Residential Scale Thresholds

Phasing a scheme to stay below a threshold

7 min readBy PlanScope Editorial Team

Some thresholds are assessed on the application and some on the project as a whole. Here is where phasing is legitimate, where project splitting makes a permission vulnerable, and how the levy treats a phased permission.

Phasing a scheme is ordinary development practice. Phasing it to sit below a threshold is a different exercise, and the question is whether the threshold is assessed on the application in front of the authority or on the project as a whole. For environmental impact assessment the answer is the project, which is why phasing to avoid a planning threshold fails there more often than anywhere else. For the major development definition, the fee bands and the biodiversity small sites route, the answer is closer to the application, and local plan policies increasingly close that gap with aggregation wording.

Legitimate phasing against threshold avoidance

Phasing exists for good reasons. Cash flow, infrastructure sequencing, sales rates, the time it takes to secure a highway agreement, and the practical impossibility of building 200 houses at once.

The distinction a decision maker draws is about the project rather than about your motives. If the land, the access, the drainage and the market are one scheme, it is one project, and applying for half of it does not make it two. If phase two depends on land you do not control, on a different access and on a separate planning case, that is a separate project in substance.

Three tests tend to decide it in practice. Functional interdependence: can phase one operate without phase two? Physical connection: shared access, shared drainage, shared open space. And intention at the time: a masterplan, a promotion agreement or a board paper describing the whole site.

The risk of getting it wrong is not a refusal. It is a permission that a third party can challenge, and a challenge on project splitting goes to the lawfulness of the decision rather than to its merits.

How a phased outline permission handles thresholds

An outline application for the whole site with a phasing plan is the cleanest route, and it is usually the cheaper one too.

Thresholds are then assessed on the whole scheme at outline stage. The application is major development, the full evidence base is required once, and the reserved matters applications that follow deal with detail rather than principle. A phasing condition fixes the sequence, and the infrastructure triggers sit in the obligation.

What this route costs you is the evidence base up front. A transport assessment for 180 units, a full ecology package and a drainage strategy for the whole site are required before the first house is sold. What it buys you is certainty, and a defensible position if anyone asks whether the project was split.

Approach Threshold assessment Main risk
Single outline with phasing plan Whole scheme at outline Full evidence base required up front
Successive full applications, one project Whole project for assessment purposes Challenge on project splitting
Successive applications, separate projects in substance Each application on its own Authority disagrees that they are separate
Outline plus reserved matters per phase Whole scheme, detail per phase Reserved matters scope disputes

Where the whole scheme is assessed regardless

Several thresholds look at the project rather than the application, and it is worth knowing which.

Environmental impact assessment is the clearest. The regulations require the development to be considered as a whole, and the selection criteria expressly include cumulation with other existing and approved development. An application for part of a larger project is screened against the project.

Habitats regulations assessment works the same way, because the test is the effect of the plan or project alone and in combination.

Affordable housing thresholds are increasingly protected by policy wording. Many local plans aggregate contiguous sites in the same ownership, or sites that form part of a larger developable area, or applications submitted within a defined period. Read the adopted policy before assuming a nine unit application escapes the requirement, and read it alongside the practical points in affordable housing tenure split on major sites.

Referral thresholds have their own rules. In London the Mayor's referable categories are set by regulation and apply to the application as submitted, which is explained in Greater London Authority referable thresholds.

Environmental assessment and project splitting

This is the part where good faith is not a defence.

Screening under the Environmental Impact Assessment Regulations 2017 applies to development of a description in Schedule 1 or Schedule 2, with Schedule 2 thresholds expressed in units, floorspace or site area. An authority screening an application for part of a larger project should screen the project, and if it does not, the permission is vulnerable.

Practically, that means two things for a developer. First, if the whole project would be Schedule 2 development, request a screening opinion for the whole project and get the authority's view on the record. A negative screening opinion for the project is worth far more than silence about a phase.

Second, be straightforward in the application. Describe the wider project, explain the phasing, and let the authority screen what is actually proposed. An Environmental Impact Assessment screening opinion obtained on a full description is a shield. One obtained on a partial description is a liability.

Infrastructure triggers written into conditions

Phasing shifts the question from whether infrastructure is provided to when, and that is a conditions and obligations exercise rather than a threshold one.

Workable triggers are measurable and tied to events the authority can observe: before occupation of the fiftieth dwelling, before first use of the access, on implementation of the phase shown on the approved phasing plan. Triggers tied to unobservable events, such as the start of construction of a particular building, create enforcement problems.

Watch the sequencing traps. An obligation requiring a school contribution on the hundredth occupation, in a scheme where phase two may never be built, leaves the authority short. Expect them to want the contribution earlier, and expect to negotiate about it.

And settle the position on what happens if a later phase does not proceed. A phasing plan that assumes completion, with no fallback for the infrastructure, is the obligation most likely to be renegotiated under section 106A later.

Levy and obligation consequences of phasing

Phasing has a genuine and lawful effect on the Community Infrastructure Levy, and it is the one place where structuring the permission properly pays off.

Where a planning permission is a phased permission, each phase is treated as a separate chargeable development under the levy regulations. That means liability arises phase by phase, payment follows the start of each phase, and the relevant charging schedule and indexation are applied at that point. On a long-running scheme that is a cash flow benefit and an indexation risk at the same time.

It also means the phasing has to be defined in the permission itself. A phasing plan approved later by condition may not achieve the same effect, so take advice on the drafting before the decision notice issues rather than afterwards.

Obligations should follow the same logic: contributions expressed per phase, indexed from a stated date, with triggers tied to the approved phasing plan. An Affordable Housing Statement on a phased scheme needs to show the tenure and the delivery sequence phase by phase rather than as a single total.

Setting out the phasing honestly at the start

The approach that works is also the simplest. Describe the whole project in the application, submit a phasing plan, explain the reasons for the sequence, and ask for a screening opinion on the project rather than the phase.

That produces a decision the authority can defend and you can rely on. It also removes the argument that the phasing was designed to avoid something, because you put the whole thing in front of them.

Where a scheme sits just below a threshold for sound reasons, say that too. There is nothing improper about a nine unit scheme on a site that only supports nine units, and the way to demonstrate it is a layout and a capacity argument rather than silence.

Enter your postcode on PlanScope to see which reports a phased scheme is likely to need at each stage.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I split a site into two applications to stay under ten units?

Only if they are separate projects in substance. Decision makers look at functional interdependence, physical connections such as shared access and drainage, and the intention shown by masterplans or promotion agreements. Where the land is one scheme, applying for half of it does not make it two, and many local plans now aggregate contiguous sites in the same ownership.

Does EIA screening look at the phase or the whole project?

The project. The Environmental Impact Assessment Regulations 2017 require the development to be considered as a whole, and the selection criteria include cumulation with other existing and approved development. Request a screening opinion on the full project description, because an opinion obtained on a partial description offers very little protection.

How does the Community Infrastructure Levy treat a phased permission?

Where a permission is a phased permission, each phase is treated as a separate chargeable development, so liability arises phase by phase and payment follows the start of each phase. The charging schedule and indexation apply at that point. The phasing has to be defined in the permission itself rather than approved later.

What makes a good infrastructure trigger on a phased scheme?

A measurable event the authority can observe: before occupation of a numbered dwelling, before first use of the access, or on implementation of a phase shown on the approved phasing plan. Triggers tied to unobservable events create enforcement problems, and an obligation with no fallback if a later phase stalls will be renegotiated.

Is there anything wrong with a scheme that sits just below a threshold?

No, provided the scheme is what the site supports. A nine unit layout on a site that only accommodates nine units is unremarkable. Demonstrate it with the layout and a capacity argument rather than leaving the authority to infer a motive, and describe any wider project you control in the application.

Sources and further reading

thresholdsphasingeia screeningcommunity infrastructure levymajor developmentsection 106

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Residential Scale Thresholds

View all →
Residential Scale Thresholds7 min read

Levy liability at 100 square metres or one home

The Community Infrastructure Levy minor development exemption applies below 100 m2 of new floorspace, but never where the development creates a dwelling of any size.

Read article →
Residential Scale Thresholds7 min read

The retail impact assessment threshold of 2,500 m2

The default national threshold for a retail impact assessment is 2,500 m2 of floorspace where a local plan sets no figure. The sequential test has no threshold at all and applies at any scale.

Read article →
Residential Scale Thresholds7 min read

Affordable housing at ten units and the rural option

Affordable housing contributions are not sought below major development, meaning 10 dwellings or 0.5 hectares. In designated rural areas under the Housing Act 1985 a plan may set a threshold of five units or fewer.

Read article →
Residential Scale Thresholds8 min read

One hundred and fifty units and Active Travel England

The residential trigger is 150 units, with further triggers at 7,500 square metres of floorspace and 5 hectares of site area. Here is what the consultee looks at and what answers it.

Read article →
Residential Scale Thresholds8 min read

Eighteen metres and seven storeys, measured properly

Height runs from the lowest adjacent ground to the floor surface of the top storey, not to the parapet. Here is how the storey count, plant exclusions and mezzanine rule actually work.

Read article →
Residential Scale Thresholds7 min read

Why screening thresholds fall away in a sensitive area

Regulation 2(1) makes the sensitive area route an alternative to the thresholds, so four houses can need screening while eight in a conservation area do not.

Read article →