Planning permission for a care home or extra care scheme

7 min readBy PlanScope Editorial Team

The C2 classification decides more about a care scheme than the design does, from affordable housing policy to CIL. Here is how to evidence the use class, the overheating criteria for vulnerable occupants and the parking case.

A care home is Class C2 in the Use Classes Order, and that single classification decides more about a scheme's economics than the design does. C2 sits outside the residential Class C3, which changes how affordable housing policy applies, how the scheme counts towards housing supply, and in many areas whether the Community Infrastructure Levy is charged at all. Extra care and assisted living are the difficult cases, because a scheme with self-contained flats and a care package can fall either side of the C2 and C3 line depending on how it actually operates.

Get the use class question settled early, in writing, with the case officer. Every other argument in the application depends on it.

Use class C2 and where extra care sits

Class C2 covers residential accommodation and care to people in need of care, along with residential schools, hospitals and nursing homes. A registered care home with communal dining, 24-hour staffing and no self-contained tenancies is a straightforward C2.

Extra care housing is not. A scheme of self-contained flats with their own front doors, kitchens and tenancies, where residents buy a care package, looks a lot like C3. Add a registered care provider on site, a minimum care requirement written into the lease, communal facilities and an eligibility test based on care need, and it looks like C2. The Planning Practice Guidance on housing for older and disabled people treats this as a matter of fact and degree, which is honest but unhelpful when you are pricing land.

What tips the balance in practice is the care model rather than the architecture. Set out in the Planning Statement the minimum care hours per resident, the eligibility criteria, the staffing establishment, the communal facilities and the tenure. That is the evidence an officer needs to reach a view, and it is the evidence an inspector will look for if the classification is contested.

Local plan policy on older persons housing

Most recently adopted local plans carry a policy on specialist accommodation for older people, usually with an identified need figure drawn from the strategic housing market assessment. Read it properly. Some plans allocate sites. Some set a locational test requiring proximity to shops, a bus route and a GP surgery. Some apply a mix requirement across care categories.

Where the plan identifies unmet need for care bedspaces, that need is a material consideration weighing in favour of the scheme, and it should be quantified in the application rather than asserted. Where the plan is silent, national guidance on housing for older and disabled people still applies, and the demographic case has to be made from the authority's own evidence base.

Check whether the authority counts C2 bedspaces towards its housing land supply, and on what ratio. The answer affects both the weight given to the scheme and any tilted balance argument.

Affordable housing and obligations for C2 schemes

Whether a C2 scheme attracts an affordable housing requirement depends entirely on the wording of the adopted policy. Plans drafted before extra care became common often define the requirement by reference to dwellings, which C2 bedspaces are not. Newer plans catch C2 expressly, sometimes with a lower percentage or with an off-site contribution instead.

Where a requirement applies and the scheme cannot carry it, a Viability Assessment prepared to the RICS approach is the route, and councils will scrutinise the care operator's rent and care income assumptions closely. Expect to justify the yield, the operator's covenant and the void assumptions.

Other obligations that commonly appear on care schemes are health contributions, contributions towards public open space, a travel plan, and a restriction tying occupation to people meeting a defined care need. That last one protects the use class analysis, and operators generally prefer it to the alternative of an argument later.

Design standards, dementia-friendly layout and daylight

Care buildings are assessed against the same design policies as any other development, but three points recur in officer reports.

Layout for people with dementia matters and it is visible in a plan. Clear sight lines from bedroom doors to communal spaces, short legible corridors, distinct wayfinding between floors, and secure but generous outdoor space all read well and all improve the scheme. So does a sheltered garden that can be used without staff supervision.

Accessibility is governed by Part M of the Building Regulations, and local plans frequently require a proportion of units to meet the higher accessible or wheelchair user standards. On a C2 scheme the wheelchair provision is usually a whole-building question rather than a percentage.

Daylight to communal lounges and to bedrooms is worth testing early. Residents spend far more hours in the building than occupants of general needs housing do, and a single-aspect north-facing lounge is hard to defend. Where the site is tight or surrounded by taller buildings, a Daylight and Sunlight Assessment following the BRE approach should be run at design stage rather than in response to an objection.

Set out the design rationale for all of this in the Design and Access Statement, including the access strategy for residents, staff, visitors and ambulances.

Overheating assessment for vulnerable occupants

Older residents with limited mobility cannot open a window, move to a cooler room, or leave the building. That makes overheating a health issue in a care setting rather than a comfort issue, and assessors treat it differently.

Approved Document O of the Building Regulations sets the compliance route for new residential buildings, including a bedroom criterion, and the dynamic modelling route uses CIBSE methodology. CIBSE TM59 includes a stricter assessment for buildings occupied by vulnerable people, and many London boroughs and an increasing number of other authorities ask for it on care schemes.

Design responses that survive value engineering are the passive ones: orientation, window size and position, external shading, cross ventilation, thermal mass and a considered approach to glazing on south and west elevations. Mechanical cooling added late is expensive to run and unpopular with operators. An Overheating Risk Assessment at concept stage costs less than redesigning the elevations at stage 4.

Staff and visitor parking evidence

Care home parking demand does not look like housing demand. Residents rarely drive. Staff arrive in shifts, and the overlap at changeover is the peak that matters. Visitors cluster at weekends and in the early evening. Deliveries, laundry, clinical waste collection and ambulance access all need space that is not a parking bay.

Local standards for C2 are often expressed per bedspace or per staff member, and they are frequently out of date. Where the standard produces an obviously wrong answer, survey evidence from comparable operating schemes carries more weight than the standard does. A Parking Survey using a recognised methodology, taken across a weekday shift changeover and a weekend afternoon, is the way to make that argument.

Show the shift pattern in the transport evidence, hour by hour, with the number of staff arriving and leaving at each change. An officer who can see the overlap understands the demand profile better than any ratio will convey.

Documents a care scheme application needs

For a purpose-built scheme of any scale, expect the pack to include a planning statement with the use class analysis and the needs case, a design and access statement, transport evidence with parking survey data, an overheating assessment, drainage and flood risk information, ecology and biodiversity net gain material, arboricultural information where trees are affected, daylight and sunlight studies where neighbours are close, and a statement of community involvement where local engagement has taken place.

Where the site is over the major development thresholds, the evidence base grows accordingly, and an environmental impact assessment screening opinion should be requested early rather than assumed. Where an environmental statement is required, the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 require it to be prepared by competent experts, and any AI-assisted draft is a starting point for those experts rather than a substitute for them.

Browse the 66 report types by category to see which documents a care scheme on your site is likely to need, then check them against the council's local validation list.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is extra care housing C2 or C3?

It depends on how the scheme operates. Self-contained flats with their own tenancies look like C3, while a registered care provider on site, minimum care hours written into the lease, communal facilities and an eligibility test based on care need point to C2. National guidance treats it as a matter of fact and degree, so set the care model out in the planning statement.

Does a C2 care scheme have to provide affordable housing?

Only if the adopted local plan policy catches C2 development. Older policies define the requirement by reference to dwellings, which C2 bedspaces are not, while newer plans often apply a requirement expressly, sometimes at a lower percentage or as an off-site contribution. Read the exact policy wording before assuming either way.

Why is overheating treated differently in a care home?

Residents with limited mobility cannot open a window, move rooms or leave the building, so overheating becomes a health risk rather than a comfort issue. Approved Document O sets the compliance route for new residential buildings and CIBSE methodology includes a stricter assessment for vulnerable occupants, which many authorities now ask for on care schemes.

How should care home parking demand be evidenced?

By survey rather than by ratio. Residents rarely drive, staff arrive in shifts with a peak at changeover, and visitors cluster at weekends and early evening. Survey data from comparable operating schemes, taken across a weekday shift changeover and a weekend afternoon, carries more weight than a local standard expressed per bedspace.

Do care bedspaces count towards housing land supply?

Some authorities count them, applying a ratio to convert bedspaces into dwelling equivalents, and others do not. The answer affects the weight given to the scheme and any argument about the balance to be struck, so check the authority's published position in its housing supply statement before framing the case.

Sources and further reading

care homeextra careuse classesc2overheatingolder persons housing

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →
Project Type Guides7 min read

Permission for a basement cinema under a listed house

A basement under a listed building needs listed building consent, a structural method statement and usually a basement impact assessment. The statutory duty on harm decides most of these cases.

Read article →
Project Type Guides7 min read

Tennis court permission in a National Landscape

The playing surface can be made to disappear. A three metre enclosure in open countryside cannot, which is why fence colour, height and extent decide most tennis court applications in a National Landscape.

Read article →
Project Type Guides7 min read

Planning permission for a farm micro distillery

A working still is a general industrial use, which rules out the agricultural conversion shortcuts. Odour abatement, trade effluent and HMRC approval of the spirit store shape the application more than policy does.

Read article →
Project Type Guides7 min read

Planning permission for a rowing club boathouse

Boathouse applications turn on whether the building counts as water-compatible development. That classification keeps a functional floodplain site arguable, and the brief is what puts it at risk.

Read article →