Use Classes and Change of Use

Protecting a pub: community value and use class

6 min readBy PlanScope Editorial Team

Planning law decides whether a pub may lawfully become something else. Asset of community value listing only buys a community group time to raise the money.

Two separate regimes protect a pub from change of use, and they answer different questions on different timetables. Planning law decides whether the building may lawfully become something else. The assets of community value regime under the Localism Act 2011 decides whether a community group gets time to raise money before it is sold. Groups that treat them as one thing usually lose both.

Understanding pub change of use protection starts with the planning side, because that is the one with teeth.

Why pubs sit outside the use classes

Drinking establishments were moved out of the use classes in the 2020 reforms and are now sui generis, alongside hot food takeaways, cinemas and live music venues. A sui generis use has no class to move around within, so any change of use requires planning permission.

That position was reinforced three years earlier. In 2017 the permitted development rights that had allowed pubs to change to retail, office and other uses were removed, and the demolition of a public house was brought within the requirement for planning permission at the same time.

The practical effect is that there is no quiet route. A pub cannot become a convenience store, a house, a nursery or a gym without an application, and it cannot be knocked down without one. Every proposal is publicised and every proposal can be objected to.

What permission is needed to change or demolish

Proposal Consent needed Who decides
Pub to shop, office or gym Full planning permission for change of use Local planning authority
Pub to dwellings or flats Full planning permission, often with heritage and noise evidence Local planning authority
Demolition of the building Planning permission Local planning authority
Internal alterations to a listed pub Listed building consent Local planning authority
Change to a restaurant while keeping a bar Permission, assessed as partial loss of the pub use Local planning authority

Watch for a scheme presented as a refurbishment that quietly removes the public bar. A change from a pub to a restaurant is a change of use, and a scheme that retains a token servery while converting the rest is assessed on what the building will actually be used for rather than on what the drawings are labelled.

Listing as an asset of community value

The Localism Act 2011 lets a council list land or a building where its current use furthers the social wellbeing or social interests of the local community, and where it is realistic to think it can continue to do so in the next five years. A recent past use can also qualify.

Nomination is restricted to defined bodies: parish councils, neighbourhood forums, certain community interest companies, charities and community benefit societies, and unincorporated groups with a stated minimum number of local electors behind them. The council must decide within eight weeks, the listing lasts five years, and the owner may seek an internal review and then appeal to the First-tier Tribunal.

Our note on nominating an asset of community value covers the paperwork, and what listing does and does not do sets out the limits in detail.

The moratorium, and what it actually buys

This is the part most often misunderstood. Listing does not give anyone a right to buy.

When the owner decides to make a relevant disposal, they must notify the council. An interim moratorium then runs, during which a community interest group may express an interest in bidding. If one does, a longer full moratorium follows before the owner may sell. At the end of it the owner may sell to whoever they choose, at whatever price they choose, and may sell to a developer who bid nothing.

So the moratorium buys time and nothing more. Time is useful, since raising several hundred thousand pounds through a community share offer takes months, but a group that spends the moratorium objecting rather than fundraising has wasted it.

Owners should note that the regime carries a compensation scheme for private owners who incur loss or expense because of a listing, which is claimed from the council.

Local plan policies protecting public houses

The planning protection that actually determines applications sits in the adopted local plan. Policies protecting community facilities commonly require an applicant to demonstrate some combination of the following before the loss of a pub is accepted:

  • That the pub is no longer viable, supported by trading accounts over a stated period.
  • That it has been marketed for a stated period at a price reflecting its value in pub use.
  • That there is adequate alternative provision within a stated walking distance.
  • That the community has been consulted, evidenced through a Statement of Community Involvement.

Read your own plan rather than assuming. The requirements vary between authorities and some have no specific pub policy at all, in which case the argument runs on more general community facility and heritage grounds.

An asset of community value listing is a material consideration in these applications. Its weight depends on how recent it is and whether a group is visibly pursuing acquisition.

Marketing and viability evidence, from the other side

Objectors rarely challenge marketing evidence effectively, and it is usually the weakest part of an applicant's case. Specific things to check and, where wrong, to say so in your representation.

  1. The asking price. Compare it with the sale prices of trading pubs in the area rather than with residential values.
  2. The agent. A general residential agent marketing a pub reaches the wrong buyers.
  3. Where it was advertised. Trade publications and licensed property portals, or a board outside and nothing else.
  4. The particulars. Do they describe the trading potential, the licence and the fixtures, or read as a development opportunity.
  5. Continuity. A period broken into fragments is not the continuous marketing most policies require.
  6. The enquiry log. Were offers received and rejected, and on what basis.

On viability, ask for the trading accounts rather than a summary. A pub run down by a tenant on an unsustainable rent is not the same as a pub with no trade to be had, and the distinction is one inspectors have drawn.

What a community group can realistically achieve

Three outcomes are achievable and one is not.

Achievable: delaying a sale long enough to organise, securing conditions or a policy refusal where the marketing evidence is weak, and buying the pub through a community share offer with grant support where the money can be raised.

Not achievable: forcing an owner to sell at a price the group can afford. No part of either regime does that, and groups that plan on it tend to discover the gap at the end of the moratorium rather than at the start.

The heritage route is worth considering in parallel. Where the building or its interior has architectural or historic interest, listing or local listing can protect fabric that planning policy alone will not, and a Heritage Statement prepared for an application has to address it.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it.

If you want to see what evidence an applicant should be producing, the index of report types by category sets out what each document covers.

Frequently asked questions

Does listing a pub as an asset of community value stop it being sold?

No. Listing triggers moratorium periods once the owner notifies an intention to dispose, during which a community interest group may express an interest and prepare a bid. At the end the owner may sell to anyone at any price. The regime buys time to raise money rather than a right to buy.

Can a pub be converted without planning permission?

No. Drinking establishments are sui generis following the 2020 use classes reforms, and the permitted development rights that previously allowed pubs to change to other uses were removed in 2017. Demolition of a public house also requires planning permission, so every proposal is publicised and open to objection.

Who can nominate a pub as an asset of community value?

Parish councils, neighbourhood forums, certain community interest companies, charities, community benefit societies and unincorporated groups with a stated minimum number of local electors. The council must decide within eight weeks, the listing lasts five years, and the owner may seek a review and then appeal to the tribunal.

What should an objection focus on?

The marketing and viability evidence, which is usually the weakest part of an applicant's case. Check the asking price against trading pub sales rather than residential values, the agent's specialism, where it was advertised, whether the period was continuous, and whether the particulars described a pub or a development site.

Does a change from a pub to a restaurant need permission?

Yes. Both uses sit in different positions under the Use Classes Order, with drinking establishments outside the classes altogether, so the change is material. A scheme that retains a token servery while converting the rest is assessed on the use the building will actually have.

Sources and further reading

pubsasset of community valueuse classescommunityobjections

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Veterinary practices: Class E or sui generis?

Consulting surgeries are usually treated as Class E. Boarding, catteries and dog day care sit outside the Use Classes Order entirely, so a practice doing both runs a mixed use with no fallback.

Read article →
Use Classes and Change of Use7 min read

Dentists, clinics and the limits of Class E(e)

Dentists and clinics sit in Class E(e), so movement from another Class E use is not development. Surgeries attached to a practitioner's home, overnight care and restrictive conditions are where that breaks down.

Read article →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →
Use Classes and Change of Use6 min read

Padel and outdoor sport: consents and conditions

The use class is the easy part. How padel noise is assessed when there is no national method, what the lighting limits require, and when Sport England is consulted.

Read article →
Use Classes and Change of Use6 min read

Self-storage and the limits of Class B8

Self-storage sits within Class B8, but ancillary sales, trade counters and processing all test the edge of the class. Where the line falls and how it is conditioned.

Read article →
Use Classes and Change of Use7 min read

Dog day care and boarding: which consents you need

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Read article →