Getting permission for a pontoon or slipway on a river

7 min readBy PlanScope Editorial Team

A piled pontoon or excavated slipway is operational development out to the low water mark. Planning permission is the straightforward part, and rarely the one that shapes the design.

Pontoon planning permission is usually needed, and it is usually the easiest of the three or four consents you will have to collect. A fixed pontoon on piles, or a slipway cut into a bank, is operational development in the local planning authority's area, because a council's boundary runs out to the low water mark and "land" for planning purposes includes land covered by water. The navigation authority, the Environment Agency and in tidal waters the Crown Estate all have their own say, and none of them is bound by what the council decides.

Whether it is development at all

Start here, because the answer is not always yes. A boat moored against a bank is not development, however permanently it stays. A floating stage held by chains to an existing wall, removed each winter, is arguable. A pontoon on driven piles with a fixed gangway and an abutment is plainly a building operation, and so is any slipway involving excavation, concrete or stone.

Where a structure sits in a river within an existing residential curtilage, some small works can fall within householder permitted development rights, but riverbank land is frequently outside the curtilage as a matter of fact, and the rights are removed or restricted in conservation areas and on designated land. Do not assume. A lawful development certificate under section 191 or 192 of the Town and Country Planning Act 1990 is the only formal way to confirm that works are lawful without permission.

The other consents that run alongside

Four separate regimes commonly apply to the same pontoon, and they are administered by four different bodies on four different timescales.

Consent Who grants it When it applies
Planning permission Local planning authority Building operations and material changes of use out to low water
Flood risk activity permit Environment Agency Works in, over, under or within 8 metres of the bank of a fluvial main river, or 16 metres of a tidal main river or sea defence
Land drainage consent Lead local flood authority or internal drainage board Works affecting flow in an ordinary watercourse, under the Land Drainage Act 1991
Navigation consent Environment Agency, Canal and River Trust, a harbour or port authority, or the Broads Authority Structures affecting a navigable channel, moorings and access to the water
Marine licence Marine Management Organisation Deposits and constructions below mean high water springs in tidal waters

Add ownership. Most tidal foreshore and riverbed belongs to the Crown Estate, which means a lease or licence as well as a consent, and on a non-tidal river the bed is usually owned to the centre line by the riparian owners. Establish who owns the bed before the design work starts, because the wrong ownership certificate on the application form is a validation problem and the wrong assumption about the bed is a legal one.

Flood risk and what the hydraulics have to show

Anything in the channel displaces water. The Environment Agency's interest is whether your structure raises levels upstream, alters flow patterns in a way that erodes the opposite bank, or traps debris in a flood.

A Flood Risk Assessment for an in-channel structure is a different document from the one written for a house in Flood Zone 2. It needs the channel geometry, the design flood levels, the blockage assumptions and, for anything other than a very small structure, hydraulic modelling showing the change in water level with and without the works. Present the afflux figure. If it is zero to two decimal places, say so and show the model output.

Design choices make this easier. A floating pontoon that rises with the river displaces almost nothing at flood level and is the default answer on a fluvial reach. Fixed decking at bank level is the answer that generates objections. Piles rather than solid abutments keep the conveyance. A slipway graded into the existing bank profile, rather than projecting from it, barely registers hydraulically.

Ecology, bank habitat and timing windows

River banks carry protected species that most applicants have not thought about. Water vole is fully protected and its burrows are in exactly the section of bank a slipway wants. Otter is a European protected species and uses the margins as a commuting route. Kingfisher and sand martin nest in vertical earth banks. Fish spawning imposes its own in-channel working restrictions, which vary by river type and are set by the Environment Agency's fisheries team rather than by the planning authority.

A Preliminary Ecological Appraisal should scope which of those apply and whether further survey is needed, and a licensed ecologist is legally required for protected species survey work and for any mitigation licence under the Wildlife and Countryside Act 1981 and the Conservation of Habitats and Species Regulations 2017. Build the survey seasons into the programme early, because a water vole survey in December tells you nothing useful.

Two practical points. Invasive species are common on river banks, so a biosecurity method statement covering plant and equipment cleaning belongs in the construction documents. And where mandatory biodiversity net gain applies to the application, the statutory metric assesses watercourse units separately from area habitats, so check how your scheme scores before you fix the design.

Access, parking and trailer manoeuvring

A slipway is a traffic generator. Cars towing trailers arrive, queue, reverse down a ramp, then park somewhere with the trailer still attached. That needs more space than people allow, and highway authorities are unsentimental about it.

Show the swept paths for a car and a six metre trailer on the layout. Show where trailers park, and how many. Show the visibility splay from the access onto the road, measured for the actual speeds rather than the posted limit. Provide a turning head rather than relying on a three point turn on a lane. Where the site will serve a club or a commercial hire operation, expect the authority to ask for a transport note, and expect a condition limiting the number of launches or the hours.

Wash-down provision does two jobs, catching invasive species and keeping mud off the highway. Put it on the drawing.

Appearance, heritage and river walls

Rivers in England are lined with listed structures. Bridges, mills, weirs, quay walls, boathouses and estate landscapes. Cutting a slipway through a listed river wall needs listed building consent as well as planning permission, and consent will turn on whether the intervention is reversible and legible. A scheduled monument needs scheduled monument consent from the Secretary of State, which is a separate process again and has no deemed timescale you can rely on.

For materials, recycled plastic decking wears well and reads badly in a historic setting. Hardwood on galvanised steel frames costs more and looks right. Keep handrails low or omit them where safety allows, because a line of white railings is what people see from the far bank. A Design and Access Statement is the place to explain those choices with photographs from the opposite bank rather than from your own.

The order to do things in

  1. Establish bed and bank ownership, and whether the Crown Estate is involved
  2. Hold pre-application discussions with the Environment Agency or navigation authority before the planning pre-app, because their requirements shape the design
  3. Commission the ecology walkover early enough to catch the survey seasons
  4. Fix the design, then model the hydraulics
  5. Submit the planning application with the flood risk and ecology work complete
  6. Apply for the permit, land drainage consent, navigation consent and marine licence in parallel with determination
  7. Agree the bed lease or licence before you order materials

Doing it the other way round, with planning first and the Agency last, is how schemes end up redesigned after permission. The same sequencing logic applies to other water related rural projects, including a farm reservoir or irrigation pond.

This is general guidance, not legal advice. Check the position with your local planning authority, the relevant navigation authority and a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Enter your postcode on PlanScope to see which reports a riverside site is likely to need.

Frequently asked questions

Does a floating pontoon need planning permission?

It depends on how it is fixed and how permanent it is. A moored boat is not development. A pontoon on driven piles with a fixed gangway and abutment is a building operation and needs permission. A seasonal floating stage chained to an existing wall is arguable, and a lawful development certificate is the only formal way to settle it.

When is an Environment Agency permit needed?

A flood risk activity permit is generally required for works in, over, under or within 8 metres of the bank of a fluvial main river, or within 16 metres of a tidal main river or sea defence. On an ordinary watercourse the equivalent is land drainage consent from the lead local flood authority or internal drainage board.

Who owns the riverbed?

On a non-tidal river the bed is usually owned to the centre line by the riparian owners on each bank. Most tidal foreshore and bed belongs to the Crown Estate, which means a lease or licence as well as consent. Settle ownership before design work, because it affects both the application certificates and the legal route.

What does the hydraulic assessment have to show?

The change in water level upstream with and without the structure, using channel geometry, design flood levels and stated blockage assumptions. Present the afflux figure and the model output. A floating pontoon that rises with the river displaces almost nothing at flood level, which is why it is the usual answer on a fluvial reach.

Which protected species affect riverbank works?

Water vole is fully protected and burrows in exactly the bank a slipway wants. Otter is a European protected species using the margins as a commuting route. Kingfisher and sand martin nest in vertical earth banks. Survey work and any mitigation licence require a suitably licensed ecologist, and survey seasons must be programmed early.

Do I need listed building consent for a slipway?

If the works cut through or alter a listed structure such as a quay wall, river wall or bridge, yes, and that consent is separate from planning permission. A scheduled monument needs scheduled monument consent from the Secretary of State, which runs on its own timescale and should not be assumed to fit your programme.

Sources and further reading

pontoonslipwayflood risknavigationriversiderural

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides8 min read

A cricket or sports pavilion on a village green

Planning permission is the easier of the two consents. Section 38 of the Commons Act 2006 prohibits works on a registered green, and starting without it is an offence.

Read article →
Project Type Guides7 min read

A new vehicular access across a public right of way

A right of way across your plot survives the grant of planning permission. Either design a lawful crossing or obtain an order, and programme the groundworks around confirmation.

Read article →
Project Type Guides7 min read

Dog grooming from home: when planning permission applies

A grooming table in a utility room rarely needs permission. A converted garage with three dryers and fifteen bookings a day usually does. The line is the material change of use test.

Read article →
Project Type Guides7 min read

A rural estate biomass boiler house and fuel store

The plant is rarely the problem. The chimney height set by dispersion, and the heat main trench through parkland trees and buried archaeology, are what these applications turn on.

Read article →
Project Type Guides7 min read

Opening a fish and chip shop in a parade of shops

A takeaway is sui generis, so permission is always needed. The decision then turns on the flue termination, the odour control train, fan noise at night and the hours offered.

Read article →
Project Type Guides7 min read

A community orchard and allotments on a field

Growing on farmland rarely changes the use on its own. Sheds, parking, water tanks and deer fencing do, and they are what a community allotment application has to pin down.

Read article →