Wales, Scotland and Northern Ireland

Planning Policy Wales and the placemaking outcomes

6 min readBy PlanScope Editorial Team

Welsh national policy starts from sustainable placemaking outcomes rather than topic tests. An English style design statement with a Welsh section added will miss the point.

Planning Policy Wales is built around placemaking, and that is a structural difference from English national policy rather than a matter of tone. Where the National Planning Policy Framework organises itself around topics and tests, Planning Policy Wales starts from a set of sustainable placemaking outcomes and asks whether a proposal contributes to them. An architect moving between the two jurisdictions who treats the Welsh document as a differently worded version of the English one will write a design statement that misses what Welsh officers are looking for.

This article is about Wales. The framework is Planning Policy Wales, Future Wales and the Technical Advice Notes, not the English Framework.

How Planning Policy Wales is structured

Planning Policy Wales sets out the Welsh Government's land use planning policy. It is reissued periodically as numbered editions, and the edition in force when your application is determined is the one that applies, so check the current edition on the Welsh Government website before citing anything.

The document opens with placemaking as an organising idea, then works through themed chapters covering strategic and spatial choices, active and social places, productive and enterprising places, and distinctive and natural places. That structure is deliberate. A proposal is not assessed against a checklist of topics in isolation. It is assessed on whether the combination of decisions it embodies produces a better place.

Sitting above Planning Policy Wales is Future Wales, the national development framework, which forms part of the development plan. Below it sit strategic development plans where they exist and local development plans, and section 38(6) of the Planning and Compulsory Purchase Act 2004 applies in Wales as it does in England, so determination is in accordance with the development plan unless material considerations indicate otherwise.

The placemaking outcomes and how decisions use them

The national sustainable placemaking outcomes are grouped around themes: growing the economy sustainably, making better use of resources, creating accessible and healthy environments, sustaining communities, and protecting the environment while limiting environmental impact.

What matters practically is that officers use them as the framework for the balancing exercise. A scheme that performs well on several outcomes and poorly on one will be assessed on that pattern, and a scheme that ignores the outcomes entirely reads as though it was designed for a different country.

So write to them. A design statement for a Welsh scheme should say, in terms, which outcomes the proposal contributes to and how, with the design decisions that deliver each one identified. Vague assertions of sustainability do not survive this treatment, because the outcomes are specific enough to test against.

Placemaking is also applied at the plan-making stage, which is why local development plan policies in Wales often read more like design objectives than English development management policies.

Planning Policy Wales is explicitly tied to the Well-being of Future Generations (Wales) Act 2015, which places a duty on public bodies, including planning authorities, to work towards a set of well-being goals and to apply five ways of working: long term thinking, prevention, integration, collaboration and involvement.

That connection changes how objections and support are weighed. A planning authority in Wales is not simply applying planning policy. It is discharging a well-being duty through planning policy, and its own well-being objectives are published.

For a designer the useful consequence is the involvement principle. Community engagement carries more weight in Wales than the equivalent English expectation for a scheme of the same scale, and a Statement of Community Involvement that records genuine engagement, and shows what changed as a result, is read rather than filed.

Technical Advice Notes and their status

Technical Advice Notes supplement Planning Policy Wales on specific topics, and they should be taken into account in decisions. They are guidance, they carry weight, and they are the place where the detail sits.

The ones an architect meets most often are the design note, the nature conservation note, the noise note, the transport note, the Welsh language note and the historic environment note. Welsh Government circulars and policy clarification letters sit alongside them and are sometimes the most current statement of a position, which is why checking the Welsh Government planning pages rather than a summary matters.

Numbering and currency vary. Some notes have been revised recently and some are long-standing, and a note that has not been updated for many years still applies unless it has been cancelled. Check the status of the note before relying on it.

Applying the policy in a design statement

Design and access statements in Wales are governed by the Welsh procedure order, and the Welsh form has its own content requirements. The statement is expected to deal with design under a set of headings covering movement, character, community safety, environmental sustainability and access, and to explain the design principles and concepts applied.

That structure maps onto placemaking well, and the mistake to avoid is writing an English style statement and adding a Welsh section. Structure the whole Design and Access Statement around the Welsh headings and use the placemaking outcomes as the framing for the narrative.

Two practical points. Evidence the analysis: site and context appraisal, movement patterns, the character assessment that led to the form chosen. And be specific about environmental sustainability rather than aspirational, because a Sustainability Statement with numbers behind it is worth more than a page of commitments.

Where a scheme is of a scale or prominence that warrants it, independent design review is available in Wales and is taken seriously by authorities. Building the review comments and the response into the statement is a stronger position than presenting a scheme that has not been reviewed.

Where Welsh policy diverges from English practice

The differences worth knowing, beyond structure:

  • The Welsh language is a material consideration in Wales by statute, with language impact assessments required at thresholds set by each local development plan.
  • Future Wales forms part of the development plan, so national policy has development plan status in a way the English Framework does not.
  • The sustainable transport hierarchy and the active travel duties give walking, cycling and public transport a stronger position in Welsh decision making.
  • Placemaking and the well-being duty run through the whole system rather than sitting in a design chapter.
  • Habitats issues, including phosphorus targets on riverine special areas of conservation, are handled through advice from the Welsh environmental regulator with its own method and geography.

None of these are cosmetic, and none of them can be handled by adapting an English document.

Checking which edition applies

Editions of Planning Policy Wales are published with dates, and older editions remain findable online. Cite the edition by number and date, state which chapter you are relying on, and check the Welsh Government planning pages for any policy clarification letter issued since publication.

For an application determined over several months, the edition can change part way through. Where that happens, address the new edition in an update note rather than leaving the authority to work out whether your statement is still current.

PlanScope's drafting is grounded in English national policy and English local plans, so a Welsh application needs the reviewer to check Planning Policy Wales, Future Wales and the relevant Technical Advice Notes before submission. Browse the 66 report types to see which supporting documents a Welsh scheme is likely to need.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is placemaking in Planning Policy Wales?

It is the organising idea of the document. Rather than assessing a proposal against topic tests in isolation, Welsh policy asks whether the combination of decisions a scheme embodies produces a better place, measured against national sustainable placemaking outcomes. Those outcomes cover the economy, resource use, accessible and healthy environments, sustaining communities and environmental protection.

Does Future Wales form part of the development plan?

Yes. Future Wales is the national development framework and forms part of the development plan in Wales, sitting above strategic development plans where they exist and local development plans. That gives national policy development plan status in a way the English Framework does not have, and section 38(6) of the Planning and Compulsory Purchase Act 2004 applies accordingly.

What status do Technical Advice Notes have?

They supplement Planning Policy Wales on specific topics and should be taken into account in planning decisions. They are guidance rather than law, but they carry weight and contain the detail. Welsh Government circulars and policy clarification letters sit alongside them, and a letter is sometimes the most current statement of a position, so check the Welsh Government pages directly.

How is a Welsh design and access statement different?

It follows the Welsh procedure order and its own content requirements, dealing with design under headings covering movement, character, community safety, environmental sustainability and access, and explaining the design principles and concepts applied. Structure the whole statement around those headings rather than adding a Welsh section to an English format.

Which edition of Planning Policy Wales applies?

The edition in force when the application is determined. Editions are numbered and dated, and older ones remain online, so cite the edition and date and check for any policy clarification letter issued since. Where a new edition is published while an application is under consideration, address it in an update note rather than leaving the authority to work it out.

Sources and further reading

walesplanning policy walesplacemakingdesign and access statementfuture walestechnical advice notes

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Householder permitted development in Northern Ireland

Extensions, outbuildings and dormers in Northern Ireland are governed by the Planning (General Permitted Development) Order (Northern Ireland) 2015, not the England Order. The differences are substantive.

Read article →
Wales, Scotland and Northern Ireland7 min read

The two tier planning system in Northern Ireland

Eleven councils determine most applications and the Department for Infrastructure takes the regionally significant ones. The category decides the consultation, the decision-maker and the appeal route.

Read article →
Wales, Scotland and Northern Ireland7 min read

Notification of planning applications to Scottish Ministers

Notification bites after a Scottish authority has decided to approve, not before. The categories that trigger it, what happens during the pause, and why withdrawing a statutory objection is the whole game.

Read article →
Wales, Scotland and Northern Ireland7 min read

The hierarchy of developments in Scotland explained

In Scotland the development category decides whether you must consult the community twelve weeks before applying, how long determination takes and where an appeal goes. Here is how to work out which category applies.

Read article →
Wales, Scotland and Northern Ireland7 min read

Listed building consent in Scotland: categories A, B and C

Scotland grades listed buildings A, B and C, protects interiors as standard and still requires a separate conservation area consent for demolition. Here is how the consent works and who must be consulted.

Read article →
Wales, Scotland and Northern Ireland7 min read

Local place plans in Scotland and what they change

The Planning (Scotland) Act 2019 gave communities a statutory route to set out proposals for land in their area. Registration matters, and so does the timetable.

Read article →