7 min readBy PlanScope Editorial Team

Where there is no bus service, a travel plan has to carry its mode shift through car sharing, shift patterns and home working. Here is the structure that survives monitoring.

A rural travel plan template built around bus targets is a document that fails its first monitoring review. Where a site has no service within walking distance and no realistic prospect of one, the plan has to carry its mode shift through car sharing, shift patterns and home working, and it has to say so openly. Highway officers accept that. What they do not accept is a plan that promises a 10 per cent bus mode share on a site three miles from the nearest stop, because the target is the thing they will measure you against.

The structure below is the one that survives scrutiny on a rural employment site. It assumes a workforce arriving by car, and it sets out to reduce the number of cars rather than to pretend they are not coming.

Setting a realistic baseline

The baseline is a staff postcode survey and a counted car park, and neither can be skipped.

Collect home postcodes at sector level, arrival and departure times by shift, current mode, and current car occupancy. On an existing site, count the car park on three typical days and record occupancy at the peak. On a new site, use the postcodes of the existing workforce if the operation is relocating, and be explicit where the workforce is yet to be recruited.

From the postcode data, produce a distance banding: under 2 kilometres, 2 to 5, 5 to 10, 10 to 20 and over 20. That table decides which measures can work. A workforce with a third of staff inside 5 kilometres has a cycling case. A workforce spread across 40 kilometres of countryside does not, and the plan should say that rather than including a cycle mileage target nobody will hit.

Trip rates for the transport work come from the conventional database sources and feed the Transport Assessment or the shorter statement, depending on scale. The travel plan baseline is a different exercise: it is about people, not junction capacity.

Targets that are achievable without buses

Set two or three targets, expressed as the thing you can actually count.

The single most useful target on a rural site is average car occupancy, measured as staff arriving by car divided by cars arriving. Moving from 1.05 to 1.20 removes roughly one car in eight from the network and the car park, and it is achievable with a car share scheme that is run properly. A second target on the proportion of staff working at least one day a week from home is measurable from payroll or rota data. A third on cycling is worth setting only where the distance banding supports it.

State the baseline value, the target value, the date by which it applies and the survey method for each. Then say what happens if a target is missed, because a plan with no remedial measures is a statement of intent rather than a plan.

Avoid a headline "20 per cent reduction in single occupancy vehicle trips" unless you can show the measures that deliver it. Highway authorities have seen that number in a hundred plans and will ask which measure produces which part of it.

Car sharing and how to make it work

Car sharing is the measure that carries a rural plan, and it fails for predictable reasons: people cannot find a match, and they fear being stranded when a shift changes.

  • A matching system that works on shift patterns as well as postcodes, administered by someone named in the plan
  • Priority parking bays for registered sharers, close to the entrance, enforced
  • A guaranteed ride home arrangement covering a set number of taxi journeys per person per year for genuine emergencies
  • A registration process that takes under five minutes and does not require staff to share phone numbers with strangers
  • Recruitment built into induction, so new starters are asked before their parking habit forms

The guaranteed ride home is the measure employers resist and the one that makes the scheme credible. Usage is normally low and the cost is small against the parking it avoids.

Where the operation runs fixed shifts with enough staff on each, a works minibus becomes viable, contracted rather than owned. Set the threshold in the plan: if a shift reaches a stated headcount drawn from within a defined corridor, the minibus is introduced. That converts an aspiration into a trigger.

Cycling and the safe route problem

On a rural site the cycling barrier is usually not distance. It is a national speed limit lane with no footway and a blind bend.

Be honest about it in the plan, and then do the two things within your control. Provide the on-site infrastructure to a standard that removes every other excuse: secure covered cycle parking, showers, lockers, a drying space and a pool of electric bikes for short local trips. And identify the off-site improvement that would change the picture, costed, with a plan showing it, so that the contribution can be discussed in the section 106 negotiation.

Design guidance for cycle infrastructure sets out the geometry and the separation expected on higher speed roads, and a proposed shared route that does not meet it will be challenged by the highway authority. Better to offer a short section of segregated path to a village edge than a long aspirational route on the carriageway.

Home working, shift patterns and the other levers

Three measures cost the employer nothing and are frequently omitted.

Shift start times can be moved off the network peak by 30 minutes, which helps the junction assessment as well as the plan. Compressed hours, such as four longer days, remove a fifth of commuting trips for the staff who take it up. And a formal home working policy for administrative roles, stated as days per week rather than as an aspiration, produces a number you can monitor.

Electric vehicle charging is not mode shift and should not be presented as it. It belongs in the energy and sustainability section of the application rather than in the travel plan targets, although its presence in the car park is worth noting.

Deliveries and business travel deserve a short section: consolidated deliveries, a pool car for site visits, and a rule that mileage claims are only paid where public transport is not viable.

Monitoring, reporting and review triggers

Element Convention
Baseline survey Before occupation, or within three months of it
Monitoring surveys Year 1, 3 and 5 after occupation
Survey method Staff travel survey with a stated minimum response rate, plus a car park count
Report recipient The local highway authority, by a stated date
Review trigger A target missed by a stated margin, or a change in occupier or headcount
Remedial measures A named list the plan commits to, with a timescale

Name a travel plan coordinator by role, not by person, with time allocated and a budget. A plan with no owner produces no surveys, and the first the authority hears of it is when a monitoring report is late.

Securing it without setting up to fail

Travel plans are usually secured by condition, by section 106 obligation, or by both. The mechanism matters because the consequence of failure differs.

A condition requiring a travel plan to be submitted and approved before occupation, and then implemented, is the normal approach on a smaller site. On a larger scheme the authority may seek an obligation with monitoring fees and sometimes a bond or a contribution payable if targets are missed. Resist a bond tied to a target you cannot control, such as absolute mode share, and offer instead a commitment to deliver named measures and to fund an agreed remedial package if the monitoring shows the targets are not being met.

The distinction is the difference between being accountable for your own actions and being accountable for the travel choices of 80 people over five years.

Illustrative example: a food processing site for 90 staff on three shifts, 4 kilometres from the nearest village and with no bus. The baseline shows car occupancy of 1.06 and 28 staff living within 5 kilometres. The plan targets occupancy of 1.20 by year three, commits to 12 priority sharer bays, six guaranteed ride home journeys per person per year, secure cycle parking for 20 bikes with showers, and a minibus trigger at 25 staff per shift from the two largest postcode corridors. Figures are illustrative.

PlanScope drafts a Travel Plan and the supporting Planning Statement from your site and staffing details, and flags the survey data it does not have rather than inventing numbers. Councils usually expect a suitably qualified transport planner to author or review the transport evidence. Browse all 66 PlanScope report types to see what a rural employment application needs.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What targets should a rural travel plan set?

Average car occupancy is the most useful, measured as staff arriving by car divided by cars arriving, because it is countable and responds to a well run car share scheme. Add a home working target expressed in days per week, and a cycling target only where the staff postcode banding shows enough people living within a few kilometres.

Will a highway authority accept a plan with no bus measures?

Generally yes, provided the plan says plainly that no service is available and shows which measures carry the mode shift instead. What officers reject is a target nobody can hit, such as a bus mode share on a site three miles from the nearest stop, because the target becomes the benchmark at the first monitoring review.

Why does a guaranteed ride home matter?

Fear of being stranded when a shift changes is one of the two reasons car share schemes fail, the other being poor matching. Funding a set number of taxi journeys per registered sharer each year removes that fear at low cost, because take-up is normally small. It is the measure that makes the scheme credible to staff.

Should electric vehicle charging count as a travel plan measure?

Not as mode shift. Charging points change the fuel, not the number of vehicles arriving, so they belong in the energy and sustainability part of the application rather than in travel plan targets. Noting their provision in the car park is reasonable, but do not present them as delivering a reduction in trips.

How is a travel plan secured?

Usually by a condition requiring submission, approval and implementation before occupation, and on larger schemes by a section 106 obligation with monitoring fees and sometimes a contribution if targets are missed. Resist a bond tied to absolute mode share, and commit instead to named measures and an agreed remedial package.

Sources and further reading

travel planruraltransportcar sharingsection 106

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →