Personal service uses and Class E(c)(iii)
Class E(c)(iii) covers services appropriate to a commercial locality, which captures most salons. Conditions on the unit, extraction and sui generis uses are where the risk sits.
A beauty salon, a nail bar or a hairdresser in a high street unit almost always sits inside Class E(c)(iii) of the Town and Country Planning (Use Classes) Order 1987 as amended, which covers any other services appropriate to provide in a commercial, business or service locality. Because movement within Class E is not development, a former shop or office can usually become a salon without a planning application. What stops that in practice is a condition on the existing permission, an Article 4 direction, or a use the council does not accept as falling within the class at all.
So the work before a lease is signed is not an application. It is three checks and, where the answer is uncertain, a certificate.
What Class E(c) covers in three limbs
Class E was created by the 2020 amendment to the Use Classes Order and gathered up the old A1, A2, A3, B1, D1 and D2 uses into one broad commercial, business and service class. Limb (c) deals with services and splits into three.
The first is financial services, the old bank and building society territory. The second is professional services other than health or medical services, which covers estate agents, solicitors' offices open to the public and similar. The third is the catch-all: any other services which it is appropriate to provide in a commercial, business or service locality.
Medical and health services sit separately in Class E(e), and indoor sport, recreation and fitness in Class E(d). Those distinctions matter less than they used to, because all of them are within Class E and a move between them is not development. They matter when a condition on the unit names a specific sub-class.
Appropriate services in a commercial locality
The wording of limb (iii) is a test rather than a list, and the exact words matter. The question is whether the service is one appropriate to provide in a commercial, business or service locality. It does not ask whether the particular street is such a locality, and it does not ask whether the service is retail.
That is why a hairdresser falls here rather than in E(a). Hairdressing is not the retail sale of goods, so the shop class does not fit, but nobody could argue that a hairdresser is inappropriate in a commercial locality. The same reasoning carries dry cleaning reception, shoe repair, key cutting, travel agency, photographic studios and ticket agencies.
Two features recur in the services that sit comfortably in limb (iii): the customer visits during ordinary trading hours, and the activity generates nothing that would be out of place between two shops.
Salons, nail bars and treatment rooms
Hairdressing, barbering, beauty treatment, nail technicians, eyebrow and lash treatments, waxing and non-surgical cosmetic treatments that do not amount to a medical service all read as E(c)(iii). A unit already in Class E can take any of them without permission, and a salon can later become a cafe or an office with the same freedom, subject always to the conditions attached to whatever permission created the unit.
The boundary with Class E(e) medical or health services is the one to watch. Cosmetic treatment given by a beauty therapist is a service. The same treatment delivered as a clinical procedure by a registered practitioner, with prescription-only substances and clinical waste, starts to look like a health service, and in a parade with flats above the council may well take an interest. Where the line falls is fact-specific, and veterinary, medical and health uses in a residential street looks at how that argument runs.
A spa with a sauna, steam room or pool is a different matter again. Those facilities point towards Class E(d) indoor recreation, which is still within Class E but carries its own plant, humidity and noise issues.
Uses that councils treat as falling outside
Some personal service uses are not in the Order at all. Tattoo and piercing studios are not named, and authorities take different views. Several treat them as sui generis, which means a change from a shop needs planning permission, and others accept them within Class E. Do not assume.
Hot food takeaways sit outside Class E altogether and are expressly sui generis, as are drinking establishments, cinemas, live music venues and hot food delivery kitchens. A nail bar is a service. A unit selling hot food to take away is not, however small the kitchen.
Dog grooming, massage and tanning salons occupy ground where practice varies. The honest position is that the Order's language is broad and the council's view of its own high street is what you will be dealing with.
Three things decide the risk on any of these:
- Whether the authority has published a position in a supplementary planning document or past decisions.
- Whether the unit's permission carries a condition restricting the use.
- Whether anything about the operation generates a separate amenity issue the council can hang an objection on.
Ventilation, waste and environmental health
Even where no planning permission is needed for the use, the works and the operation can need consent. Extract ventilation is the common one. Acrylic nail work, solvent-based products, hair treatments and waxing all generate vapour, and a system discharging at low level over a neighbour's window invites a complaint whether or not a planning application was required.
Where a duct is to be fixed to the outside of the building, the external alteration may itself be development. On a listed building it needs listed building consent. In a conservation area a prominent flue will attract attention. A Ventilation and Extraction Statement covering the extract rate, the discharge point, the filtration and the acoustic treatment is the document that answers an environmental health consultation.
Waste deserves a line in any submission. Salon waste includes chemical containers and, for piercing, sharps. Councils expect a named route for both, not an assurance that it is dealt with.
Hours, frontage and residential amenity above
The amenity complaints that reach officers are almost always about hours, plant noise at night, or the appearance of the shopfront. Long evening opening next to a bedroom window is a real issue. So is a condenser unit on a rear elevation three metres from a flat.
Where the unit has residential accommodation above, check whether the upper floors form a separate planning unit, because that changes who your neighbour is and what protection they have. Whether upper floors above a shop are a separate planning unit sets out the test.
Signage is a separate consent regime. Most illuminated signs need advertisement consent under the Control of Advertisements Regulations, and that is a fast application worth making rather than taking a chance on.
An illustrative example
A tenant takes a vacant unit last used as an estate agency in a parade of ten shops with flats above. The lease is signed on the basis that no planning permission is needed for a nail and beauty salon. The original 1998 permission for the parade carries a condition restricting each unit to retail use within Class A1 as it then stood. That condition survives the 2020 reclassification, so an application under section 73 to vary it is needed before the salon can open lawfully. This example is illustrative and not advice on any particular unit.
Confirming the position before fitting out
Where the answer is unclear, the only formal route to certainty is a Lawful Development Certificate. A certificate under section 192 of the Town and Country Planning Act 1990 confirms that a proposed use would be lawful, and it costs a fraction of a fit-out written off because the council took a different view.
Before that, do the free checks. Pull the planning history for the unit and read every condition. Search for an Article 4 direction covering the parade. Ask the council's duty planning service for a view in writing, understanding that an informal view is not binding.
A short Planning Statement setting out the use, the class you say it falls within and the reasoning is what turns a certificate application or a section 73 application into a quick decision. And if the unit has sat empty for a while, ask what the last lawful use actually was rather than what the sign above the door said.
This is general guidance, not legal advice. Use class interpretation turns on the facts of the individual unit, so check the position with your local planning authority or a qualified professional before relying on it, and remember that a Lawful Development Certificate is the only formal way to confirm that a use is lawful.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which reports a change of use is likely to need.
Frequently asked questions
Is a beauty salon Class E?
Yes, in most cases it falls within Class E(c)(iii) of the Use Classes Order 1987 as amended, covering other services appropriate to provide in a commercial, business or service locality. Because movement within Class E is not development, a unit already in Class E can usually become a salon without planning permission, subject to any condition on its permission.
Do I need planning permission to open a nail bar in a former shop?
Usually not, because a shop in Class E(a) and a nail bar in Class E(c)(iii) are in the same class. The exceptions matter though: a condition restricting the unit to a specific use, an Article 4 direction, or external works such as an extract duct. Check the planning history before signing a lease.
Are tattoo studios within Class E?
The Order does not name them, and authorities take different views. Several treat a tattoo or piercing studio as sui generis, which means permission is needed for a change from a shop. Others accept it within Class E. Ask the authority and consider a Lawful Development Certificate under section 192 if the fit-out cost is material.
Does a pre-2020 condition restricting a unit to A1 still apply?
Yes. The 2020 amendment reclassified uses but did not sweep away conditions imposed on earlier permissions. A condition limiting a unit to Class A1 as it then stood continues to restrict the use, and removing it needs an application under section 73 of the Town and Country Planning Act 1990.
What extraction evidence does a salon need?
Where vapour from solvents, acrylics or hair treatments is extracted, the council's environmental health team will want the extract rate, the discharge point and height, the filtration and the acoustic treatment of the fan. Low level discharge near a neighbouring window is the most common cause of complaint and of a refusal.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.