Prior approval narrows what a council may consider and runs on a fixed clock. Here is where that helps a landlord, and where a full application is safer.

The prior approval vs planning permission question comes down to what the council is allowed to think about. Under a full application an officer weighs the proposal against the whole development plan and every material consideration. Under prior approval the permission already exists in the General Permitted Development Order, and the council may only consider the short list of matters that the relevant Class sets out. Everything else, including whether the scheme is any good, is outside their reach.

For a landlord converting commercial floorspace or adding storeys, that difference is worth real money. It is also the reason prior approval applications fail on points that have nothing to do with planning merit.

What prior approval actually is

Permitted development rights granted by the Town and Country Planning (General Permitted Development) (England) Order 2015 come in three shapes. Some are unconditional within their limits. Some require you to notify the authority. And a growing number require an application for prior approval of specified matters before the development may go ahead.

Prior approval is not a lesser form of planning permission. The permission is already granted by the Order. What the application does is ask the authority whether it wishes to approve details of the listed matters, and that is the only question in front of it. An officer who refuses because the scheme conflicts with a local plan design policy has, in most cases, stepped outside the Order.

The practical consequence for a landlord is that the assessment is narrower, faster and more predictable, at the cost of being far less forgiving about eligibility.

The closed list of matters

Each Class sets its own list. Class MA, which permits commercial, business and service floorspace in Class E to become dwellinghouses, lists matters including transport and highways impacts, contamination risk, flooding risk, noise from commercial premises, the provision of adequate natural light to all habitable rooms, and in some circumstances the impact on the local provision of services. Upward extension classes in Part 20 add matters such as external appearance, structural strength and the impact on the amenity of the existing building and neighbours.

Two points follow.

The first is that you should answer each listed matter with its own short piece of evidence rather than one document covering everything. A contamination matter is answered by a desk study in the shape of a contaminated land assessment, a flooding matter by the flood map position and, where relevant, a Flood Risk Assessment, and a noise matter by a survey of the neighbouring commercial uses.

The second is that any matter not on the list is not a reason for refusal. Affordable housing, space standards beyond the nationally described standard where it applies as a condition, and the character of the area generally are not prior approval matters under Class MA. Where an officer raises them, a polite letter citing the Class usually resolves it.

The headline is the 56 day determination period that applies to several of the residential conversion classes, running from the date the authority receives a valid application. If the authority does not notify you of its decision within that period, the development may proceed in accordance with the details submitted. Periods differ between Classes and Parts, so read the Order for the Class you are using rather than assuming 56 days.

Deemed consent through the passage of time sounds like a gift. In practice it is a trap, for one reason.

Validity is what decides most disputes

The clock only runs from a valid application. If a required document is missing, the fee is wrong or the description does not match the Class, the authority can say the application was never valid and the deemed consent never arose. That argument surfaces months later, usually when a purchaser's solicitor asks for evidence of lawful implementation.

Three habits reduce the risk. Submit everything the Order lists for that Class, in the order the Order lists it. Pay the correct fee and keep the receipt, checking the current fee schedule because fees are indexed. And ask the authority in writing to confirm the date it treats the application as valid, then diarise the expiry date from that confirmation rather than from your submission date.

Where the stakes are high, a lawful development certificate after the event gives you something a lender will accept. The route and the wording differ, and the prior approval refusal grounds explained here are worth reading alongside this.

Conditions the Order imposes on you

A prior approval does not arrive condition-free. The Order itself attaches conditions to each Class, and they bind whether or not the decision notice repeats them.

Class MA carries conditions including completion within a set period from the date of prior approval, and use only as a dwellinghouse within Class C3. Part 1 Class AA, the upward extension of a dwellinghouse, carries conditions about materials and window positions. Several classes require development to be completed within three years.

These are conditions on the permission, so breaching them is a breach of planning control in the ordinary way, enforceable by the authority. Read them before you design, because a completion deadline changes how you programme the works.

When a full application is the better route

Prior approval is the wrong tool more often than landlords expect.

Situation Why a full application works better
The scheme exceeds a Class limit by a small margin A marginal breach makes the whole development unlawful, with no partial fallback
You want a layout the Class conditions prevent Full permission can be tailored, and conditions negotiated
The building is listed or in certain designated land Most Part 3 and Part 20 rights are disapplied
You need certainty for a lender or a purchaser A decision notice on a full application is easier to explain than a deemed consent
The site has a vacancy or use history you cannot evidence Eligibility failures under Class MA usually turn on records, not merits

There is also a hybrid position worth considering: apply for prior approval, and run the full application in parallel where the fallback argument strengthens the full case. The existence of a genuine permitted development fallback is a material consideration in the full application, and it can do more work than any amount of design argument.

What prior approval leaves unresolved

A prior approval decides the listed matters and nothing else. Building Regulations approval is separate and is where fire safety, structure, ventilation, acoustics between dwellings and accessibility are actually tested. Party wall matters under the Party Wall etc. Act 1996 are separate again, as are rights of light, restrictive covenants and any landlord's consent under a lease.

Biodiversity net gain is treated differently for development permitted by a development order, and the exemptions have been amended since the regime started, so check the current exemption regulations before assuming either position.

None of that appears on the decision notice. It is why a converted building can hold a valid prior approval and still be unlettable, and why the Planning Statement accompanying a parallel full application is often the more useful document to have on file.

This is general guidance, not legal advice. A lawful development certificate is the only formal way to confirm that works are lawful, and you should check the position with your local planning authority or a qualified professional before relying on any permitted development route.

Working out which route your building qualifies for is the first decision, not the last. Enter your postcode on PlanScope to see which reports your site needs. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What can a council refuse a prior approval application on?

Only the matters listed in the relevant Class of the General Permitted Development Order 2015. For Class MA those include transport and highways, contamination, flooding, noise from commercial premises and natural light to habitable rooms. Design quality, affordable housing and general local plan conflict are outside the assessment unless the Class brings them in.

What happens if the council misses the 56 day period?

For the Classes where a 56 day period applies, development may proceed in accordance with the submitted details if the authority has not notified a decision within it. The period only runs from a valid application, so confirm the validation date with the authority in writing and keep the fee receipt and full submitted document set.

Is prior approval the same as planning permission?

No. The permission is granted by the Order itself, and the prior approval application asks the authority to approve details of specified matters. A prior approval is still a permission that carries conditions set out in the Order, and breaching those conditions is a breach of planning control in the normal way.

Can I apply for prior approval and full permission at the same time?

Yes, and it is a common tactic. A genuine permitted development fallback is a material consideration in the determination of the full application, which can strengthen the case for a better designed scheme. You pay two fees and manage two timetables, so it suits schemes where the margin justifies the cost.

Does prior approval cover Building Regulations?

No. Fire safety, structure, ventilation, sound insulation between dwellings and accessibility are tested through Building Regulations, which is a separate approval. Party wall matters, rights of light, covenants and any landlord consent under a lease are separate again and none of them appear on the prior approval decision notice.

Sources and further reading

prior approvalpermitted developmentclass magpdoplanning permissionlandlord

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons6 min read

Extension of time agreement or renewing a permission

Two things that get confused. Extending the determination period is routine; extending the life of a permission is impossible, and section 73 cannot do it either.

Read article →
Comparisons7 min read

Deed of variation or a section 106A application

Two routes to change a planning obligation, with very different tests. Why section 106A is not a viability hearing, and when a fresh application beats both.

Read article →
Comparisons7 min read

Building notice or full plans application to building control

Two routes to building control approval under the Building Regulations 2010. What each involves, where a building notice is unavailable, and how completion certificates and regularisation work.

Read article →
Comparisons8 min read

Dropped kerb approval or permission for a front hardstanding

The crossover is licensed under the Highways Act 1980. The driveway behind it is permitted development only if it is porous or drains inside your boundary. Most people need both approvals.

Read article →
Comparisons7 min read

Strategic Environmental Assessment or Sustainability Appraisal

A local plan appraisal discharges two duties at once: strategic environmental assessment under the 2004 Regulations and sustainability appraisal under section 19(5). Only one has sharp legal teeth.

Read article →
Comparisons7 min read

Environmental permit or planning permission for a waste use

The Environment Agency permits the operation. The waste planning authority decides whether the use belongs there. Both are needed, and a registered exemption is not a planning permission.

Read article →