Glossary

Rating and background sound levels in BS 4142 work

6 min readBy PlanScope Editorial Team

A BS 4142 assessment turns on the gap between the rating level and the background sound level. Here is how each is derived, corrected and read.

The rating background sound level is really two numbers, and the whole of a BS 4142 assessment turns on the gap between them: the rating level of the sound your plant makes, and the background sound level of the place it makes it in. Get the background wrong and every conclusion downstream is wrong, which is why it is the first thing a reviewer checks.

BS 4142:2014+A1:2019 covers sound of an industrial or commercial character. It does not cover road, rail or air traffic, construction works, people's voices or amplified music, and an assessment that applies it to those sources is misapplied at the outset.

The two levels the method compares

The specific sound level is the equivalent continuous A-weighted sound pressure level from the source under assessment, measured or predicted at the receptor over the reference time interval. The rating level is that figure plus any corrections for acoustic character.

The background sound level is the A-weighted sound pressure level exceeded for 90 per cent of the reference period, written as LA90,T. It describes the quiet underneath the noise rather than the average. That distinction matters because a receptor with an average level of 50 dB might have a background of 33 dB once the passing traffic is stripped out, and the assessment is judged against the 33.

Reference time intervals in the standard are one hour during the day, taken as 07:00 to 23:00, and 15 minutes at night, taken as 23:00 to 07:00.

Deriving the background from measured data

Measure long enough to characterise the period during which the plant will run, not long enough to produce a convenient answer. A single overnight survey is thin evidence for a site whose background varies by day of the week.

Practitioners usually present a table of LA90 values across the survey and then select a representative figure. The standard expects that selection to be justified, and reviewers push back on three habits: quoting the arithmetic mean of LA90 values across dissimilar periods, choosing the modal value without showing the spread, and picking the lowest measured 15-minute period at 04:00 as if it were typical of the whole night.

Say which figure you have adopted, say why, and show the data behind it. Where the background is very low, say that too, because low backgrounds are common on rural and suburban sites and they make the arithmetic unforgiving.

Acoustic feature corrections

Corrections convert the specific sound level into the rating level. The standard sets out four characteristics and indicative penalties.

Characteristic Subjective method correction
Tonality +2 just perceptible, +4 clearly perceptible, +6 highly perceptible
Impulsivity +3 just perceptible, +6 clearly perceptible, +9 highly perceptible
Intermittency +3 where readily distinctive against the residual sound
Other characteristics +3 where the sound is otherwise distinctive

Corrections are cumulative in principle but the standard asks for an overall judgement rather than mechanical addition. A fan with a clear tone and a compressor that cycles will attract more than one, and a reviewer will want to see either the objective reference method for tonality or a clear description of what was heard at the receptor.

The commonest error is applying no correction at all to plant that anyone standing at the boundary would describe as humming. The second commonest is applying a tonal penalty at the source and then forgetting that tonality often survives propagation to the receptor better than broadband sound does. Where the objective one-third octave method is available, use it and show the working.

Reading the difference

The standard describes the difference between the rating level and the background sound level as an initial estimate of impact rather than a pass or fail line.

A difference of around +10 dB or more indicates a significant adverse impact, depending on context. A difference of around +5 dB indicates an adverse impact, depending on context. The lower the rating level relative to the background, the less likely an adverse effect becomes, and where the rating level does not exceed the background the standard points to a low impact, still subject to context.

Context is not a footnote. The standard requires the assessor to weigh the absolute levels, the character of the residual sound, the sensitivity of the receptor and whether mitigation is already built into the design. A rating level 8 dB above a rural background of 25 dB at night is a different proposition from the same excess in an urban yard.

Getting the measurement conditions right

Representative conditions mean weather, operating regime and receptor position all defensible.

  1. Site the microphone in free field where possible, away from reflecting surfaces, and state the height and distance used.
  2. Record wind speed and direction, temperature and rainfall, and exclude periods affected by rain or high wind.
  3. Capture the source operating at its realistic worst case, including any night-time regime.
  4. Log the residual sound with the source off if the specific level has to be derived by subtraction.
  5. State the measurement uncertainty and how it affects the conclusion.

Where the plant does not yet exist, the specific sound level is predicted from manufacturers' data and a propagation calculation. Say which sound power levels were used and where they came from, because a prediction built on optimistic catalogue figures is the single easiest thing for an objector's consultant to take apart. Councils increasingly attach a condition requiring a post-completion verification survey for exactly this reason, and a scheme that offers one voluntarily often reads better at committee. Set out in the report what the verification would measure, at which receptor and within what period after the plant is commissioned, so the condition can be drafted from your own wording rather than a standard template.

Where assessments come unstuck at review

Reviewers see the same failures repeatedly. Backgrounds derived from a period when the plant under assessment was already running. Daytime backgrounds used to assess night-time operation. Receptor positions chosen at the nearest boundary rather than the nearest window of the nearest noise-sensitive property. Corrections omitted because the assessor visited on a windy afternoon and could not hear the tone.

And one that costs applicants time: an assessment that reaches a numerical conclusion and stops, without saying what mitigation is proposed, how much attenuation it delivers, or what the rating level becomes afterwards. Environmental health officers assess the residual position, so give it to them.

A Noise Impact Assessment supporting a planning application should also explain how the scheme sits with the agent of change principle, since who pays to mitigate noise is decided by policy rather than by the standard. If the site also falls within an air quality management area, expect the environmental health team to look at the plant assessment and the emissions case together.

BS 4142 work is a job for a member of the Institute of Acoustics or a similarly qualified acoustician. PlanScope can draft the planning narrative and the policy framing around a noise assessment, and you can see which documents your application needs before instructing anyone. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval, and for specialist technical reports qualified professional input may be required.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified acoustician before relying on it.

Frequently asked questions

What is the background sound level in BS 4142?

It is the A-weighted sound pressure level exceeded for 90 per cent of the reference time interval, written as LA90,T. It describes the quieter underlying sound at the receptor rather than the average level. Reference intervals are one hour during the day, 07:00 to 23:00, and 15 minutes at night, 23:00 to 07:00.

How is the rating level different from the specific sound level?

The specific sound level is the measured or predicted level from the source alone at the receptor. The rating level is that figure after corrections for acoustic character such as tonality, impulsivity and intermittency. Only the rating level is compared against the background sound level when estimating impact.

Does a difference of 10 dB mean the application will be refused?

No. BS 4142 describes a difference of around plus 10 dB as an indication of the highest impact band, and that indication depends on context rather than acting as a refusal threshold. Absolute levels, receptor sensitivity, the character of the residual sound and proposed mitigation all feed into the planning judgement made by the council.

When does BS 4142 not apply?

The standard covers sound of an industrial or commercial character. It is not intended for road, rail or air traffic noise, construction and demolition works, amplified music, public address systems or sound made by people. Residential development affected by transport noise is usually assessed using ProPG and BS 8233 instead.

Who should carry out a BS 4142 assessment?

Councils normally expect a suitably qualified acoustician, typically a member of the Institute of Acoustics, with calibrated Class 1 instrumentation. The assessment involves judgement on representative conditions, feature corrections and context that an unqualified author is unlikely to defend. Professional review is strongly advised before submission.

Sources and further reading

bs 4142noiseacousticsenvironmental healthbackground sound levelglossary

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Stop notice and the compensation risk it carries

Section 183 allows a stop notice only where an enforcement notice has been issued. Section 186 then pays compensation if that notice is quashed on any ground other than the planning merits.

Read article →
Glossary7 min read

Enforcement notice: what it must specify to be effective

Section 173 of the Town and Country Planning Act 1990 fixes what an enforcement notice must say. Where the drafting fails, the notice may be a nullity rather than merely invalid, and that changes what you do next.

Read article →
Glossary7 min read

Non-material amendment: the narrow route to a small change

Section 96A of the 1990 Act lets a council amend a permission where the change is not material, with no statutory definition, no consultation and no right of appeal. How officers judge it.

Read article →
Glossary7 min read

Pre-commencement condition: the consent you now need

Section 100ZA of the Town and Country Planning Act 1990 stops a council imposing a pre-commencement condition without your written agreement or a prescribed notice. Here is how the procedure works and what to do with a condition schedule.

Read article →
Glossary7 min read

Competent person: who the law accepts for which report

Six planning report types carry a statutory competence requirement. Many more only expect a suitably qualified author. The difference changes who can sign and what happens if they cannot.

Read article →
Glossary7 min read

Betterment in highway terms: what a section 278 delivers

A section 278 agreement lets a developer pay a highway authority to improve the existing highway, but only where the authority is satisfied the public benefits. Here is how it is secured and programmed.

Read article →