Planning permission for bin and cycle stores at flats

7 min readBy PlanScope Editorial Team

Flats have no outbuilding permitted development rights, so a roofed forecourt store needs permission. Capacity standards, carry distances and design decide it.

Bin store planning permission for flats is needed in almost every case, and the reason catches landlords out. The householder permitted development rights in Part 1 of Schedule 2 to the General Permitted Development Order apply to dwellinghouses, and the Order's definition of that word excludes flats and buildings containing flats. So there is no outbuilding right to fall back on, and a roofed refuse or cycle enclosure on the forecourt of a converted Victorian villa is a building requiring planning permission.

What decides the application is rarely policy in the abstract. It is the council's adopted waste storage standards, the collection distances its waste service will accept, the cycle parking standard in the local plan, and whether the thing looks acceptable from the pavement.

Why a forecourt store almost always needs permission

Part 2 Class A of the Order permits gates, fences, walls and other means of enclosure, subject to height limits of 1 metre where adjacent to a highway used by vehicular traffic and 2 metres elsewhere. A low screen wall around bins can sometimes be built under that class. A store with a roof cannot, because a roofed structure is a building rather than a means of enclosure.

Add the usual complications. The forecourt sits forward of the principal elevation, where councils are least tolerant of clutter. Many converted blocks sit in conservation areas, where the character of the street and the boundary treatment are protected. Boundary walls are frequently the original feature that gives the terrace its coherence, and removing part of one to form an opening is itself development in many cases.

The practical conclusion is to apply. A refusal for building without permission, followed by an enforcement notice requiring removal, costs far more than an application fee.

Refuse and recycling capacity standards

Start with the council's published waste storage standards, which most authorities issue as a supplementary planning document or a technical note from the waste service. They are usually expressed as litres of container capacity per dwelling per week, split between residual waste, dry recycling and often food waste and garden waste, and they are derived from the British Standard code of practice for waste management in buildings.

An illustrative calculation shows how the sums work. Assume eight flats, a weekly collection, and an adopted standard of 100 litres of residual capacity and 100 litres of recycling capacity per dwelling per week. Eight multiplied by 100 gives 800 litres of residual and 800 litres of recycling. One 1,100 litre wheeled container covers each stream, so the store needs to hold two 1,100 litre bins plus separate provision for food waste. Those containers are roughly 1.25 metres wide and 1.1 metres deep, so the internal footprint needs to be around 3 metres by 1.5 metres with room to manoeuvre them out.

Those capacity figures are illustrative. Take the real ones from the adopted standard, and check the collection frequency, because a fortnightly residual collection doubles the storage requirement.

Collection distances and what the waste team requires

The waste service, not the planning officer, usually decides whether the arrangement works. Three distances matter.

  1. The distance the collection crew must drag a loaded container from the store to the vehicle, commonly limited to around 25 metres on a level surface with no steps or kerbs.
  2. The distance residents must carry waste from their front door to the store, which councils usually want kept short, and which matters more in a block with elderly occupiers.
  3. The distance and manoeuvring space the refuse vehicle itself needs, including any reversing distance, which highway officers restrict.

Then look at the surface. Dragging 1,100 litre containers over gravel, up a step or across a sloping forecourt will get the layout rejected, and a level bound surface with a dropped threshold is what the service will ask for. Gates should open outwards or slide, and the opening width needs to exceed the container width with clearance.

Consult the waste team before you submit. Many authorities offer a free informal check, and their written comment attached to the application removes the most likely objection in advance.

Cycle parking standards and secure design

Cycle parking is a policy requirement rather than a courtesy. In London, Policy T5 of the London Plan 2021 sets minimum long-stay and short-stay cycle parking standards for residential development, with long-stay provision scaled to the number of bedrooms per unit. Outside London the local plan or a parking standards supplementary planning document sets the equivalent figures. Find the number before you design the enclosure, because retrofitting two more spaces into a finished design is awkward.

Design matters as much as the count. Spaces should be usable, which means Sheffield stands at proper spacing rather than wheel-bending racks, step-free access from the street, a lockable door or gate, lighting, and a roof. Two-tier racks count towards the standard in many authorities only where a lifting mechanism is provided. Where the forecourt is small, a well-detailed timber store with a green roof holding six bikes will get further than a larger metal container.

A store that is inconvenient does not get used, and bicycles then end up in the communal hallway, which is a fire safety problem rather than a planning one.

Design, materials and the street scene

This is the part the case officer assesses personally, and it is where applications are lost on schemes that pass every standard.

Design question What usually works
Position Set back behind the boundary wall, to one side of the path, not centred on the frontage
Height Low enough to sit below the boundary wall or railing line where possible
Materials Brick to match the host building, or dark-stained vertical timber boarding
Roof Shallow mono-pitch or a green roof, avoiding felt on a visible surface
Boundary Original wall or railings retained and repaired, with a minimal opening
Planting A hedge or climber to soften the enclosure, shown on the drawing

Draw it properly. A dimensioned plan, two elevations, a section showing the bin inside and a materials note will do more than a photograph of a similar store elsewhere. Include the existing frontage as an elevation so the officer can see what changes. The Design and Access Statement should explain the position by reference to the rhythm of the street rather than capacity alone.

Conservation areas and boundary walls

In a conservation area the authority has a duty under section 72 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to pay special attention to preserving or enhancing character and appearance. Forecourt structures are exactly the kind of incremental change that character appraisals complain about, so expect the design to be tested harder and expect any loss of original boundary wall to be resisted.

Two further points. Demolition of a boundary wall in a conservation area can require planning permission in its own right depending on its size and position, so check before any part of it comes down. And where the building is listed, an enclosure in the curtilage will normally need listed building consent as well as planning permission, and its effect on the setting of the building is assessed under section 66 of the same Act.

Article 4 directions are worth checking too, since they can remove rights you were relying on for associated works such as hard surfacing.

Conditions and management arrangements

Approvals for these structures usually carry three conditions: materials to be approved before construction, the store to be provided before the flats are occupied or within a stated period, and the store to be retained for refuse and cycle storage only. A management condition or a note in the lease covering who moves the containers on collection day, who cleans the store and who holds it is worth offering rather than waiting to be asked.

A short Planning Statement that sets out the capacity calculation against the adopted standard, the carry distances measured on a plan, the cycle space count against the policy figure and the design response to the conservation area appraisal will carry a scheme like this on its own. If the block is also being altered more substantially, the same document can cover the wider works, in the way described in the guide to adding storeys to a block of flats by full application. Larger schemes may also need a Waste Management Strategy rather than a capacity table.

Enter your postcode on PlanScope to see which documents your application is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for a bin store at a block of flats?

Almost always. Part 1 of Schedule 2 to the GPDO 2015 applies to dwellinghouses, and the Order's definition excludes flats and buildings containing flats, so there is no outbuilding right. Part 2 Class A can cover a low screen wall as a means of enclosure, but a roofed store is a building and needs permission.

How much bin capacity does a block of flats need?

Take the figure from the council's adopted waste storage standards, usually issued as a supplementary planning document or a technical note from the waste service and expressed in litres per dwelling per week for each waste stream. Check the collection frequency as well, because a fortnightly residual collection doubles the storage requirement.

How far can bins be from the collection point?

Councils set the limit locally and commonly restrict the drag distance for loaded containers to around 25 metres on a level bound surface with no steps or kerbs. The refuse vehicle's own manoeuvring and reversing distance is a separate constraint set by the highway authority. Consult the waste service before submitting.

How many cycle spaces must a block of flats provide?

In London, Policy T5 of the London Plan 2021 sets minimum long-stay and short-stay standards, with long-stay provision scaled to bedrooms per unit. Outside London the local plan or a parking standards document sets the figures. Spaces must be usable, with proper stand spacing, step-free access, lighting and a lockable enclosure.

Can I remove part of the front boundary wall for access?

Check first. Demolition of a boundary wall in a conservation area can require planning permission in its own right depending on its size and position, and councils generally resist the loss of original walls and railings because they give the terrace its coherence. Where the building is listed, listed building consent may also be needed.

What conditions are attached to a bin store approval?

Typically three: materials to be approved before construction, the store to be provided before occupation or within a stated period, and the store to be retained for refuse and cycle storage only. Offering a short management note covering who moves the containers, cleans the store and holds it usually helps.

Sources and further reading

bin storecycle parkingflatspermitted developmentconservation areawaste storage

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Planning permission for a zip wire course in woodland

A woodland zip wire course needs full planning permission, and the case turns on ancient woodland status, what the anchors and platforms do to the trees, and whether the access can take visitor traffic.

Read article →
Project Type Guides7 min read

Permission for housing on a car showroom site

A car showroom redevelops on its contamination report. Staging the intrusive investigation around demolition is what determines the programme.

Read article →
Project Type Guides7 min read

Permission for a rooftop extension to a car park

Development above a multi storey car park stands or falls on column and foundation capacity. Get the intrusive structural appraisal done before anything else is commissioned.

Read article →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →
Project Type Guides7 min read

Permission for a basement cinema under a listed house

A basement under a listed building needs listed building consent, a structural method statement and usually a basement impact assessment. The statutory duty on harm decides most of these cases.

Read article →