Permitted Development

Raised platforms, decking and the 300mm trigger

7 min readBy PlanScope Editorial Team

Part 1 of the GPDO excludes raised platforms over 300mm from Class A and Class E, so a deck 310mm above adjacent ground needs permission. How the measurement works and how to design around it.

Decking and raised platform rules catch more householders than any other part of the permitted development regime, because the trigger is only 300mm. Part 1 of Schedule 2 to the General Permitted Development Order 2015 defines a raised platform as a platform more than 0.3 metres high, and both Class A, which covers extensions, and Class E, which covers outbuildings, exclude verandas, balconies and raised platforms from permitted development. Build a deck at 310mm above the adjacent ground and you need planning permission for it, however modest it looks.

That is the whole rule in one paragraph. The difficulty is measuring it, because gardens slope and "adjacent ground" is not always where you think.

Why a raised platform is treated differently

Height changes what people can see. A patio at ground level looks into a neighbour's garden from the same angle the lawn always did. Lift the standing position by half a metre and sightlines over a 1.8m fence open up, which is why the order treats platforms as a separate class of harm rather than as hard surfacing.

The same reasoning explains why verandas and balconies are excluded outright with no height test at all. Anything that creates a usable raised standing area attached to the house sits outside Class A.

Hard surfacing at ground level is different again. Class F allows a hard surface within the curtilage of a house for a purpose incidental to its enjoyment, with the front garden permeability condition attached, so a patio laid on the existing grade is normally fine. The moment it is built up on a frame, the 300mm question arrives.

Measuring the 300mm from the right ground level

Measure from the surface of the ground immediately next to the platform, and where that ground is not level, from the highest part of it. Not from the lowest. Not from an average. Not from the finished floor level inside the house.

Three measurement mistakes recur:

  1. Measuring to the deck boards but ignoring a sub-frame or sleepers that sit proud at the edge
  2. Taking the level from a path or step that was itself built up, rather than from the original ground
  3. Measuring in the middle of a sloping garden where the platform is lower, when the test applies along its whole extent

The practical implication is that the height varies around a platform on sloping ground, and the relevant figure is the greatest height measured from the ground next to it. Our note on measuring height under Part 1 from adjacent ground works through the general rule, which applies to outbuilding and extension heights too.

Guard rails and balustrades are not part of the platform height for the 300mm test, though they are plainly relevant to the privacy judgement if an application becomes necessary.

Decking on sloping gardens

A garden that falls away from the house is the classic case. You want a level sitting area outside the back doors, the ground drops 600mm over five metres, and the only way to get a flat surface is to build up.

Options that keep you inside permitted development, in rough order of practicality:

  • Cut into the slope rather than building out from it, so the finished deck sits within 300mm of the adjacent ground along its length
  • Terrace the garden in two or three steps, each retained and each platform below the trigger, with the retaining structures treated as walls rather than platforms
  • Keep the raised area small and set it away from the boundary, accepting that if any part exceeds 300mm you need permission for the whole thing
  • Lay a ground-level patio next to the house and put the level change further down the garden

Retaining walls bring their own limits. A wall over 1m next to a highway, or over 2m elsewhere, needs permission under Class A of Part 2, and a dug-out terrace can also be an engineering operation in its own right.

Steps, ramps and landings

Steps and a landing giving access to a door are not usually treated as a raised platform where they are no larger than reasonably needed for access. A broad landing with room for a table is a different matter, and officers do look at the footprint.

Ramps for accessibility sit in the same territory. Where a ramp and landing are provided for a disabled occupant, the works may attract a planning fee exemption if permission is needed, and some councils take a pragmatic view on enforcement. Do not rely on that: get it confirmed in writing.

If you want certainty before building, apply for a lawful development certificate for proposed works under section 192 of the Town and Country Planning Act 1990. It costs a fee and takes eight weeks, and it is the only formal way to confirm that works are lawful.

Balconies above a single storey extension

This is where people come unstuck most expensively. A flat-roofed rear extension built under Class A is permitted development. Putting a door onto that roof and using it as a terrace is not, because the result is a balcony or raised platform and both sit outside the class.

The roof itself can be accessible for maintenance. What matters is whether it has been laid out for use: a door or French windows at first floor level, a balustrade, a floor finish. A rooflight and a hatch do not create a terrace. A set of doors and glass balustrading plainly does.

Flats are outside Part 1 altogether, which applies to dwellinghouses only. Any terrace, balcony or roof garden on a flat needs planning permission regardless of height.

And if the house sits in a conservation area or is covered by an Article 4 direction, check what has been withdrawn before assuming anything. Our explainer on how a council makes an Article 4 direction sets out how to find one.

Overlooking objections where permission is needed

Once an application is required, the case turns on privacy and overlooking rather than on height in the abstract. Councils apply local separation distances, a 45-degree test in some householder design guides, and a judgement about whether the raised use would allow direct views into habitable rooms or over private garden areas close to a neighbour's house.

Measures that help, and that officers accept:

  • A privacy screen of 1.7m or 1.8m along the boundary side of the platform, shown on the drawings rather than offered in the covering letter
  • Setting the usable area back from the boundary by a metre or more
  • Reducing the platform to the area actually needed, so the standing position is not along the shared fence
  • Obscure glazed balustrading rather than open rails where the deck sits high

The planning statement is where the privacy argument gets made, with reference to the council's own householder design guidance if it has one.

Showing levels on the section

Drawings win these applications. A plan alone cannot show a height, and an officer who cannot find the 300mm dimension will ask for more information, which adds weeks.

Submit an existing and proposed section through the garden at the critical point, with existing ground level, proposed deck level and the difference dimensioned. Add spot levels on the plan at each corner of the platform, and show the screen in elevation with its height from the deck surface.

Where the works have already been built, the enforcement position matters: time limits for action against unauthorised building works in England changed under the Levelling-up and Regeneration Act 2023, and the current position is set out in our note on enforcement time limits for permitted development breaches. Do not assume the old four-year rule still applies.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that works are lawful.

Enter your postcode on PlanScope to see which documents an application for a raised terrace would need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How high can decking be without planning permission?

Up to and including 300mm above the ground immediately next to it. Part 1 of Schedule 2 to the General Permitted Development Order 2015 defines a raised platform as one more than 0.3 metres high, and Class A and Class E both exclude raised platforms, verandas and balconies. Above that height the whole platform needs permission.

Where exactly is the height measured from?

From the surface of the ground immediately adjacent to the platform, taking the highest part where the ground is uneven. Include any sub-frame or sleepers that stand proud at the edge. Do not measure from the internal floor level, from a path that was itself built up, or from the lowest point of a sloping garden.

Can I use the flat roof of a rear extension as a terrace?

Not under permitted development. A flat roof built under Class A can be accessible for maintenance, but laying it out for use with doors, a balustrade and a floor finish creates a balcony or raised platform, which Class A excludes. That change needs a planning application, and overlooking will be the main issue.

Do the same rules apply to flats?

No. Part 1 of Schedule 2 applies to dwellinghouses only, so flats and maisonettes have no householder permitted development rights at all. Any balcony, roof terrace or raised deck serving a flat needs planning permission whatever its height, and the freeholder's consent is usually needed as a separate matter.

How do I prove my deck is under 300mm?

Keep a dimensioned section drawing and dated photographs with a level staff or tape visible, taken before and after construction. If you want certainty in advance, apply for a lawful development certificate for proposed works under section 192 of the Town and Country Planning Act 1990, which is the only formal confirmation that works are lawful.

Sources and further reading

permitted developmentdeckingraised platformgpdohouseholderoverlooking

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development7 min read

Curtilage and why it limits outbuilding rights

Permitted development for outbuildings applies within the curtilage of the dwellinghouse, and caps coverage at 50 per cent of it. Here is what curtilage means, why it differs from the title, and how to evidence it.

Read article →
Permitted Development7 min read

Article 3(5) and when permitted development is lost

Article 3 of the GPDO 2015 grants permitted development and then takes it away in defined circumstances, including where the building or use relied on is unlawful. Here is how to check the position and confirm it formally.

Read article →
Permitted Development6 min read

Class ZA demolition and rebuild: what it permits

Class ZA of Part 20 covers detached blocks of flats and former office or light industrial buildings. The footprint constraint, the height caps and the prior approval matters that decide most schemes.

Read article →
Permitted Development7 min read

Outbuildings used as a home office or gym

A garden room is permitted development only while the use stays incidental. Sleeping, letting and running a business with visitors all take it outside Class E.

Read article →
Permitted Development7 min read

Means of access under Part 2 Class B of the GPDO

A dropped kerb onto an unclassified road can be permitted development under Part 2 Class B, but only in support of other permitted work, and never onto a classified road.

Read article →
Permitted Development7 min read

Part 11 demolition: what the prior approval decides

The determination is narrow: method and restoration, nothing else. What belongs in the method statement, why conservation areas are outside it, and the 28 day silence rule.

Read article →