Part S charge points or a planning condition

7 min readBy PlanScope Editorial Team

Approved Document S already requires a charge point per new dwelling with parking. Here is where a planning condition still has work to do, and where it is duplication.

Part S charge points vs planning condition is a question about which regime controls what, and the short answer is that Part S of the Building Regulations now does most of the work for new dwellings. Approved Document S requires an electric vehicle charge point for each new dwelling with associated parking, and cable routes where a charge point is not provided. A planning condition that repeats that requirement is duplication, and national guidance says conditions should not duplicate other statutory controls.

Which leaves a narrower but real role for planning: the cases Part S does not reach, and the matters Part S does not control.

What Part S requires and for which buildings

Approved Document S came into effect in June 2022 and supports Part S of Schedule 1 to the Building Regulations 2010. The requirements split by building type and by whether the work is new build or major renovation.

Situation Requirement in outline
New dwelling with associated parking space One charge point per dwelling
New dwelling with more parking spaces than dwellings Charge point per dwelling, cable route to remaining spaces
Residential building, major renovation, more than ten spaces Charge point per dwelling with associated parking, cable routes elsewhere
New non-residential building with more than ten spaces One charge point, plus cable routes for one in five spaces
Non-residential major renovation, more than ten spaces Same as new build, where the work affects the car park or electrics
Mixed use building Residential and non-residential requirements applied to the relevant parts

Associated parking is the concept that does most of the work. A space allocated to a dwelling, or within the curtilage of it, is associated parking. An unallocated communal car park is treated differently, and this is where disputes arise.

The cost exemption and how it is evidenced

Where the cost of providing the connection exceeds the cost cap in Approved Document S, currently set at £3,600 per charge point excluding VAT, the requirement is limited. The developer provides as many charge points as can be installed within that cap and cable routes to the remainder.

The exemption is not self-certifying in practice. Building control will want the evidence, which means a written quotation or connection offer from the distribution network operator showing the cost of the reinforcement or the new supply, broken down so that the per charge point figure can be checked. A general statement that the connection is expensive will not carry it.

Two points worth knowing. The cap applies to the connection cost, not to the whole installation. And a quotation obtained early in a long project may no longer reflect the position at the time the work is done, so keep it current.

A Utilities Assessment setting out the available capacity, the reinforcement required and the network operator's response is the document that makes this straightforward at both planning and building control stage.

What a planning condition can add

Four things, all of which sit outside Part S.

Spaces Part S does not catch. A conversion creating dwellings where no building work triggers Part S, a development with no parking at application stage that later gains it, or parking provided outside the curtilage on land not subject to the building work.

Design and siting. Part S does not control where a charge point is, how it looks, whether a column obstructs a footway, or whether a cable trails across a pavement. Those are planning matters and a condition requiring a layout drawing is legitimate.

Future-proofing beyond Part S. The London Plan requires a higher standard than the national one, with at least 20 per cent of spaces having active charging provision and the remainder passive. Where a local plan policy sets a higher standard, a condition securing it is not duplication because it is securing something Part S does not require.

Management. Access arrangements for communal charge points, and the terms on which residents use them, can be secured through a management plan condition or a planning obligation.

Duplication and why it is resisted

National guidance on the use of planning conditions sets six tests, and a condition has to be necessary. A condition requiring what another regime already requires is not necessary, and officers who understand Part S will remove it if you ask.

The practical argument to make, in a Transport Statement or in correspondence, runs like this. State the Part S requirement that applies to the scheme as designed. Confirm the number of charge points and cable routes that follow. Then identify anything the local policy requires over and above that, and offer a condition covering only that increment.

This is a more productive line than resisting the condition outright, and it tends to work.

Communal parking and allocated spaces

The hard cases are flats with a shared car park.

Where spaces are allocated to individual dwellings, each allocated space is associated parking and attracts the per dwelling requirement. Where the car park is unallocated, the position depends on how the development is designed and how building control reads it, and practice varies.

The design consequences are real. Charge points in a communal car park need a metering and billing arrangement, a management regime, and often a larger incoming supply than the dwellings themselves justify. Deal with it at the outset: an electrical capacity statement, a layout showing the charge point positions and the cable route zones, and a short note on how residents will access and pay for charging.

Load management is the usual answer to the capacity problem. A dynamic load management system allows more charge points on a given supply by sharing capacity, and it is accepted by distribution network operators. Say so in the application rather than letting the officer assume a connection upgrade is needed.

Conversions and material changes of use

Part S attaches to building work and to major renovation, so a change of use that involves little physical work can fall outside it altogether.

An office to residential conversion under Class MA with existing parking, where no work is done to the car park or the electrical installation, is the clearest example. Part S may not bite, the parking already exists, and the only control available is a planning condition. This is where a condition is not duplication, and resisting it on duplication grounds will not succeed.

So the test to apply is simple. Identify whether building work or major renovation is happening to the relevant part. If it is, Part S governs and a condition is likely to be unnecessary. If it is not, planning is the only lever and a proportionate condition should be expected.

Showing provision on the drawings

Put it on one drawing and reference it everywhere else.

Mark each parking space with a reference, state which spaces have active charge points and which have cable routes, show the position of the distribution board or substation, and mark the cable route zones. Add a schedule listing spaces, dwellings and provision against the applicable standard. Where the cost cap is relied on, note it and cross-refer to the network operator correspondence.

Where a Travel Plan is required, the charge point provision belongs in it as a measure with a monitoring commitment, and the note on travel plan or transport statement sets out which document carries which obligation.

An illustrative scheme

A new build block of 24 flats with 14 spaces in an undercroft, all allocated. Part S requires a charge point for each dwelling with associated parking, so 14 charge points, and cable routes are not needed for dwellings without a space. The borough policy requires 20 per cent active and 80 per cent passive across all spaces, which the Part S provision exceeds for the allocated spaces.

The network operator quotes a reinforcement cost that works out below the cap per charge point, so the exemption does not apply. Dynamic load management is proposed to keep the incoming supply at the originally designed capacity. The condition sought by the case officer duplicating Part S is withdrawn, and a condition securing the layout drawing and the load management detail is agreed instead. Figures here are illustrative.

One honest uncertainty: how building control bodies treat unallocated communal parking is not uniform, and a scheme designed on one reading can meet a different one on site.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Does every new home need an EV charge point?

Every new dwelling with associated parking does, under Part S of the Building Regulations and Approved Document S. Where there are more parking spaces than dwellings, cable routes are required to the remaining spaces. A dwelling with no associated parking space does not attract the requirement at all.

How does the cost cap exemption work?

Where the connection cost exceeds the cap in Approved Document S, currently £3,600 per charge point excluding VAT, the developer installs as many charge points as fit within the cap and provides cable routes to the rest. Building control will expect a written quotation or connection offer from the network operator, broken down per charge point.

Can a council condition EV charging if Part S already applies?

It should not simply repeat the Part S requirement, because a condition has to be necessary and duplicating another statutory regime fails that test. A condition can legitimately secure a higher local standard, the layout and siting of the charge points, or management arrangements for communal provision.

What about conversions where no building work happens?

Part S attaches to building work and major renovation, so a change of use with little physical work can fall outside it. An office to residential conversion using existing parking is the clearest example. In that situation planning is the only available control and a proportionate condition should be expected rather than resisted.

How are communal car parks treated?

Allocated spaces are associated parking and attract the per dwelling requirement. Unallocated communal parking is treated differently and practice varies between building control bodies. Either way, communal provision needs a metering and billing arrangement, a management regime and often load management to avoid a supply upgrade.

Sources and further reading

electric vehiclesbuilding regulationspart splanning conditionsparking

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons7 min read

Local plan representation or a planning application objection

A plan representation can remove an allocation or rewrite a policy. An objection can refuse or condition a scheme. Once a site is allocated, arguing the principle is wasted effort.

Read article →
Comparisons7 min read

Hazardous substances consent or planning permission

A site handling a notifiable substance usually needs both consents. They are granted under different legislation, and a change in control of part of the land can revoke the hazardous substances consent.

Read article →
Comparisons7 min read

Technical approval or a road safety audit stage

Technical approval and road safety audit are separate gates inside a section 278 or section 38 agreement. They have different approvers, different standards and different programme risks.

Read article →
Comparisons7 min read

Flood resilience condition or Flood Re cover

Flood resilient construction secured by a planning condition and the Flood Re reinsurance scheme are often confused. One limits the damage, the other limits the premium, and a new build in a flood zone usually gets only the first.

Read article →
Comparisons7 min read

Extension of time or refusal and resubmission

An agreed extension keeps the case with the officer who knows it. A refusal and resubmission buys a clean start and a fresh case officer. The right answer depends on what the objection actually is.

Read article →
Comparisons7 min read

Section 106 monitoring fee or an infrastructure contribution

A monitoring fee and an infrastructure contribution both appear in a section 106 agreement and arrive in the same demand. They rest on different powers, meet different tests, and only one of them is capped by the cost of the work.

Read article →