Resubmitting rather than appealing: how to choose

7 min readBy PlanScope Editorial Team

Appeal when the disagreement is about planning judgement. Resubmit when the disagreement is about the scheme. The rest is timing, fees and the appeal clock.

After a refusal you have two routes, and the choice is usually made badly. People appeal when the reason for refusal could have been designed out in an afternoon, and they resubmit when the council has made a policy judgement that will never change no matter how many times they are asked.

The test is simple to state. Appeal when the disagreement is about planning judgement. Resubmit when the disagreement is about the scheme. Everything else is timing and money.

The three questions that decide it

Work through these in order, and be honest at each one.

Can the reasons for refusal be cured by changing the drawings? If yes, resubmit. An officer who refused because the rear extension projects 0.6 metres too far is telling you what to do. Ignoring that and appealing asks an inspector to overturn the council's own adopted standard, which is a harder argument than simply pulling the wall back.

Do you disagree with the council's planning judgement? If yes, appeal. Refusals that turn on character and appearance, on whether harm to a heritage asset is less than substantial, or on the planning balance are exactly what the appeal system exists to resolve. You will not persuade the same officer to reach a different view by resubmitting the same scheme with a longer covering letter.

Is the refusal reason evidential rather than substantive? If a report was missing, out of date or rejected on methodology, the answer is usually to fix the evidence and resubmit, because an inspector will take the same view of an absent survey that the officer did.

Start with the decision notice itself, and read it properly. Reading reasons for refusal before you decide to appeal is not a formality. Councils sometimes give three reasons where only one carries weight, and the distinction changes the route.

Whether the reason for refusal can be designed out

Some refusal reasons are straightforwardly curable. Overdevelopment of a plot answered by reducing the footprint. Parking shortfall answered by a revised layout or by a parking survey. Loss of daylight answered by hipping the roof away from the boundary. Highway safety answered by improving visibility splays.

Others look curable and are not. A refusal on the principle of development in the Green Belt, in open countryside or in a designated employment area is not a drawing problem. Nor is a refusal based on an absence of very special circumstances, or on conflict with a settlement boundary. Redesigning does not touch the reason.

The middle group is where judgement is needed. Harm to the setting of a listed building, character and appearance in a conservation area, and impact on residential amenity can each move with design, but only so far. Ask the arboriculturist, the heritage consultant or the designer a direct question: can you remove this objection, or only reduce it? A reduction that leaves the officer's conclusion intact is a wasted resubmission.

Householder refusals follow recognisable patterns, and why householder applications are refused most often is worth checking against your own decision notice before you commit either way.

What the officer relationship is worth

Resubmission keeps the decision with a person you can speak to. That is worth something real, and the value is highest where the remaining disagreement is narrow.

Ask for a meeting before you redesign. Most councils will discuss a refused scheme without charge, or through the pre-application service at a modest fee, and the useful output is a sentence you can hold them to: if the rear wall came back to the line of the neighbouring extension, would the objection fall away. Get that in writing if you can, in an email, and reference it in the resubmitted Planning Statement.

The relationship has limits. An officer cannot bind the council, and a recommendation can still be overturned at committee. Where the original refusal came from members against an officer recommendation to approve, resubmission is a poor bet and an appeal is usually the better route, because the inspector is not subject to the same pressures.

The repeat application fee concession

The fees regulations have long included a concession that removes the fee for a repeat application in defined circumstances. The conditions are narrow: the same applicant, the same site or part of it, development of the same character or description as the earlier application, and submission within a limited period after the refusal. One concession per earlier application.

The scope of this has been amended, so check the current fees regulations and confirm the position with the council's validation team before you budget on it. Fee levels are also indexed, which means the published figure changes, and the council's own fee calculator is the safest reference.

Two traps regardless of the current rules. A materially different scheme does not qualify, because it is no longer the same character or description, and the point at which a redesign becomes a different scheme is a matter of the council's judgement. And section 70A of the Town and Country Planning Act 1990 lets an authority decline to determine an application where a similar application was refused on appeal within the past two years, or where it has refused more than one similar application and no appeal was made.

Timescales side by side

Route Statutory period Practical experience
Householder resubmission 8 weeks from validation Often determined in 6 to 8 weeks where the officer already knows the site
Minor resubmission 8 weeks from validation Longer where consultees have to be re-consulted
Householder appeal Expedited written representations Several months from lodging to decision
Written representations appeal No statutory period Longer again, driven by Planning Inspectorate caseload
Hearing or inquiry No statutory period Longest, with a date dependent on availability

The appeal deadlines themselves are short and unforgiving. A householder appeal must be lodged within 12 weeks of the decision notice, and most other section 78 appeals within six months. Miss it and the only route left is a fresh application.

That asymmetry matters. A resubmission can be made at any time, but an appeal cannot, so where the decision is finely balanced the appeal clock is the one to watch.

Cost, including the costs you can recover

There is no fee to lodge a planning appeal with the Planning Inspectorate. The cost of an appeal is professional time: a statement of case, updated drawings where relevant, and for a hearing or inquiry the cost of representation.

A resubmission costs the application fee where the concession does not apply, plus the cost of redesign and any additional reports. On a householder scheme that is usually the smaller number. On a major scheme with a full evidence base already prepared, an appeal can cost less than reworking and reconsulting.

Costs awards run one way most of the time. The Planning Practice Guidance on appeals allows an award of costs where a party has behaved unreasonably and that behaviour caused another party to incur expense. A council that refuses against its own officer advice with no evidence, or that fails to substantiate a reason for refusal, is exposed. That possibility is a reason to appeal a weakly reasoned refusal rather than to redesign around it.

Running both in sequence

Twin-tracking is common and it is legitimate. Lodge the appeal against the refusal to protect the deadline, then submit a revised application addressing the curable points. If the revised scheme is approved, withdraw the appeal. If it is refused, you still have the appeal.

Two cautions. Section 70B allows an authority to decline to determine an overlapping application in defined circumstances, so tell the case officer what you are doing rather than letting them discover it. And an appeal on a scheme you have already conceded is flawed weakens your position, so appeal the original refusal on the points you actually maintain, not on everything.

Where a similar scheme has already been allowed nearby, that decision is worth putting in front of the officer at resubmission rather than waiting for the appeal. Using appeal decisions as evidence in an application often shortens the argument, although they are indicative of how inspectors have approached an issue rather than binding on anyone.

One last point. Whichever route you take, deal with every reason for refusal. A resubmission that answers two of three reasons gets refused on the third, and an appeal that argues two of three grounds is dismissed on the one you left alone.

Enter your postcode on PlanScope to see which reports a revised application on your site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

How long do I have to appeal a planning refusal?

Householder appeals must be lodged within 12 weeks of the decision notice, and most other section 78 appeals within six months. Those deadlines are not extendable in practice. A resubmission can be made at any time, so where the decision is close the appeal clock is the one that should drive the timetable.

Is there still a free repeat application?

The fees regulations have long included a concession removing the fee for a repeat application by the same applicant, on the same site, for development of the same character, within a limited period. Its scope has been amended more than once, so check the current fees regulations and confirm with the council's validation team before budgeting on it.

Can the council refuse to deal with a resubmitted application?

Yes, in defined circumstances. Section 70A of the Town and Country Planning Act 1990 allows an authority to decline to determine where a similar application was refused on appeal within the past two years, or where it has refused more than one similar application and no appeal was made. Section 70B covers overlapping applications.

Does it cost anything to lodge a planning appeal?

No. The Planning Inspectorate charges no fee for a section 78 appeal. The cost is professional time for the statement of case and any updated drawings, and representation costs at a hearing or inquiry. Costs awards are available where a party has behaved unreasonably and caused another party expense.

Can I appeal and resubmit at the same time?

Yes, and twin-tracking is common. Lodge the appeal to protect the deadline, then submit a revised application addressing the curable reasons, withdrawing the appeal if the revision is approved. Tell the case officer what you are doing, because section 70B lets the authority decline to determine an overlapping application.

Sources and further reading

appealsresubmissionplanning refusalsection 78planning feestwin tracking

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals8 min read

Refusal on fire safety information at Gateway One

A Gateway One refusal is usually about what is missing from the drawings rather than anything wrong with the building, which makes it a drafting failure with a determination period attached.

Read article →
Refusals and Appeals8 min read

Lapsed permissions, withdrawn appeals and the route back

There is no extension application and no revival procedure for an expired permission. What you have is a fresh application on a site with a helpful planning history.

Read article →
Refusals and Appeals8 min read

Refusal where the development plan is out of date

The out-of-date plan argument is the most powerful move on appeal and the most frequently mishandled, because appellants assert the trigger rather than proving it.

Read article →
Refusals and Appeals8 min read

Contamination refusals without intrusive investigation

A desk study that identifies a credible pollutant linkage and then stops can get an application refused outright. The gap is between what the report raised and what the application proved.

Read article →
Refusals and Appeals6 min read

HMO refused for over-concentration: testing the count

Concentration refusals turn on data the council never compiled for the purpose. How to test the count address by address and answer the supporting reasons.

Read article →
Refusals and Appeals6 min read

Front garden parking refused: hardstanding and the kerb

Two consents, two decision makers. What the permitted development condition on surfacing actually says, and why the highway authority refuses most crossings on depth.

Read article →