Project Type Guides

Permission for a go-kart or off-road driving track

7 min readBy PlanScope Editorial Team

Motorsport tracks are decided on noise. The temporary use allowance gives 14 racing days a year, and the permanent route turns on background sound levels, bunds and conditions.

A permanent go-kart circuit or off-road driving track is a material change of use of land and needs full planning permission. The temporary route people ask about first, Class B of Part 4 of Schedule 2 to the General Permitted Development Order 2015, allows 28 days of temporary use a year, of which no more than 14 days may be used for motor car and motorcycle racing. Fourteen days will not run a business, and running more of them will produce an enforcement notice rather than an established use.

Noise decides these applications. Everything else is solvable.

Motorsport as a change of use of land

Driving vehicles for recreation on a field is not agriculture, and once the activity is regular and organised it is a use in its own right. The application is for a change of use of land, usually with associated operational development: track surfacing, bunds, a control building, paddock hardstanding, fencing and lighting.

Two procedural points come early. Where the area of the works exceeds one hectare, a permanent racing or test track for motorised vehicles falls within Schedule 2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, so a screening opinion should be requested rather than assumed. And where the site is in the Green Belt, a track and its buildings are inappropriate development unless they fall within one of the exceptions, which pushes the case towards outdoor sport and recreation and towards very special circumstances.

Ask for a screening opinion in writing. A screening direction obtained late is the commonest cause of a twelve-month delay on schemes of this type.

Day limits for temporary motor racing use

Class B permits the use of land for any purpose for not more than 28 days in total in any calendar year, with a sub-limit of 14 days for motor car and motorcycle racing and for markets. The right does not apply to a building or to land within the curtilage of a building, and it is disapplied by an article 4 direction.

Count carefully, because a day is a day whether the activity lasts one hour or twelve. Practice sessions count. Test days count. And where the land has been used under Class B for several years, that does not establish a permanent use, because each year's use is lawful only within the allowance.

Some operators run under Class B while a planning application is determined. That is a reasonable interim position provided the counting is documented and shared with the council, and a poor one if the record is a memory.

Noise assessment and barrier design

There is no single national standard for motorsport noise, which is why these applications produce so much argument.

The expected evidence is a Noise Impact Assessment that measures existing background sound levels at the nearest noise sensitive receptors over a representative period, predicts levels from the proposed activity at those receptors, and assesses the effect against the planning practice guidance on noise and the Noise Policy Statement for England. BS 4142 methods can inform the work, but they were written for industrial and commercial sound and motorsport noise is intermittent, variable in level and tonal in a way the method handles poorly. Expect the acoustician to report maximum levels alongside averaged ones, because complaints follow peaks.

Design responses that work are physical rather than procedural. An earth bund that breaks the line of sight between the exhaust and the receptor outperforms a timber fence of the same height by a wide margin, and bunds can be built from site-won material. Position the noisiest parts of the circuit, the start line and the hardest acceleration zones, furthest from receptors and behind screening. Vehicle noise limits, with static and drive-by testing at the gate, give the operator something enforceable to manage.

A noise management plan then does the rest: limits, testing regime, a complaints log with a response procedure, and a named responsible person.

Dust, surfacing and drainage

Unsurfaced off-road tracks generate dust in dry weather, and dust complaints arrive faster than noise complaints because the evidence lands on the neighbours' washing.

Deal with it in the design. Bound surfacing on the highest-speed and closest-to-boundary sections, a water bowser regime with trigger conditions, and a dust management plan with monitoring at the boundary. Where the site is near an Air Quality Management Area or sensitive habitat, an air quality assessment may be required as well.

Surface water from paddock hardstanding and tyre-scrubbed track surfaces carries hydrocarbons and rubber particulates. The drainage strategy needs treatment before discharge, typically an interceptor with appropriate class and a settlement stage, and it needs a maintenance regime attached. The same issues arise on vehicle-washing sites, as our guide to planning permission for a hand car wash sets out in more detail.

Access, event traffic and rural roads

Most of these sites sit on rural lanes, and the highway case is about peaks rather than averages.

A race day or an open day concentrates arrivals into an hour. The transport work should give measured visibility splays at the access based on recorded speeds, a trip generation for both an ordinary operating day and a peak event, on-site parking laid out for the peak with an overflow area on a firm surface, and a traffic management plan for events including signage and marshalling.

Offer a cap. A condition limiting the number of days on which more than a stated number of vehicles may attend is far easier for a highway officer to accept than an open-ended permission, and it costs the operator very little in practice.

Landscape, restoration and ecology

Bunds, fencing, lighting columns and a control building change how a site reads from the surrounding countryside. Where the site is in or near a National Landscape, a National Park or a valued local landscape, a Landscape and Visual Impact Assessment to GLVIA3 is the expected document, with viewpoints agreed with the officer in advance.

Design the acoustic bunds as landscape elements from the start. A bund shaped and planted to read as a landform does two jobs; a bare linear embankment does one job badly and attracts a refusal reason of its own.

Ecology deserves proper attention on exactly the sites that look least promising. Bare ground, sparse vegetation and disturbed substrates on former quarries and brownfield land support open mosaic habitat, reptiles, and ground-nesting birds including little ringed plover and skylark. Mandatory biodiversity net gain under the Environment Act 2021 applies, the statutory metric must be completed by a competent person, and the biodiversity gain plan must be approved before development begins. Survey seasons are real: reptile surveys run through the warmer months and breeding bird surveys through spring and early summer, so commission early.

How conditions control operation

The permission is the planning judgement. The conditions are what the neighbours live with, so read the draft wording as carefully as you read the officer report.

Expect conditions covering hours of operation by day of the week, the number of days a year on which competitive events may take place, noise limits expressed at identified receptor positions with a measurement methodology, vehicle noise limits and silencer requirements, the maximum number of vehicles on the circuit at once, lighting hours and lux limits at the boundary, a dust management plan, and a restoration scheme where permission is temporary.

Two negotiating points. Ask for noise limits at defined positions with a stated method rather than an absolute limit "at the boundary", because a boundary limit is unmeasurable in practice and unenforceable in a way that helps nobody. And where permission is temporary, make sure the restoration condition is proportionate to what is actually being returned.

A Planning Statement tying the noise, landscape, ecology and highways evidence to the development plan is what the case officer works from. Browse all 66 report types to see the full bundle a site like this triggers.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

How many days a year can I run motorsport without planning permission?

Class B of Part 4 of the General Permitted Development Order 2015 allows temporary use of land for up to 28 days a calendar year, of which no more than 14 days may be for motor car and motorcycle racing. Practice and test days count. The right does not apply to buildings or to land within a building's curtilage, and it can be withdrawn by an article 4 direction.

Does a racing track need an environmental impact assessment?

It may. A permanent racing or test track for motorised vehicles falls within Schedule 2 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 where the area of the works exceeds one hectare, so a screening opinion should be requested rather than assumed. An Environmental Statement must be prepared by competent experts if the development is screened in.

Which noise standard applies to motorsport?

There is no single national standard. The usual evidence is measured background sound levels at the nearest noise sensitive receptors, predicted levels from the proposed activity, and an assessment against the planning practice guidance on noise. BS 4142 methods can inform the work but were written for industrial sound, so maximum levels should be reported alongside averages.

Do earth bunds work better than acoustic fences?

Generally yes, for this use. A bund that breaks the line of sight between the exhaust and the receptor outperforms a timber fence of the same height, it can be built from site won material, and it can be shaped and planted to read as a landform rather than as a barrier. Design it as a landscape element from the outset.

What conditions should a track operator expect?

Hours of operation by day, a limit on competitive event days, noise limits at identified receptor positions with a stated measurement method, vehicle noise limits and silencer requirements, a cap on vehicles on circuit, lighting hours and boundary lux limits, a dust management plan, and a restoration scheme where the permission is temporary.

Sources and further reading

motorsportgo-kart trackchange of usenoisetemporary usegreen belt

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Project Type Guides

View all →
Project Type Guides7 min read

Permission for housing on a car showroom site

A car showroom redevelops on its contamination report. Staging the intrusive investigation around demolition is what determines the programme.

Read article →
Project Type Guides7 min read

Permission for a rooftop extension to a car park

Development above a multi storey car park stands or falls on column and foundation capacity. Get the intrusive structural appraisal done before anything else is commissioned.

Read article →
Project Type Guides6 min read

Permission for a restaurant terrace on the pavement

Removable tables on the public footway need a pavement licence. A terrace on your own forecourt is a planning matter. Most disputes come down to where the highway edge sits.

Read article →
Project Type Guides7 min read

Permission for new gates and railings to a listed house

Boundary structures at a listed house are usually part of the listing, and permitted development rights for means of enclosure do not apply within the curtilage. Both consents are needed.

Read article →
Project Type Guides7 min read

Permission for a basement cinema under a listed house

A basement under a listed building needs listed building consent, a structural method statement and usually a basement impact assessment. The statutory duty on harm decides most of these cases.

Read article →
Project Type Guides7 min read

Tennis court permission in a National Landscape

The playing surface can be made to disappear. A three metre enclosure in open countryside cannot, which is why fence colour, height and extent decide most tennis court applications in a National Landscape.

Read article →