Planning Process

Registering and tracking a neighbouring application

6 min readBy PlanScope Editorial Team

Councils must keep a public register of planning applications under article 40 of the DMPO 2015. Here is how to find the weekly list, set alerts, read the consultation dates correctly and track amendments and decisions.

If a planning application has gone in next door, the council is required to keep a public register of it, and in most areas you can see the drawings, the officer's report and the decision online without contacting anyone. Article 40 of the Town and Country Planning (Development Management Procedure) (England) Order 2015 requires every local planning authority to maintain that register, in two parts: applications still undetermined, and applications already decided.

The practical problem is not access. It is timing. Consultation periods are short, amended plans arrive without fanfare, and decisions are often issued under delegated powers with no meeting and no announcement.

Finding the weekly list

Every council publishes a weekly list of applications registered as valid in the preceding week. It is the single most useful document for anyone watching an area, because an application appears there before any letter arrives and sometimes before the site notice goes up.

Look for it under planning, then applications, then weekly or fortnightly lists. Most councils publish it as a web page or a PDF organised by ward or parish. Many will also email it to you on subscription.

The list gives you the reference number, the address, a one-line description and the date of registration. The description is written by the applicant, so read it carefully. A proposal described as "alterations and associated works" can be a great deal more than that, and the drawings are the only reliable guide.

Registration is not the same as submission. An application sits with the council for a period before validation, so the date on the weekly list is later than the date it was made.

Setting up alerts

Most planning portals allow you to register an account and track individual applications, which sends an email when a document is added or a decision is issued. Some also allow a saved search by area or postcode radius.

Three things to set up:

  • a tracked application for the specific reference you care about
  • a saved search covering the street or a small radius, to catch related applications on the same land
  • the weekly list by email, as a backstop in case the tracking fails

Alerts do fail. Portals get replaced, email addresses lapse, and some councils only send alerts for certain document types. Check the application page directly every week or two during the consultation period rather than relying on the system to tell you.

Reading the consultation expiry date correctly

This is where people miss their chance. Several dates appear on a typical application page and they mean different things.

Date shown What it means
Registered or valid from The date the council accepted the application as complete
Consultation expiry The last date shown for representations on the publicity carried out
Target decision date When the council expects to decide, often 8 weeks for minor applications
Committee date Where the application is going to a committee rather than an officer

Publicity requirements are set by article 15 of the 2015 Order and vary with the type of application. A site notice generally runs for 21 days, and neighbour notification letters give a stated period. Major development attracts additional publicity, including a press notice, and the rules are set out in our note on publicity for major development.

A representation sent after the expiry date is usually still taken into account if it arrives before the decision is made, because the council must consider material representations it has received. That is not a guarantee, and the officer may have written the report already. Send it early.

Following amended plans

Applications change during determination, and this is the part that is easiest to miss.

There is no general statutory duty to re-consult on amended plans. Councils have their own policies, typically re-consulting where the amendment makes the proposal materially worse for neighbours and not where it improves it. That judgement is made by the case officer.

Check the documents tab rather than waiting for a letter. Sort by date and look for drawings uploaded after the original submission, particularly those with a revision letter in the title. Where an amendment is substantial and you were not re-consulted, write and say so, because failure to carry out required publicity is a procedural point that matters.

Consultee responses appear in the same place. The highway authority, the lead local flood authority, the conservation officer and the parish council all publish their comments there, and they often identify problems more precisely than a neighbour can.

Knowing when a decision has been issued

Most applications are decided by officers under delegated powers. No meeting takes place, and the first public sign is the decision notice appearing on the register.

Where an application goes to a planning committee, the agenda and the officer's report are published in advance, usually five clear working days before the meeting. Read that report in full even if you cannot attend, because it sets out the officer's reasoning, summarises the representations received and recommends an outcome. Public speaking arrangements vary by council and usually require registration a few days beforehand.

After the decision, the notice and the officer report stay on the register. Download both. Councils reorganise their websites and documents sometimes become harder to find once an application is closed.

If the application is refused, the applicant may appeal, generally within six months and within twelve weeks for a householder application. Anyone who made representations is normally notified and their comments are passed to the Planning Inspectorate, so there is no need to repeat them.

A single development often generates several references. Discharge of conditions applications, non-material amendments under section 96A, listed building consent, advertisement consent, tree works in a conservation area and later variations under section 73 all carry their own numbers.

Search by address rather than by reference to find them, and check the planning history section of the application page, which usually lists earlier decisions on the same land. A condition discharge application is where the detail people actually care about gets settled: the materials, the boundary treatment, the hours of construction and the drainage. Those applications rarely attract publicity, and comments on them are not always invited.

If you want to understand what an applicant has committed to, the Planning Statement submitted with the original application and the conditions on the decision notice are the two documents to read together. Our note on building a compliance file after permission is granted explains how those obligations are tracked from the other side.

Keeping a usable record

Keep a simple folder with the reference number, the date registered, the consultation expiry, copies of the key drawings, the officer report, the decision notice and the conditions. Note the dates you checked.

That record is what lets you tell, three years later, whether what has been built matches what was approved. Without it you are relying on a council website that may have changed twice in the meantime.

Browse the 66 report types if you want to understand what the supporting documents on an application are for.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Where do I find applications registered near me?

Every council publishes a weekly list of applications registered as valid in the preceding week, usually under planning and applications on its website, organised by ward or parish. Many councils will email it on subscription. An application often appears there before any neighbour letter arrives and before the site notice goes up.

How long do I have to comment?

Publicity requirements are set by article 15 of the Development Management Procedure Order 2015 and vary by application type. A site notice generally runs for 21 days, and neighbour letters give a stated period. Representations arriving after the expiry date are usually still considered if they reach the council before the decision, but that is not guaranteed.

Will I be told if the plans are amended?

Not necessarily. There is no general statutory duty to re-consult on amended plans, and councils apply their own policies, typically re-consulting where an amendment makes matters materially worse for neighbours. Check the documents tab directly, sorted by date, and look for drawings uploaded later with a revision letter in the title.

How will I know when a decision has been made?

Most applications are decided by officers under delegated powers with no meeting, so the first public sign is the decision notice appearing on the register. Where an application goes to committee, the agenda and officer report are published in advance, usually five clear working days before the meeting.

What happens to my comments if the applicant appeals?

Anyone who made representations is normally notified of the appeal, and the comments already submitted are passed to the Planning Inspectorate. There is no need to repeat them, although you may make further representations on the appeal itself within the period the Inspectorate sets.

Sources and further reading

planning applicationspublic registerconsultationobjectionsweekly list

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →