Trees and Arboriculture

Responding to an allegation of unauthorised tree felling

7 min readBy PlanScope Editorial Team

Cutting down a protected tree without consent is a criminal offence with an unlimited fine. This sets out the offences, the exceptions that provide a defence, and the order in which to respond.

The first letter from a council about a felled tree is usually a request for information, not a charge. How you answer it shapes everything that follows, and the single worst response is a quick email explaining what happened. Cutting down a tree protected by a Tree Preservation Order without consent is a criminal offence under section 210 of the Town and Country Planning Act 1990, the fine on conviction is unlimited, and anything you write is evidence.

Take the letter seriously, answer it accurately and within the deadline, and get the facts established before you offer an explanation.

How allegations reach the council

Most come from neighbours, often within hours. Others come from the council's own tree officer noticing a change, from a ward member, or from an arboricultural contractor who declined the job and reported it.

What the council then has is a report and a gap in a canopy. What it needs, to prosecute, is proof that the tree was protected, that works were carried out, and that they were carried out without consent and without an exception applying. Each of those is capable of being wrong.

The council's usual first step is a notice under section 330 of the Town and Country Planning Act 1990 requiring the recipient to state their interest in the land and the name of anyone else with an interest, or a similar requisition asking who carried out the works. Failure to reply within the stated period, normally 21 days, is itself an offence, and so is knowingly giving false information. Reply, and reply on time.

That is different from being asked to explain yourself. A section 330 notice compels factual answers about interests in land. It does not require you to narrate the events, and a voluntary account written before you know the facts is very hard to withdraw later.

The offences and what they carry

Two offences sit in section 210.

The first covers cutting down, uprooting, wilfully destroying, or wilfully damaging, topping or lopping a protected tree in a manner likely to destroy it, in contravention of an order. This is the serious one, triable either way, with an unlimited fine on conviction. The court is required to have regard to any financial benefit that has accrued or is likely to accrue as a result of the offence, which is why a tree removed to improve a development plot attracts a different level of fine from one removed for light.

The second covers any other contravention of an order, such as pruning without consent where the work was not likely to destroy the tree. It is a summary offence with a lower maximum.

The same offences apply to trees in a conservation area. Section 211 requires six weeks written notice to the council before works to a tree over the size threshold, and carrying out the works without that notice is an offence dealt with in the same way.

A separate duty then follows. Under section 206, a landowner who removes a protected tree in contravention of an order must plant a replacement of appropriate size and species in the same place as soon as reasonably practicable. That duty attaches to the land and passes to later owners.

Where a defence actually lies

Ignorance of the order is not a defence. Nor is the fact that a contractor did the work, if you instructed or permitted it. The real defences are factual, and they are worth investigating properly before responding.

The tree was not protected. Check the order itself, not the council's summary. Common problems include a tree outside the mapped area, a tree not within the schedule where the order protects individually specified trees, an order that was never confirmed, and a tree that was already dead when the order was made.

An exception applied. The Town and Country Planning (Tree Preservation) (England) Regulations 2012 set out the exceptions, and the ones that matter in practice are:

  • The tree was dead. Five working days' notice to the council is required before removal, except in an emergency.
  • The tree presented an immediate risk of serious harm, with notice given to the council as soon as practicable after the works.
  • The works were necessary to implement a full planning permission, which does not include an outline permission.
  • The works were required to comply with a statutory obligation, or to prevent or abate a nuisance.
  • The works were covered by a Forestry Commission felling licence, as discussed in our note on woodland felling licences.

Consent had been given. Check the correspondence, including any email from the tree officer, and any condition on an earlier consent that authorised the work.

You did not cause or permit it. A tenant, a neighbour or a utility contractor acting without your knowledge is a different matter, though the replacement duty under section 206 can still attach to you as landowner.

Responding to the request

A sequence that keeps options open:

  1. Diarise the reply deadline the day the letter arrives.
  2. Obtain the order and its plan and schedule from the council, together with the confirmation date.
  3. Photograph the stump, the arisings and the site before anything is cleared. The stump is the evidence of condition and it disappears quickly.
  4. Instruct an arboriculturist to inspect the stump and any retained material for decay, fungal fruiting bodies, cavities and previous failure, and to give an opinion on the tree's condition at the time of removal.
  5. Collect the contractor's paperwork: the quotation, the method statement, any pre-works inspection, the invoice and any photographs they took.
  6. Answer the section 330 notice with the factual information it requires, in writing, within the period.
  7. Do not offer an explanation of why the tree came down until steps two to five are complete.

If the council invites you to an interview under caution, that is a criminal interview conducted under the Police and Criminal Evidence Act framework. Take legal advice before attending. You are entitled to be represented, and the caution means what it says.

Tree replacement notices and appeals

Where the duty to replace has not been complied with, the council can serve a tree replacement notice under section 207, requiring planting of a specified size and species in a specified place within a specified period. The notice has to be served within four years of the date on which the duty should have been complied with.

There is a right of appeal to the Secretary of State under section 208, and the grounds include that the replacement duty does not apply, that the requirements of the notice are unreasonable in their period or in what they require, that the planting is not required in the interests of amenity or in accordance with good forestry practice, and that the place specified is unsuitable.

An appeal is often the better route where the council has specified an over-large specimen or a position with no soil volume. Support it with arboricultural evidence rather than with assertion, and note that a notice and a prosecution can run in parallel: complying with one does not settle the other.

Evidence that helps a landowner

Evidence Why it matters
Dated photographs of the tree before works Establishes condition, cavities, deadwood and lean
A pre-works arboricultural inspection report The strongest support for a dead or dangerous exception
Written notice given to the council before or after the works Required for the dead tree and immediate risk exceptions
The order, its plan, schedule and confirmation date Establishes whether the tree was protected at all
Contractor instructions and method statement Shows what was authorised and by whom
Correspondence with the tree officer May show consent or an agreed approach
Stump inspection after the event Decay and root condition can still be assessed

Two habits prevent the situation entirely. Commission a tree survey to BS 5837:2012 before any site work and check every tree against the council's order register and the national dataset. And specify pruning properly in writing, because a contractor given a vague instruction will exceed it, as our note on writing pruning specifications explains.

When to take advice

Take legal advice on the day you receive a section 330 notice, a caution letter, or any invitation to interview. Take arboricultural advice before you write anything about the tree's condition. Where a replacement notice is served, take both, because the appeal period is short and the grounds have to be pleaded properly.

Where the felling formed part of a development site, the replacement planting will usually end up in the landscaping scheme, and getting it into a coherent Landscape Strategy is easier than arguing about individual specimens later.

This is general guidance, not legal advice. Tree offences carry criminal liability and turn on the facts and the wording of the order, so take advice from a planning solicitor and a qualified arboriculturist before responding substantively to a council.

Enter your postcode on PlanScope to see which tree and landscape documents your site is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the penalty for felling a tree with a Tree Preservation Order?

Cutting down, uprooting or wilfully destroying a protected tree in contravention of an order is an offence under section 210 of the Town and Country Planning Act 1990, triable either way, with an unlimited fine on conviction. The court must have regard to any financial benefit arising from the offence, so a tree removed to improve a development plot attracts a higher fine.

Is it a defence that I did not know the tree was protected?

No. Ignorance of the order is not a defence, and neither is the fact that a contractor carried out the work where you instructed or permitted it. The defences that work are factual: the tree was not within the order, the order was never confirmed, an exception in the 2012 Regulations applied, or consent had already been given.

Can I remove a dead or dangerous protected tree?

Yes, under the exceptions in the Town and Country Planning (Tree Preservation) (England) Regulations 2012. A dead tree requires five working days written notice to the council before removal, except in an emergency. A tree presenting an immediate risk of serious harm can be dealt with at once, with notice given to the council as soon as practicable afterwards.

How should I answer a section 330 notice?

With the factual information it requires, in writing, within the period stated, which is normally 21 days. Failure to reply is itself an offence and so is knowingly giving false information. The notice compels answers about interests in the land. It does not require you to narrate events, and a voluntary account written too early is hard to withdraw.

Can I appeal a tree replacement notice?

Yes, to the Secretary of State under section 208 of the Town and Country Planning Act 1990. The grounds include that the replacement duty does not apply, that the notice's requirements or period are unreasonable, that the planting is not required in the interests of amenity, and that the specified place is unsuitable. Support the appeal with arboricultural evidence.

Sources and further reading

tree preservation orderenforcementtree fellingreplacement noticelandowners

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Trees and Arboriculture

View all →
Trees and Arboriculture6 min read

Woodland creation on a development site and its upkeep

New woodland is easy to draw and hard to keep alive. The planting design, the establishment regime and the legal mechanism all have to agree with each other.

Read article →
Trees and Arboriculture7 min read

Tree officer site visits and what they inspect

The officer looks at the fence line first. Here is the full checklist, the consequences of an incursion, and the site record that protects you.

Read article →
Trees and Arboriculture7 min read

The five year maintenance condition on new planting

Planting that dies within five years must be replaced in the next planting season. The obligation runs with the land and survives the sale of the house.

Read article →
Trees and Arboriculture7 min read

Tree pits, structural soils and street tree establishment

Street trees fail on soil volume, not species choice. Work backwards from the mature canopy, put the volume on the drawing, and resolve the service corridor first.

Read article →
Trees and Arboriculture7 min read

Tree roots and proximity to a public sewer or drain

Most undertakers control building and planting within around 3m of a public sewer. Resolving that against retained trees is a layout decision, not a condition to discharge later.

Read article →
Trees and Arboriculture8 min read

Ash dieback and what it changes in a tree survey

Infected ash is not automatically a category U tree. How to record crown decline and basal lesions, categorise honestly, and handle protected ash under the 2012 exemption.

Read article →