Templates, Checklists and Examples

A pre-application submission checklist for a minor scheme

6 min readBy PlanScope Editorial Team

Pre-application advice is only as good as the pack you send. Here is the drawing set, site information and question list that turns a minor scheme enquiry into a usable written response.

A pre-application enquiry on a one to nine unit scheme returns advice worth having only when the pack lets an officer form a view. Send a sketch and a paragraph and you get a paragraph back, usually restating policy. Send a measured survey, a scaled block plan, the constraints you have already checked and six specific questions, and you get a written response you can design against. This pre-application submission checklist is built around that difference.

Councils charge for the service under their power to charge for discretionary services, so treat it as a purchase with a specification.

Choosing the right service and fee band

Most councils publish a scale of charges with bands by scheme type and size, often separating householder enquiries, minor residential of one to nine units, major schemes and commercial floorspace. Bands usually differ by whether you want written advice only, a meeting, or a meeting plus a follow-up.

Read what each band actually includes before choosing. The common distinctions are whether a site visit is included, whether the response is written or verbal, whether a specialist officer such as highways, conservation or ecology is consulted, and how many rounds of comment you get. On a minor scheme the version worth paying for is almost always the one that brings in the consultees, because their objections are what stop applications.

Two other routes exist. Some authorities offer a short duty officer service without charge for simple questions, which is fine for confirming whether a site is in a conservation area and useless for design advice. Planning Performance Agreements are for major schemes and are disproportionate for nine units.

Check the published service standard for turnaround before you build a programme around it, and remember that advice given is officer advice. It does not bind the council, it is a material consideration of limited weight if the application is later refused, and the committee is free to take a different view.

Drawings that make advice useful

The drawing set does not need to be a planning application set. It needs to be accurate.

  1. A site location plan at a standard scale with the application site edged red and any other land in the applicant's control edged blue.
  2. An existing site plan showing levels, the position of trees with trunk and canopy, boundary treatments, the access and any watercourse or ditch.
  3. A block plan of the proposal at 1:200 or 1:500 showing the footprint, parking, bin and cycle storage, and the relationship to neighbouring buildings.
  4. Existing and proposed elevations at 1:100, even if they are schematic, with storey heights and ridge levels annotated.
  5. A cross-section through the site and the nearest neighbouring property where levels change across the plot.

The section is the drawing officers most often ask for and applicants most often omit. On a sloping site it is the drawing that answers the overlooking question, so include it even in outline.

Photographs help more than renders. Take them from the public vantage points an officer will use, in both directions along the street, and label each with its position on the site plan.

The site information to include

Do the constraint checks yourself and present them, rather than asking the officer to do them. That shifts the conversation from what the site is to what can be built on it.

Set out the planning history with application references, including refusals and any appeal decisions on the site or immediately adjoining it. Give the flood zone from the published flood map, the presence of any Tree Preservation Order, whether the site is in a conservation area or within the setting of a listed building, and whether any part is in an Article 4 direction area. Note the access arrangement and whether the highway is adopted.

Where you already know a specialist report will be needed, say which one and who will author it. An officer who can see that a Flood Risk Assessment is commissioned will spend the response on design rather than on telling you that you need one.

Questions that produce specific answers

Generic questions get generic answers. Write the questions as a numbered list and keep each to a single issue.

Ask whether the principle of the development is acceptable in this location under named policies, and if not, what would change that. Ask which policies the officer will assess the scheme against, and whether any are out of date. Ask whether the proposed ridge height and separation distance meet the council's adopted design guidance, quoting the figures from your drawings. Ask which documents the local validation list requires for a scheme of this size. Ask whether the highway authority is likely to object to the access as drawn, and what would satisfy it. Ask what level of biodiversity net gain evidence the council expects at application stage.

Then ask the question people avoid. If you submitted this scheme tomorrow, what would the officer's recommendation be, and what are the two changes that would most improve it.

What the written response should contain

A usable response names the policies, applies them to the drawings you sent, distinguishes between the officer's view and the consultees' views, and identifies the documents required at validation. It should also say what has not been assessed, because a response silent on highways is not a response that approves the access.

If the response is vague on a point you paid to have answered, go back once with a short, polite email quoting your original numbered question. Most councils will clarify without a further fee where the question was asked in the original submission and not answered.

Recording and using the advice

Keep the advice, the drawings it was given on and the date. When the application goes in, attach the advice and explain in the Planning Statement how the scheme changed in response to it, point by point. That is the single most effective use of pre-application advice, because it lets the case officer see continuity and lets you show reasonableness if the application is refused and costs become relevant.

Where you depart from the advice, say so and give the reason. Silent departure reads as though the advice was ignored.

Be aware that pre-application correspondence is not permanently private. Councils treat it as confidential for a period, but it can be disclosed, and it usually enters the public domain once an application is submitted.

When to go straight to application

Pre-application advice is not always worth the fee and the eight weeks.

Skip it where the proposal is plainly permitted development and what you actually need is a certificate of lawfulness, which answers the point definitively. Skip it where the council has an adopted design guide that answers your question in figures. Skip it where the fee band for your scheme approaches the planning application fee itself and the scheme is simple enough that a refusal would be survivable.

Use it where the principle is properly uncertain, where a constraint such as heritage or flood risk will drive the design, where the site has a refusal history, or where a consultee holds the outcome. On a nine-unit scheme in a sensitive setting, the money buys you the officer's view before you pay for the full Design and Access Statement and the technical pack.

Browse the 66 PlanScope report types to work out which documents your minor scheme will need, then take that list into the enquiry.

This is general guidance, not legal advice. Fee bands, service standards and local validation lists differ by authority, so check the current published position with your local planning authority. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is pre-application advice binding on the council?

No. It is officer advice rather than a decision, it does not bind the authority and the planning committee can take a different view. It is a material consideration of limited weight if the application is refused. Its main value is in reducing the number of surprises at the application stage.

How much does pre-application advice cost?

Councils set their own scale of charges under their power to charge for discretionary services, with bands by scheme size and by what the service includes. Figures differ by authority and are usually reviewed annually, so check the current published scale on the council's website before budgeting.

What drawings should I send with a minor scheme enquiry?

A location plan with the site edged red, an existing site plan showing levels and trees, a block plan at 1:200 or 1:500, schematic existing and proposed elevations with ridge heights annotated, and a cross-section through the site and the nearest neighbour. Add labelled photographs from public vantage points.

Can I rely on pre-application advice at appeal?

You can put it in evidence, and it helps show that the scheme responded to the council's own guidance. It is not determinative. Where a council gave clear written advice and then refused for reasons contradicting it without explanation, that can be relevant to a costs application, but the bar for unreasonable behaviour remains high.

Is my pre-application enquiry confidential?

Not permanently. Councils generally treat pre-application correspondence as confidential for a period, but it can be subject to disclosure and it normally enters the public domain once a planning application is submitted. Do not include anything in an enquiry that you would not want a neighbour to read later.

Sources and further reading

pre-applicationminor developmentself buildplanning processchecklistvalidation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →