Permitted development for larger rear extensions

6 min readBy PlanScope Editorial Team

The larger rear extension right doubles the standard Class A depth limits, subject to the neighbour consultation scheme. Here is how the procedure runs and what an objection can actually be about.

A single storey rear extension of up to 8 metres on a detached house, or 6 metres on any other house, is permitted development under Class A of the General Permitted Development Order 2015 provided you first go through the neighbour consultation scheme. Larger rear extension prior approval is not a planning application. The council cannot refuse it on design, policy or highway grounds. It can only refuse if an adjoining owner or occupier objects and the council then concludes that the effect on the amenity of adjoining premises is unacceptable.

The right does not apply on designated land, so a conservation area, National Park, National Landscape, the Broads or a World Heritage Site rules it out entirely.

What the larger extension right permits

The ordinary Class A limits for a single storey rear extension are 4 metres for a detached house and 3 metres for any other house. The larger extension provisions double those to 8 and 6 metres respectively, subject to the prior approval procedure.

The other limits stay in place:

  • Maximum height of 4 metres overall.
  • Where the extension is within 2 metres of a boundary of the curtilage, the eaves height must not exceed 3 metres.
  • Single storey only.
  • The extension must not extend beyond a wall forming the principal elevation, or a side elevation fronting a highway.
  • Materials must be similar in appearance to those of the existing house.
  • No verandas, balconies or raised platforms.
  • Together with other buildings, the development must not cover more than half the area of the curtilage surrounding the original dwellinghouse.

Original dwellinghouse means the house as first built or as it stood on 1 July 1948. A previous owner's extension counts against you even though you never built it.

Measuring the depth

Depth is measured from the rear wall of the original dwellinghouse, not from the current rear wall. A house that already has a 3 metre extension has used part of the allowance.

That single point causes more failed notifications than anything else. Before anything is drawn, establish what the original house looked like. Historic mapping, an old sale plan, the council's own planning history and the building's fabric all help.

Measure externally, and measure at the deepest point. Where the rear elevation steps, the projection is measured from each part of the original rear wall it projects beyond.

The neighbour consultation scheme, step by step

  1. Submit to the local planning authority a written description of the proposed development, including how far it extends beyond the rear wall, the maximum height and the eaves height, a plan showing the site and the proposed development, the addresses of all adjoining premises, and your contact address, with the fee.
  2. The authority notifies the owners and occupiers of adjoining premises, meaning those sharing a boundary with the application site, giving them 21 days to object in writing.
  3. If no objections are received within the 21 days, the authority notifies you that prior approval is not required and you may build.
  4. If any objection is received, the authority must consider the impact of the proposed development on the amenity of all adjoining premises, and decide whether to grant or refuse prior approval.
  5. The authority has 42 days from receipt of a valid application to notify its decision. If it does not, you may proceed as described.

Refusal carries a right of appeal to the Planning Inspectorate. A refusal is not a refusal of planning permission, so a full householder application remains available as an alternative route.

What neighbours can and cannot object about

The only consideration is the impact on the amenity of adjoining premises. In practice that means loss of light, loss of outlook, and an overbearing or enclosing effect, assessed for the properties that share a boundary.

Objections about the appearance of the extension, about construction noise and dust, about parking during the works, about party wall matters, about drainage, about loss of a view, or about devaluation of a neighbouring property are all outside the scope. So is an objection from someone who does not occupy adjoining premises.

That narrowness is the strength of the route and also its risk. A single objection from a neighbour on the darker side of the house forces a judgement on light and outlook, and the officer will usually apply a daylight test. Where light is marginal, a short daylight and sunlight assessment applying the established methodology answers the question rather than leaving it to impression.

Talking to the neighbours before submitting is worth more than any drawing. Most objections come from surprise rather than from harm.

Designated land and other exclusions

The larger extension right is not available on article 2(3) land. Check the designation before doing anything else, because the mapping is not always obvious at street level and conservation area boundaries frequently run down the middle of a road.

An Article 4 direction can remove the right in an area that is not designated land, and many authorities have made directions covering estates of consistent character. The right is also unavailable on a flat or maisonette, on a building that is not a dwellinghouse, and where permitted development rights have been removed by condition on the original planning permission. Reading the conditions on the permission that created the house is a two minute job that saves weeks.

Listed buildings are a separate matter again: the works may be permitted development for planning purposes and still require listed building consent, which brings the significance of the building into play and usually means a Heritage Statement is needed.

Notifying completion

The right carries a condition requiring the developer to notify the local planning authority in writing that the development has been completed, as soon as reasonably practicable after completion.

The notification must include the name of the developer, the address of the building, and the date of completion. It is a small administrative step that people skip, and it matters when the house is sold, because a conveyancer will look for evidence that the conditions attached to the permitted development were met.

Keep the notification letter, the council's confirmation that prior approval was not required, and the drawings you submitted, together in one file. That bundle is what a buyer's solicitor will ask for.

When a full application is quicker

Prior approval takes up to 42 days and cannot be refused on design. A householder application takes up to eight weeks and can be refused on anything.

Use the full application route where the scheme is wider than the permitted development limits, where it includes a roof alteration, a balcony or a side extension, where the house sits on designated land, where permitted development rights have been removed, or where the extension needs to exceed 4 metres in height.

Also consider it where you already know a neighbour will object. If an objection is inevitable, the council will be making an amenity judgement either way, and a full application lets you present the design case properly rather than being confined to the narrow prior approval test.

Check whether the house is on designated land, work out the depth of the original rear wall, then decide the route. If you need supporting material for the application, you can see which documents a householder scheme usually needs before you commission anything.

This is general guidance, not legal advice. A lawful development certificate is the only formal way to confirm that works are lawful, and permitted development limits are detailed and change from time to time. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How deep can a larger rear extension be?

Up to 8 metres from the rear wall of the original dwellinghouse for a detached house, and up to 6 metres for any other house, subject to prior approval through the neighbour consultation scheme. Overall height is limited to 4 metres, and eaves height to 3 metres where the extension is within 2 metres of a boundary.

What does original dwellinghouse mean?

The house as it was first built, or as it stood on 1 July 1948 if it was built before that date. Depth is measured from the original rear wall, so an extension added by a previous owner counts against the allowance even though you did not build it. Check the planning history before drawing anything.

What can a neighbour object about?

Only the impact of the proposed development on the amenity of adjoining premises, which in practice means loss of light, loss of outlook and an overbearing effect. Objections about appearance, construction noise, parking, drainage, party wall matters, loss of a view or property values are outside the scope of the assessment.

How long does the prior approval take?

The authority has 42 days from receipt of a valid application to notify its decision. Adjoining owners and occupiers are given 21 days to object. If no objection is received the authority confirms prior approval is not required, and if the authority does not respond within 42 days you may proceed as described.

Does the right apply in a conservation area?

No. The larger extension right is excluded on article 2(3) land, which covers conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites. An Article 4 direction can remove it elsewhere, and rights may also have been removed by condition on the permission that created the house.

Sources and further reading

permitted developmentrear extensionprior approvalneighbour consultationhouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →