Planning Process

Planning fee exemptions and reductions worth claiming

6 min readBy PlanScope Editorial Team

Works to adapt a home for a disabled occupant are free, so is listed building consent, and so is one resubmission within twelve months. The conditions are where claims fail.

Several planning applications carry no fee at all, and one of them applies to a great many householders without their knowing it. Works to adapt a dwelling for a disabled occupant are free. So is a listed building consent application, so is consent to work on a protected tree, and so is a second attempt at an application that was refused within the last twelve months.

The exemptions sit in the national fee regulations rather than in local policy, so they apply the same way everywhere, and an authority cannot decline one because it is short of money. What it can do is invalidate your application if you claim an exemption you are not entitled to, so the claim needs to be made properly.

Where the exemptions come from

The fee schedule and the exemptions both sit in the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012, as amended. Fees have moved to indexed uprating, so figures change, but the structure of the exemptions has been stable for years.

Read the exemption wording rather than a summary, including this one. The conditions attached to the free resubmission in particular are specific, and the commonest reason a claim fails is that one of them was not met.

Works for a disabled person

No fee is payable where the application relates solely to works designed to improve access for a disabled person to or within a building, or to provide facilities designed to secure that person's greater safety, health or comfort, either in an existing dwelling or in a building open to the public.

The word doing the work is "solely". A ground floor extension providing a wet room and a bedroom for a disabled occupant is exempt. The same extension with a new kitchen and utility room attached to it is not, because the application is no longer solely for those works. Split the scheme if you can, or accept the fee.

In practice authorities ask for a short statement, and sometimes a letter from an occupational therapist or the local authority's adaptations team. Provide it with the application rather than waiting to be asked. A covering note that names the occupant's need in general terms, describes which parts of the scheme address it, and confirms that nothing else is proposed, is usually enough.

Listed building and other heritage consents

Application Fee position
Listed building consent No fee
Relevant demolition in a conservation area No fee
Planning permission for works to a listed building Normal fee applies
Consent for works to a tree covered by a preservation order No fee
Notice of works to a tree in a conservation area No fee
Advertisement consent Normal fee applies

The trap is a scheme needing both. An extension to a listed dwelling needs listed building consent, which is free, and planning permission, which is not. Submitting only the free application because it looked like the whole job is a recurring and expensive mistake, because works carried out without planning permission are unlawful even where the listed building consent was granted.

Applications following a refusal or withdrawal

The concession people call the free go allows one further application without a fee where the earlier application was refused, or withdrawn before a decision, or determined, and the further application is for development of the same character or description on the same site by the same applicant, made within twelve months.

The conditions that catch people:

  • a fee must have been paid on the earlier application
  • the applicant must be the same person or body
  • the site must be the same, so extending the red line can defeat the claim
  • the development must be of the same character or description, so a materially different scheme is a fresh application
  • only one such application is free, so a third attempt is chargeable
  • the twelve months runs from the date of the earlier decision, or from withdrawal

Where you are resubmitting after a refusal, quote the earlier reference and the decision date in the covering letter and on the form. Where amended plans were submitted during the earlier application and the scheme has moved a long way, expect a question about whether the character is the same, and the position on re-consultation after amended plans is a useful guide to how far a scheme can change before it becomes a different one.

Parish, town and community councils, and other concessions

The schedule contains concessionary treatment for some applicants and some categories of development, including applications relating to playing fields made by non-commercial sports clubs and certain applications made by parish, town and community councils. The detail varies by category, and it is the part of the schedule most often amended.

So do not assume, and do not rely on a figure from a previous project. Ask the authority's validation team to confirm the fee in writing before submitting, quoting the category you think applies. A one-line email a week before submission is worth more than an argument afterwards.

Certificates of lawfulness sit outside all of this and are worth knowing about: an application for a certificate for an existing use or operation attracts a fee equal to the fee for an application for that development, while a certificate for a proposed use attracts half that amount.

Claiming the exemption on the form

  1. Tick the fee exemption box on the application form and state which exemption applies.
  2. Name the regulations in the covering letter, and the ground relied on, in one sentence.
  3. Attach the evidence: the earlier decision notice for a free go, or the statement of need for a disabled adaptation.
  4. Where two applications are being made together and only one is exempt, submit them as a pair with a covering note explaining which fee relates to which.
  5. Keep a copy of the validation acknowledgement, because it is the record that the exemption was accepted.

Do not leave the fee field blank without explanation. A blank fee with no claim reads as an omission, and the application goes into the invalid pile while someone works out what you meant.

If the exemption is disputed

Deal with it as a validation question, not as a complaint. Write to the validation team, quote the regulation and the specific limb of it you rely on, set out the facts that satisfy each condition, and ask them to confirm in writing.

Most disputes are about the free go, and most turn on whether the scheme is of the same character. That is a judgement, and the useful move is to show the two schemes side by side with a short schedule of what has changed, so the officer can see the answer rather than having to work it out.

If the authority maintains its position, you have a choice between paying and losing the point. Paying under protest, with a note that you consider the exemption applies, keeps the application moving and preserves the argument for a later refund request. Holding out means your application is not valid and the determination clock has not started, which usually costs more than the fee.

A Planning Statement that sets out the application history clearly also helps here, because the dates and references the exemption depends on are already written down.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

Browse the 66 PlanScope report types to see which supporting documents your application will need alongside the form. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Are disabled adaptations exempt from the planning fee?

Yes, where the application relates solely to works improving access for a disabled person to or within a building, or providing facilities for that person's greater safety, health or comfort. The word solely matters: adding a new kitchen to an otherwise exempt scheme loses the exemption. Provide a short statement of need with the application.

Is listed building consent free?

Yes, and so is an application for relevant demolition in a conservation area, and consent for works to a tree covered by a preservation order. The trap is a scheme needing both listed building consent and planning permission, where only the consent is free. Submitting only the free application leaves the works unlawful.

How does the free resubmission work?

One further application is free where the earlier one was refused, withdrawn before a decision or determined, and the new application is for development of the same character on the same site by the same applicant within twelve months. A fee must have been paid on the earlier application, and only one further application is free.

Can extending the red line affect a free resubmission?

Yes. The site must be the same, so a red line that now includes additional land can defeat the claim. The development must also be of the same character or description, so a materially different scheme is treated as a fresh application. Show the two schemes side by side with a schedule of changes.

Are there concessions for parish councils or sports clubs?

The fee schedule contains concessionary treatment for some applicants and categories, including playing field applications by non-commercial sports clubs and certain applications by parish, town and community councils. The detail is amended often, so ask the authority's validation team to confirm the fee in writing before submitting.

What if the council refuses to accept my exemption?

Treat it as a validation question. Write to the validation team quoting the regulation and the limb relied on, and set out the facts satisfying each condition. If they hold their position, paying under protest keeps the application moving and preserves the argument, whereas holding out means the application is invalid and the clock has not started.

Sources and further reading

planning feesexemptionshouseholderlisted buildingsvalidation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →