Refusals and Appeals

The appeal form and the documents that go with it

6 min readBy PlanScope Editorial Team

Householder appeals run to a 12-week deadline and most others to six months. Assembling the pack correctly is the difference between a start date and a returned appeal.

More appeals fail at the door than at the decision. The Planning Inspectorate returns appeals that arrive after the deadline, that are missing the decision notice, or that omit drawings the council had, and a returned appeal cannot be resubmitted once the period has expired. The argument never gets read.

So the first job is administrative. Get the pack right, then worry about the case.

Starting the appeal

Appeals are made under section 78 of the Town and Country Planning Act 1990 and submitted through the Planning Inspectorate's online casework service, which walks you through the appeal type and the required documents. A paper form is available where online submission is not practical.

The deadlines are the part to fix first:

Appeal type Deadline
Householder 12 weeks from the date of the decision notice
Most other planning appeals 6 months from the date of the decision notice
Listed building consent 6 months
Non-determination 6 months from the expiry of the determination period

Those periods run from the date on the notice, not the date you received it. Diarise the deadline the day the refusal arrives, and aim to submit a fortnight early, because uploading a large document set the night before is how references get missed.

Documents that must accompany the form

The Inspectorate is deciding the same application the council decided, so it needs everything the council had.

  • The completed appeal form, including the grounds of appeal.
  • A copy of the original application form and the ownership certificate.
  • The decision notice, or evidence of the date the determination period expired on a non-determination appeal.
  • A site location plan with the site edged red, and any land in the appellant's control edged blue.
  • Every drawing submitted with the application, at the same revision numbers the council assessed.
  • Every supporting document, including the Planning Statement, any Design and Access Statement and all technical reports.
  • The officer's report and the consultee responses, where you want the inspector to have them in front of them rather than to look them up.

Two habits help. Name every file so it identifies itself without being opened, using the drawing number and revision. And check the drawing schedule on the decision notice against the files you are uploading, because a permission or refusal usually lists the approved or considered drawings by number.

Serving copies on the council

The council is notified through the casework service, and it is sensible to email the case officer separately to say the appeal has been lodged, quoting the appeal reference once you have it.

That courtesy has a practical purpose. The authority has to complete a questionnaire and return the case file within a short window of the start date, and an officer who knows the appeal is coming produces a more accurate questionnaire. It also opens the door to a conversation about whether the council will contest the appeal, which occasionally ends the matter.

Read the questionnaire when it appears on the case file. It shows what the authority holds, which consultees it treated as relevant, and whether the officer report you have is the final version. On a case that turns on a consultee objection, that document sometimes reveals the objection was withdrawn and never recorded on the register.

What the Inspectorate checks

Validation is administrative rather than merits based. The checks are:

  1. Is the appeal in time.
  2. Does it relate to a decision or a failure to decide that carries a right of appeal.
  3. Is the correct appeal type used, since householder, full and enforcement appeals run different procedures.
  4. Are the required documents present and legible.
  5. Is the appellant the applicant, or someone with the standing to appeal.

An appeal that fails any of these is returned with an explanation and, where time allows, an opportunity to correct it. Where the deadline has passed, there is no discretion to extend it.

Illustrative example: a householder appeal against a rear extension refusal, submitted in week eleven with everything except the two revised elevations issued during the application. The Inspectorate asks for them, the appellant supplies them in week thirteen, and the appeal is valid because the original submission was in time. Had the whole submission slipped to week thirteen, it would have been out of time and unarguable.

Common reasons appeals are returned

The list is short and repetitive. Missing decision notice. Missing plans, particularly revised drawings issued mid-application. Wrong appeal type, usually a householder appeal used for a scheme that includes a new dwelling or a change of use. Appeal made by a person who was not the applicant, without evidence of an interest. And late submission, which accounts for more returns than everything else combined.

One further trap sits behind the form. On a householder appeal the form is the statement, and there is no later opportunity to submit a fuller case. Write the grounds of appeal properly at the point of submission, taking each reason for refusal in turn, rather than treating the form as a placeholder.

Answer the reasons for refusal in the council's own words. Quote each reason, then respond to it: what the policy says, what the scheme does, why the harm alleged does not arise or is outweighed. An inspector reading a statement that never engages with reason three will decide reason three against you.

Timetable after submission

Once validated, the Inspectorate issues a start date and the timetable runs from there. The council returns its questionnaire, then statements are exchanged where the procedure allows for them, interested parties who commented to the council are invited to comment again, and the inspector visits the site.

Site visits are unaccompanied where everything relevant can be seen from public land, and accompanied where access to the property is needed. On an accompanied visit the inspector will not discuss the merits, and attempting to argue the case is counterproductive. Have the plans with you, offer access where it was requested, and point out anything physical the inspector asks about. That is the whole of your role on the day.

Decisions are issued in writing with reasons. On the written representations procedure the whole process typically takes a few months, and the current published timescales are the place to check rather than any figure quoted second hand.

If you think the council behaved unreasonably, a costs application is made separately and usually alongside the appeal. It is not a routine step, and it succeeds where a council refused without evidence, ignored its own officer's recommendation without planning reasons, or failed to substantiate a reason for refusal. The application has to be made in time and set out the unreasonable behaviour and the wasted expense it caused, so keep a note of what each round of correspondence cost you as the appeal runs.

Before appealing, look honestly at whether the refusal reasons can be designed out instead. A resubmission may be free within twelve months and is often faster. Where the objection is technical rather than fundamental, the missing evidence is usually one report: browse what a scheme of your type normally submits or enter your postcode on PlanScope to see which reports the site's constraints suggest.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How long do I have to appeal a planning refusal?

Twelve weeks from the date on the decision notice for a householder appeal, and six months for most other planning appeals, including minor and major applications and listed building consent. Advertisement appeals run to a shorter period. Check the current deadline on the appeal guidance, because the periods differ by appeal type and are applied strictly.

What documents go with a planning appeal?

A completed appeal form, the original application form, the decision notice, the site ownership certificate, a site location plan, every drawing and supporting document submitted with the application, and your grounds of appeal. Add anything the council relied on in its report that you want the inspector to see, such as consultee responses.

Do I choose the appeal procedure?

You state a preference between written representations, a hearing and an inquiry, and the Inspectorate decides. Most householder and minor appeals proceed by written representations. Hearings and inquiries are reserved for cases with complex evidence, significant public interest or a need to test evidence through questioning.

Can I submit new evidence at appeal?

You can submit evidence, but the inspector is deciding the scheme the council refused. Material that was never before the authority is discouraged, and a substantially different scheme is not something an inspector can approve. Where new evidence answers a refusal reason directly, explain why it was not available earlier.

What happens after I submit the appeal?

The Inspectorate checks the appeal is valid and issues a start date. The council then returns its questionnaire and its statement, interested parties comment, and the inspector visits the site. The timetable depends on the procedure and the appeal type, and the current guidance sets out the periods.

Sources and further reading

appealsplanning inspectoraterefusalself-buildplanning process

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals8 min read

Refusal on estate road and adoption standards

Estate road refusals come from the highway authority's adopted design guide. Separating safety points from adoption points is what decides whether the scheme or the appeal succeeds.

Read article →
Refusals and Appeals7 min read

Refusal for loss of a retail frontage in a parade

Loss of retail frontage refusals turn on the adopted plan's frontage boundary and its marketing period, not on town centre impact. Here is the evidence that shifts the recommendation.

Read article →
Refusals and Appeals8 min read

Refusal for tree loss and root protection evidence

Officers refuse for tree loss when the evidence does not show retained trees will survive, or when the layout guarantees a later felling application.

Read article →
Refusals and Appeals7 min read

Refusal for failing the retail sequential test

A sequential test refusal means your site search did not prove no preferable site was available. How to rebuild the evidence and where the 2,500 m² threshold bites.

Read article →
Refusals and Appeals7 min read

Appealing a refusal to approve details under a condition

Refusal of a discharge of conditions application carries a right of appeal under section 78. When to appeal, when to use deemed discharge and when section 73 is better.

Read article →
Refusals and Appeals7 min read

When an application is invalid rather than refused

Invalidation is an administrative act, not a decision, so no appeal lies against it. The national list, the two year rule on local lists, and what to do next.

Read article →