Permitted Development

Permitted development on a flat, maisonette or converted house

7 min readBy PlanScope Editorial Team

A building containing flats loses Part 1 permitted development rights entirely. The horizontal division test, the Classes that still apply to blocks of flats, and how to get certainty.

Flats have almost no permitted development rights. The householder rights that let a house owner build a rear extension, a dormer or a garden outbuilding sit in Part 1 of Schedule 2 to the Town and Country Planning (General Permitted Development) (England) Order 2015, and Part 1 applies only to a dwellinghouse. Article 2(1) of the Order says a dwellinghouse does not include a building containing one or more flats, or a flat contained within such a building. So a landlord who converts a house into two flats has removed Part 1 rights from the whole building, including the ground floor flat with its own garden.

That single definition explains most of the refusals and enforcement notices that land on conversion investors.

What the loss of Part 1 actually covers

Once a building contains flats, planning permission is needed for work that would be permitted at a house. In practice that means the rear extension, the side infill, the loft dormer, the roof light that projects, the porch, the hardstanding, the shed, the outbuilding, the chimney and the satellite dish are all applications rather than free rights.

It also applies to work on the flat itself. A ground floor flat owner adding a small conservatory is carrying out development on a building containing flats, and Part 1 Class A is not available to them regardless of who owns the garden.

There is no de minimis exemption that rescues small works. The test is whether the operation is development under section 55 of the Town and Country Planning Act 1990, and if it is, and no Class permits it, permission is required. Internal alterations that do not materially affect the external appearance are generally not development, which is why internal reconfiguration of a flat is usually a Building Regulations question rather than a planning one.

The horizontal division test, and why it matters

The GPDO defines a flat as a separate and self-contained set of premises forming part of a building from which it is divided horizontally. Read that carefully, because it decides the outcome.

A house divided vertically into two self-contained houses, each with its own front door at ground level and its own full height slice of the building, is two dwellinghouses. Each keeps Part 1 rights, subject to the usual limits measured against the original building. A house divided horizontally into an upper and a lower unit is two flats, and Part 1 is gone from both.

That is a genuine planning difference between two conversions that look similar on a floor plan. Before you buy a converted property for the extension potential, establish which division you are looking at.

Where a building has been converted to flats and then converted back to a single dwellinghouse, Part 1 rights become available again once the building is lawfully a single dwellinghouse. Lawfully is the operative word. If the reconversion itself needed permission and did not get it, the rights are not restored on paper.

A house in multiple occupation within Class C4 is a different case again. It is a house that has not been divided into flats, so Part 1 rights are generally still available, though the position for a large sui generis HMO is less settled and worth checking with the local planning authority before relying on it.

What a flat can still do without permission

Part 1 is not the only Part in Schedule 2, and several others apply to blocks of flats or to land generally.

  • Gates, fences, walls and other means of enclosure under Part 2 Class A, at up to 1 m in height where adjacent to a highway used by vehicular traffic and up to 2 m elsewhere, with the usual exclusions around listed buildings.
  • Painting the exterior of a building under Part 2 Class C, where it is not an advertisement.
  • Electric vehicle charging outlets and upstands under Part 2, within the limits set in the relevant Class and subject to siting restrictions.
  • Solar equipment on a block of flats and freestanding solar within the curtilage of a block of flats under Part 14, subject to the size, siting and conservation area limits in that Part.
  • Air source heat pumps under Part 14 Class G, again subject to the limits and, where the relevant condition applies, the MCS planning standards.

Read the conditions attached to each Class rather than the headline. Part 14 in particular carries siting rules that bite hard on a flatted building with a shared roof, and several of those Classes exclude land within the curtilage of a listed building outright.

Adding storeys to a detached block under Part 20

Part 20 Class A is the one right that matters to a landlord with a purpose built block. It permits the construction of up to two additional storeys of new flats on a detached block of flats, within height limits and a date range for the original construction, subject to prior approval.

Prior approval is not a formality. The Class lists the matters the council must consider, which include external appearance, the amenity of existing and neighbouring premises with overlooking, privacy and loss of light, transport and highways, contamination, flooding and, for taller buildings, fire safety. The council can refuse on any of them.

Two practical points. The building must be detached, which rules out most Victorian conversion stock and end terraces. And a building reaching 18 m or seven storeys after the addition falls within the higher-risk building regime under the Building Safety Act 2022, which brings Planning Gateway One and a fire statement prepared by someone with the necessary fire engineering competence. That is a professional requirement, not a drafting exercise, and an AI-assisted draft is a starting point for that specialist rather than a substitute.

Part 20 also contains Class ZA, which allows the demolition of a single detached block of flats and its replacement with a new block or house, again through prior approval and again with strict qualifying criteria.

Conditions and directions that take away what is left

Even where a Class applies, two things can remove it.

A condition on the original planning permission can withdraw permitted development rights. Conditions of that kind are routine on new flatted schemes, particularly where amenity space or parking was tight at the time of approval. Read the permission for the building, not just the title deeds.

An Article 4 direction made by the council can withdraw specified Classes across a defined area. In conservation areas these commonly target front elevations, roof alterations and boundary treatment. Directions are published by the council and are recorded on planning.data.gov.uk, so there is no excuse for missing one.

Leasehold consents sit alongside all of this. Planning permission does not override a lease covenant, and a landlord's consent does not substitute for planning permission. They are separate systems and you need both.

Illustrative example: an investor buys the upper maisonette in a converted Edwardian semi and plans a rear dormer. The building contains flats, so Part 1 Class B is unavailable, and a full planning application is needed with a planning statement addressing amenity and the character of the roofscape. The neighbouring house, never converted, built the same dormer without an application two years earlier. Both readings are correct.

Getting certainty rather than assuming it

Where the answer turns on whether the division is horizontal or vertical, or on whether a previous reconversion was lawful, apply for a lawful development certificate. Section 192 of the Town and Country Planning Act 1990 covers proposed works and section 191 covers existing ones. A certificate is the only formal way to confirm that works are lawful, and it costs a fraction of an enforcement dispute.

This is general guidance rather than legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Enter your postcode on PlanScope to see which supporting documents a flat conversion or upward extension is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do flats have permitted development rights?

Not under Part 1 of Schedule 2 to the GPDO 2015, which applies only to dwellinghouses. Article 2(1) excludes a building containing one or more flats and any flat within such a building. Extensions, dormers, porches and outbuildings therefore need planning permission. Some other Parts, including Part 2 and Part 14, do apply to blocks of flats.

Is a maisonette a flat for permitted development purposes?

Usually yes. The GPDO defines a flat as self-contained premises forming part of a building from which they are divided horizontally. A maisonette occupying two floors of a building that also contains another unit below or above it is divided horizontally, so it is a flat and Part 1 does not apply.

Does a vertically divided house keep permitted development rights?

Generally yes. A house split vertically into two self-contained houses, each with its own ground level entrance and full height slice of the building, is two dwellinghouses rather than flats. Each keeps Part 1 rights, measured against the original building as it stood on 1 July 1948 or when built.

Can I add storeys to a block of flats without planning permission?

Part 20 Class A permits up to two additional storeys of new flats on a detached block of flats within height limits and a construction date range, subject to prior approval. The council assesses external appearance, amenity, transport, contamination, flooding and fire safety, and can refuse on any of those grounds.

How do I confirm that works at my flat are lawful?

Apply for a lawful development certificate. Section 192 of the Town and Country Planning Act 1990 covers proposed works and section 191 covers works already carried out. A certificate is the only formal way to confirm lawfulness, and it is considerably less expensive than defending an enforcement notice later.

Sources and further reading

permitted developmentflatsgpdoconversionslandlordsprior approval

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

Permitted development on a house created under Class Q or MA

A dwelling created through a Part 3 prior approval has no Part 1 permitted development rights, so extensions and outbuildings need an application. Curtilage is the harder problem.

Read article →
Permitted Development6 min read

Running a business from home: when permission is needed

Most home businesses need no permission because the use of the house has not materially changed. Visitors, deliveries, noise and storage are what shift the answer.

Read article →
Permitted Development7 min read

Shepherd's huts, pods and mobile structures in a garden

A garden hut can be lawful with no permission at all, or an enforcement risk, depending on whether it is a building and how it is used. The use is what councils look at.

Read article →
Permitted Development6 min read

Cladding, render and external finishes: what needs permission

Re-rendering a house is usually permitted development under Class A. Designated land, listed buildings and Article 4 directions are where that right disappears.

Read article →
Permitted Development6 min read

Does a conservatory count towards the extension allowance

A conservatory attached to the house is an enlargement under Class A, so it uses the same depth allowance as a brick extension, measured from the original rear wall.

Read article →
Permitted Development6 min read

Designated land and the permitted development you lose

Designated land does not have a separate rulebook. The same classes apply with paragraphs switched off, and knowing which ones bite decides whether you need permission.

Read article →