Viability, Obligations and Commercial

Planning obligations on a change of use application

7 min readBy PlanScope Editorial Team

A change of use can carry planning obligations even with no new floorspace. Here is what triggers them, where a condition does the same job at lower cost, and how to test a contribution request.

A section 106 change of use application can still carry planning obligations even where not a single square metre of new floorspace is created. The trigger is not construction. It is whether the change in use generates a planning impact that needs to be controlled or mitigated, and whether a condition can do the job instead. For a small business converting a shop to a restaurant or an office to a gym, that usually means one or two narrow obligations rather than the contributions package a housing scheme faces.

Start by asking the officer which obligation they want and which policy requires it. Half the requests that arrive early in a case do not survive that question.

When a change of use attracts obligations

Four situations produce obligations on a change of use with no new build.

The first is where the acceptability of the permission depends on a restriction that has to bind the land rather than the applicant. Limiting a use to a narrower activity than the use class allows is the common example.

The second is where mitigation has to be secured in perpetuity and off site. Habitats mitigation is the clearest case: where a conversion creates new dwellings in a catchment subject to nutrient neutrality or recreational disturbance mitigation, the council will normally require a legal agreement even though nothing is being built.

The third is where the new use generates a demand the council meets through infrastructure, such as a travel plan with a monitoring sum, or a contribution towards on-street parking controls.

The fourth is affordable housing on a conversion creating dwellings above a policy threshold. That is why prior approval routes matter so much commercially, and why councils resist them: a prior approval under the General Permitted Development Order cannot secure affordable housing in the way a full application can.

Restricting the future use through an obligation

The most frequent obligation on a change of use is a restriction on what the premises can become next. Movement within Class E does not need planning permission, so a permission for a shop to become a gym also permits the gym to become a nursery, a clinic or an office. A council that has assessed noise, parking and hours for one of those uses may want to prevent the others.

Two instruments are available. A condition can remove the ability to change within the class, and a section 106 obligation can achieve a similar result as a covenant binding the land. The Planning Practice Guidance treats conditions restricting future permitted changes as something to be used sparingly and with clear justification, so expect the officer to need a reason tied to the evidence rather than a general preference.

Where the concern is the cumulative effect of similar uses in a street, the policy driver is usually a clustering or concentration policy, as discussed in our note on clustering policies for takeaways and betting shops.

Where a condition would do the same job

This is the argument worth having, because conditions cost nothing and agreements cost money and time. Guidance is clear that a condition should be used in preference to an obligation where it can achieve the same planning purpose.

Conditions can usually handle:

  • Opening hours, delivery hours and hours of plant operation.
  • Restricting the floor area given to a particular activity.
  • Requiring and then approving a management plan, an extraction scheme or an acoustic report.
  • Limiting customer numbers or covers.
  • Removing specified permitted changes of use, with justification.
  • Requiring works such as cycle parking or a bin store before first use.

Obligations are needed where money changes hands, where an obligation has to run with the land in a way a condition cannot achieve, where something must be done off site on land the council or a third party controls, or where the commitment is positive and continuing over years.

If the council asks for an agreement to do something a condition could do, say so in writing and ask them to identify why a condition is inadequate. The answer is sometimes administrative convenience, and that is not a planning reason.

Contributions where there is no new floorspace

Community Infrastructure Levy liability is calculated on net additional floorspace, so a change of use within an existing building with no extension often produces no chargeable amount, and the in-use building rules can reduce the figure further where the building has been in lawful use for the required period. Check the charging authority's schedule and the in-use evidence you can prove, because the evidential burden sits with the applicant.

Section 106 contributions are a different matter and are tested against regulation 122 of the Community Infrastructure Levy Regulations 2010: necessary to make the development acceptable in planning terms, directly related to the development, and fairly and reasonably related in scale and kind. A request for a general contribution towards town centre upgrades, unconnected to any impact of your change of use, does not meet that test.

Illustrative example: a 140 square metre shop converting to a hot food takeaway, where the council initially sought a streetscape improvement contribution and a travel plan sum. The streetscape request was withdrawn once the applicant asked which impact of the change of use it mitigated. A litter management obligation and conditions on hours and extraction were agreed instead. The circumstances are illustrative and used to show how scope narrows.

Indexation and monitoring fees apply to obligations on small schemes as much as large ones, a point covered in our note on deferred contributions and indexation.

Occupier restrictions and whether they hold

Applicants sometimes offer a restriction to a named occupier to get a permission through, and councils sometimes ask for one. Permission normally runs with the land, and a personal permission is treated as a rare departure from that.

Think carefully before offering one. A permission tied to your company is worth very little on sale or assignment, and a lender may treat it as a defect. Where the council's concern is the character of the operation rather than the identity of the operator, a description of the activity in the obligation is more durable: hours, floor area split between activities, whether alcohol is served for consumption on the premises, whether deliveries are made by the operator.

Enforceability also matters. An obligation is enforceable against the owner and successors in title, so a tenant applicant will normally need the freeholder to join the deed. Sort that out at the start. Getting a freeholder's solicitor engaged after the committee resolution is where change of use timetables collapse.

What it costs and how long it takes

Expect the council's legal costs, your own legal costs, and a monitoring fee for each obligation requiring monitoring. Councils publish their legal fee bases and monitoring charges at varying levels of detail, so ask for the figures early rather than discovering them at engrossment.

On time, a simple unilateral undertaking with one restriction can be completed in a few weeks. A bilateral agreement involving a freeholder, a mortgagee and a council legal team commonly takes longer than the determination period, which is why officers ask for heads of terms before committee.

For short term occupation, a temporary permission can avoid the whole exercise. That route and its limits are set out in our note on meanwhile use and temporary permissions.

Negotiating the scope down

Five moves work, in roughly this order.

  1. Ask which adopted policy requires each item and read it.
  2. Test each item against the three limbs of regulation 122 in writing.
  3. Offer a condition wherever a condition can do the work.
  4. Where a contribution survives the tests, argue the scale by reference to the actual impact of your use rather than to a formula written for new build.
  5. Offer a unilateral undertaking with tight drafting rather than waiting for the council's draft agreement.

Where a scheme creates dwellings and an affordable housing request follows, the Affordable Housing Statement has to engage with the policy threshold and the reasons a conversion cannot deliver on site, rather than asserting that none is possible.

And keep the correspondence. A clear written record of what was asked, what policy was relied on and what was agreed is the material an appeal statement is built from if the request is pressed and you refuse it.

This is general guidance, not legal advice, and policy requirements vary between authorities, so check the position with your local planning authority and a qualified professional before relying on it. PlanScope produces AI-assisted drafts of the supporting documents a change of use application needs, structured to UK planning policy. Enter your postcode to see which reports your site needs.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I pay the Community Infrastructure Levy on a change of use?

The levy is calculated on net additional floorspace, so a change of use within an existing building with no extension often produces no chargeable amount. Where the building has been in lawful use for the period the regulations require, the in-use building rules can reduce the figure further. The evidence of lawful use is the applicant's to provide.

Can a condition stop the premises changing use again?

Yes, a condition can remove specified permitted changes, including movement within Class E, but guidance treats such conditions as something to be used sparingly and with clear justification. Expect the officer to need a reason tied to the assessment of noise, parking, hours or amenity rather than a general preference for control.

Should I offer a personal permission to get consent?

Think hard first. Planning permission normally runs with the land and a personal permission is exceptional, so tying consent to your company reduces the value of the property and can trouble a lender. Where the council's concern is the character of the operation, describe the activity precisely in a condition or obligation instead of naming the operator.

Does my landlord have to sign the section 106 agreement?

Usually yes. An obligation binds the owner and successors in title, so a tenant applicant will normally need the freeholder, and sometimes a mortgagee, to join the deed. Raise it at the start of the application rather than after the committee resolution, because assembling the parties is what delays completion most often.

How do I challenge a contribution request?

Test it in writing against the three limbs of regulation 122 of the Community Infrastructure Levy Regulations 2010: necessary to make the development acceptable, directly related to the development, and fairly and reasonably related in scale and kind. Ask which adopted policy requires it and what evidence supports the amount. Requests unconnected to any impact of your change of use fail the first limb.

Sources and further reading

section 106change of useplanning obligationscilconditions

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial8 min read

Marriage value and site assembly in a viability appraisal

Assembly costs are real, but most of them do not reduce what a scheme can contribute. Where acquisition costs, ransom premiums and created marriage value each belong in the appraisal.

Read article →
Viability, Obligations and Commercial7 min read

Varying a planning obligation after five years

After the five year relevant period, a statutory application under section 106A replaces negotiation, and a refusal can be appealed under section 106B. What the authority can decide and what it cannot.

Read article →
Viability, Obligations and Commercial7 min read

Social infrastructure contributions and how they are justified

Contribution requests are built from a yield factor, a capacity claim and a published cost. The arithmetic is usually right, so the argument belongs on the capacity evidence and the statutory tests.

Read article →
Viability, Obligations and Commercial7 min read

Pooling restrictions and clawback in planning obligations

Regulation 123 and the five obligation pooling cap went in September 2019. What remains is the statutory test in regulation 122, the infrastructure funding statement, and careful drafting against duplication.

Read article →
Viability, Obligations and Commercial8 min read

Indexation of section 106 contributions and which index applies

The index family and the base date decide how far an indexed contribution moves. Name the series exactly, set the base date to the prices the figure is expressed in, and recalculate every demand.

Read article →
Viability, Obligations and Commercial8 min read

Phasing a scheme to manage section 106 triggers

Phasing moves when obligations fall due rather than how much they total. Define phases by land parcel, build in a revised phasing plan mechanism, and tie affordable delivery to occupation within each phase.

Read article →