshadowing Study addresses the first row and is usually enough for a householder or small residential scheme. Where habitable room windows are affected as well, the fuller Daylight and Sunlight Assessment adds the window calculations and is what larger schemes need.

Solar panels on a neighbouring roof are worth a sentence. Loss of output from an existing installation is capable of being a material consideration, and where the affected roof carries panels, model them and address the point rather than waiting for the objection.

The failings officers find

Five recur.

The existing case includes something that is not there, usually a tall hedge or an outbuilding the applicant intends to remove. The proposed case omits something that is, usually the boundary fence.

Neighbouring buildings are modelled as flat-roofed blocks at eaves height, which shortens the existing shadow and makes the proposal look worse than it is, or as ridge-height blocks, which does the reverse.

The assessment date is labelled 21 March but the sun position corresponds to a different latitude, because the model was set up with a default location.

The conclusion asserts that the impact is acceptable without giving the areas or the ratio.

And the study assesses the wrong garden. On terraced streets the property most affected is often diagonally behind rather than directly adjoining.

Illustrative example. A two storey side and rear extension on a semi-detached house shows a proposed sunlit garden area at 0.76 of the existing figure, below the 0.8 threshold. Reducing the rear projection by 600 mm and dropping the eaves on the boundary side brings the ratio back above 0.8. The revised study is two drawings and a table. This example is illustrative only.

Submitting it

For a householder or minor application, the study goes in as a standalone document with the drawings appended, and its conclusions are summarised in the Design and Access Statement where one is submitted. For anything larger, the amenity conclusions belong in the Planning Statement alongside the other material considerations.

Where a neighbour has already objected, send the study to the case officer as soon as it exists rather than holding it for a formal amendment. Officers write their reports over a short window, and evidence that arrives after the draft is written carries less weight than evidence that arrives before.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that the BRE numerical values are guidance to be applied with judgement rather than fixed limits.

See PlanScope pricing if you want to draft the supporting statements while a specialist runs the modelling.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When does a council ask for an overshadowing study?

Usually where a proposal sits close to a boundary, is taller than what it replaces, or has attracted objections about loss of light. New dwellings in back gardens, two storey side extensions and infill plots are the common triggers. Some councils ask for one routinely on applications adjoining residential gardens.

What dates should shadow drawings use?

21 March, the spring equinox, is the primary test date for sunlight to gardens. Many councils also want 21 June and 21 December to show the summer and winter extremes. Hourly intervals through each day are normal, with half hourly steps where the shadow crosses a small garden quickly.

Do boundary fences need to be in the model?

Yes, at their actual heights and in both the existing and proposed cases. A 1.8 metre close-boarded fence already shades a strip of garden, and omitting it overstates the change caused by the proposal. Retained trees, neighbouring extensions and outbuildings belong in the model for the same reason.

What is the difference between an overshadowing study and a daylight and sunlight assessment?

An overshadowing study deals with sunlight reaching gardens and amenity areas, using shadow plots and sunlit area calculations. A daylight and sunlight assessment adds window calculations, including vertical sky component, the no-sky line inside rooms and annual probable sunlight hours. Larger schemes affecting habitable room windows normally need the fuller assessment.

Should the study consider a neighbour's solar panels?

Where an adjoining roof carries an existing installation, yes. Loss of output from established panels is capable of being a material consideration. Model the panels and address the point in the study rather than leaving it to be raised as an objection after the application has been validated.

Sources and further reading

overshadowingdaylight and sunlightamenityself buildextensions

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Daylight, Sunlight and Amenity

View all →
Daylight, Sunlight and Amenity6 min read

Daylight to rooms behind deep balconies and access decks

The obstruction is your own building. How projection, soffit height and balustrade choice change the daylight result, and what the assessment has to show.

Read article →
Daylight, Sunlight and Amenity8 min read

Adequate natural light as a Class MA prior approval matter

Adequate natural light carries a duty to refuse, not a discretion to weigh, and it is assessed on your drawings. Here is what to submit and how deep floorplates are made to work.

Read article →
Daylight, Sunlight and Amenity7 min read

Overshadowing of a public park by a tall building

The sun on ground test gives one number for an amenity space. A park is many spaces. Here is how to zone it, baseline it and report it so the result survives committee.

Read article →
Daylight, Sunlight and Amenity7 min read

Obscure glazing conditions and their daylight effect

Obscuring glass leaves the geometric daylight metrics untouched and alters everything calculated from transmittance. What changes, what does not, and the alternatives.

Read article →
Daylight, Sunlight and Amenity8 min read

Amenity harm and the presumption in favour of development

A failed Vertical Sky Component test is an input, not a reason for refusal. How to turn daylight findings into weight an inspector can use in the planning balance.

Read article →
Daylight, Sunlight and Amenity7 min read

Measuring existing windows for a daylight survey

External geometry can be measured from the street. Room depth and room use cannot, and that is where most daylight assessments are challenged at committee and on appeal.

Read article →