Part 16 prior approval or full permission for a mast

6 min readBy PlanScope Editorial Team

Most mobile masts are built under Part 16 of the GPDO 2015, where the council can only consider siting and appearance. Step outside the class and the whole scheme is up for assessment.

A mast that falls inside Part 16 of Schedule 2 to the GPDO 2015 already has planning permission. What the operator applies for is prior approval of siting and appearance, and the council's power stops at those two words. A mast that falls outside Part 16 needs a full planning application, and then everything is in play: landscape character, heritage setting, residential amenity, cumulative clutter and design.

So the first job on any site is not to draft a justification. It is to measure the proposal against the class and decide which door you are walking through.

What the two routes actually test

Part 16 prior approval Full planning application
Legal basis Permission granted by the GPDO 2015, subject to prior approval Permission sought under section 70 of the 1990 Act
Scope of assessment Siting and appearance only The whole planning merits
Period 56 days from receipt, with a proceed-anyway consequence 8 weeks for a minor application
Publicity As set out in the class and the procedure order Full statutory publicity and consultation
Conditions The class conditions, plus conditions on siting and appearance Any lawful condition
Appeal To the Planning Inspectorate against refusal To the Planning Inspectorate against refusal or non-determination

The narrow scope of the prior approval test is the reason operators fight to stay inside the class, and the reason councils and parish councils push to argue the proposal falls outside it. An objection that the area already has adequate coverage goes nowhere on a Part 16 application. The same objection, reframed as visual harm from a 25-metre lattice tower on a ridgeline, goes somewhere.

Reading Part 16 before you design

Part 16 Class A permits development by or on behalf of an electronic communications code operator for the purpose of the operator's network. That covers new ground-based masts, apparatus on existing buildings and structures, equipment cabinets, and the strengthening or alteration of existing masts, each subject to limits on height, dimensions and location.

Those limits have changed more than once, most recently through amendments aimed at faster mobile network rollout, and they differ between ordinary land and protected land. Do not work from a figure quoted in an older article or a supplier's leaflet. Open Part 16 on legislation.gov.uk, check the version in force on the date you intend to submit, and read the conditions as well as the limitations, because several of the operational restrictions sit in the conditions rather than in the height table.

Three exclusions catch people out. Listed buildings and scheduled monuments are outside the class. Sites of special scientific interest carry their own restrictions. And apparatus on a building within article 2(3) land is treated differently from the same apparatus on the same building 200 metres outside the boundary.

Where the answer is arguable, an application under section 192 of the 1990 Act settles it formally, which is the comparison drawn in a lawful development certificate or planning permission.

The 56-day clock

Part 16 gives the local planning authority 56 days from receipt of the application to give notice of its determination. If it does not, the operator may proceed in accordance with the details submitted.

That provision does real work in practice, and it also generates most of the disputes. The submission has to be complete and the details have to be the details you then build, because the deemed route only covers what was described. Keep the covering letter, the submitted drawings and the proof of delivery. Councils have challenged development built under a deemed approval on the basis that the application was never validly made, and the burden of showing otherwise sits with the operator.

The broader difference between a prior approval regime and a full application is set out in prior approval or planning permission: the difference.

Protected land changes the answer

Article 2(3) land means conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites. Inside those boundaries the class permits less, and the appearance judgement the officer makes is harder because the statutory duties bite. In a conservation area the council must pay special attention to preserving or enhancing character and appearance under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990. In a National Park or National Landscape there is a statutory duty to seek to further the purposes of the designation.

For a tall ground-based mast in any of those settings, a short landscape and visual appraisal earns its cost even on a prior approval application, because it gives the officer the material to grant on siting and appearance rather than refuse for lack of information. Photomontages from agreed viewpoints, a zone of theoretical visibility and an honest account of the worst view are worth more than a paragraph asserting that the mast will read as part of the street scene. A full Landscape and Visual Impact Assessment prepared to GLVIA3 is the right instrument where a full application is going in on a sensitive site.

Evidence the operator supplies either way

Whichever route applies, the expected pack is similar in substance:

  1. A description of the network need the site addresses, at a level that does not invite the council to second-guess the network design.
  2. An account of alternative sites and structures considered, including sharing an existing mast or rooftop, with the reason each was discounted.
  3. A declaration of conformity with the ICNIRP public exposure guidelines.
  4. Evidence of pre-application consultation consistent with the Code of Practice for Wireless Network Development in England, including notification of schools and colleges where the site is near one.
  5. Drawings showing the apparatus, the compound, the cabinets, the fencing and the access.
  6. Photomontages or a visual appraisal proportionate to the sensitivity of the setting.

A Telecommunications Compliance report is the document that gathers those strands. Councils usually expect a suitably qualified author for the radio frequency and exposure elements, so a drafted report is a starting point for a professional to check and sign rather than a finished submission.

Choosing the full application deliberately

Sometimes it is the better route even when the class is available.

A proposal that only just squeezes inside the limits, on a site where the council has objected before, buys years of uncertainty. A full application decided on its merits produces a permission that survives a change of officer, can be amended under section 73, and gives a right of appeal on the whole case rather than on siting and appearance alone. Where the operator wants a taller mast that can carry three networks and future equipment, the full route allows that argument to be made openly against local plan policy on digital infrastructure.

The trade-off is time and exposure. Eight weeks becomes four months with a committee cycle, and the objection base gets a wider target.

If you are assembling either submission, browse all 66 PlanScope report types and start a draft to see which supporting documents the council is likely to ask for.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What can a council refuse a Part 16 prior approval on?

Siting and appearance, and nothing else. The council cannot refuse because it doubts the need for the network, and where a declaration of conformity with the ICNIRP public exposure guidelines is supplied it should not treat health effects as a reason for refusal. Landscape, heritage and townscape impact all feed into the siting and appearance judgement.

What happens if the council does not decide within 56 days?

Part 16 allows the operator to proceed where the authority has not given notice of its determination within 56 days of receiving the application. That is why validation dates and the completeness of the submission matter so much on these applications. Operators should keep evidence of what was submitted and when, because the deemed route is often challenged after the event.

Do masts in a conservation area need full planning permission?

Not automatically. Part 16 still applies on article 2(3) land, which includes conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites, but with tighter limits on height and on what may be installed. Read the class conditions for protected land carefully, because development that is permitted elsewhere frequently is not permitted there.

Does a Part 16 approval give the operator rights over the land?

No. Planning permission and land rights are separate. Rights to install and keep apparatus on someone else's land come from the Electronic Communications Code in Schedule 3A to the Communications Act 2003, negotiated with the site provider or imposed by the tribunal. An operator with prior approval and no agreement cannot lawfully build.

Is a Telecommunications Compliance report needed for a prior approval application?

The council will expect an ICNIRP declaration and evidence on site selection and sharing. A compliance report pulls that together with the network justification and the appearance rationale. Councils usually expect a suitably qualified author for the radio frequency elements, so professional review of any draft is strongly advised before it is submitted.

Sources and further reading

telecomspermitted developmentprior approvalcomparisonsmasts

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons6 min read

Extension of time agreement or renewing a permission

Two things that get confused. Extending the determination period is routine; extending the life of a permission is impossible, and section 73 cannot do it either.

Read article →
Comparisons7 min read

Deed of variation or a section 106A application

Two routes to change a planning obligation, with very different tests. Why section 106A is not a viability hearing, and when a fresh application beats both.

Read article →
Comparisons7 min read

Building notice or full plans application to building control

Two routes to building control approval under the Building Regulations 2010. What each involves, where a building notice is unavailable, and how completion certificates and regularisation work.

Read article →
Comparisons8 min read

Dropped kerb approval or permission for a front hardstanding

The crossover is licensed under the Highways Act 1980. The driveway behind it is permitted development only if it is porous or drains inside your boundary. Most people need both approvals.

Read article →
Comparisons7 min read

Strategic Environmental Assessment or Sustainability Appraisal

A local plan appraisal discharges two duties at once: strategic environmental assessment under the 2004 Regulations and sustainability appraisal under section 19(5). Only one has sharp legal teeth.

Read article →
Comparisons7 min read

Environmental permit or planning permission for a waste use

The Environment Agency permits the operation. The waste planning authority decides whether the use belongs there. Both are needed, and a registered exemption is not a planning permission.

Read article →