Screening opinion or a Secretary of State direction

6 min readBy PlanScope Editorial Team

On a borderline Schedule 2 scheme, the difference between a local screening opinion and a Secretary of State direction can decide whether you spend six months on an Environmental Statement.

A screening opinion comes from the local planning authority. A screening direction comes from the Secretary of State and binds the authority. On a borderline Schedule 2 scheme the choice between screening opinion or screening direction decides whether you spend the next six months preparing an Environmental Statement, so it is worth understanding both routes before you send the first request.

Both sit in the Town and Country Planning (Environmental Impact Assessment) Regulations 2017. Schedule 1 development requires environmental impact assessment automatically. Schedule 2 development requires it only where it would have likely effects on the environment that are, in the language of the Regulations, significant, judged against the selection criteria in Schedule 3.

What a local screening opinion decides

A prospective applicant asks the authority for a screening opinion before submitting an application, providing a plan identifying the land, a description of the development and its possible effects, and any information on how adverse effects would be avoided or reduced.

The authority has three weeks to adopt an opinion, extendable by agreement in writing. The opinion has to be reasoned, which means it must engage with the Schedule 3 criteria: the characteristics of the development, its location, and the type and characteristics of the potential impact. A one-line conclusion with no reasoning is challengeable.

An opinion that the proposal is not Environmental Impact Assessment development lets you submit an ordinary application. An opinion that it is means an Environmental Statement prepared by competent experts, a 16-week determination period and a different order of cost.

Both outcomes carry risk. A negative opinion can be challenged by a third party. A positive one can be challenged by you.

When a direction can be sought

The Regulations allow a request to the Secretary of State for a screening direction in defined circumstances: where the authority has failed to adopt an opinion within the period, and where the authority has adopted an opinion that the development is environmental impact assessment development. The Secretary of State can also make a direction without a request.

A direction binds the authority. That is the whole point of it: you are not appealing the opinion so much as replacing it with a decision from a different decision-maker.

The Secretary of State is expected to make the direction within three weeks of receiving the request, or a longer period where that is reasonable. In practice complex requests take longer, and there is no appeal against the direction itself.

Grounds worth running

A direction request is not a second bite at the same argument. It works where you can show that the authority's reasoning misapplied the Regulations, and the recognisable grounds are these.

  • The authority treated a Schedule 2 threshold as though exceeding it required assessment automatically, rather than as a trigger for screening.
  • The reasoning did not engage with the Schedule 3 criteria, or engaged with only one of them.
  • The authority took account of effects that mitigation built into the scheme would avoid, without addressing that mitigation.
  • The authority relied on cumulative effects from schemes that are speculative rather than committed.
  • The opinion gave no reasons capable of being understood.

Weak grounds are disagreement about planning judgement, and the argument that the cost of an Environmental Statement is disproportionate. Neither is a basis for a direction.

Timescales and the effect on programme

Step Indicative period
Request for a screening opinion Authority has three weeks, extendable by written agreement
Request for a screening direction Secretary of State expected to respond within three weeks
Preparing an Environmental Statement after a positive screening Months, driven by seasonal survey windows
Determination of an application for environmental impact assessment development 16 weeks
Judicial review of a screening decision Shortened six week limit for planning claims

The programme point that matters more than any of these is the survey calendar. A positive screening in October means ecology fieldwork cannot start properly until the spring, whatever the Environmental Statement timetable says. That is the real cost of a screening dispute, and it is why an early request beats a late one.

Judicial review exposure

Screening decisions are reviewable, and they are reviewed. The risk sits in both directions.

If you obtain a negative screening opinion or direction and proceed, an objector may challenge it, and a successful challenge after permission is granted can quash the permission. The exposure is greatest where the opinion was thin, so a reasoned negative opinion that engages with Schedule 3 properly is protection for the applicant as much as for the authority.

If you are refused and choose not to challenge, the alternative is to prepare the Environmental Statement. That is often the commercially sensible answer even when the screening decision looks wrong, because a quashed permission two years into a scheme costs more than an Environmental Statement.

Where you do challenge, the shortened time limit for planning judicial review means the decision has to be made quickly. Get advice in the first fortnight.

Strategy on a borderline scheme

What works, in rough order.

  1. Screen early, before the design is fixed, so that mitigation can be built in and described in the request.
  2. Write the request as though it were the reasoning: set out the Schedule 3 criteria and address each one. Authorities under pressure adopt the applicant's reasoning when it is good.
  3. Describe embedded mitigation clearly, and distinguish it from mitigation you are offering to secure by condition.
  4. Where the authority indicates a positive opinion is coming, ask what would change its view before it is adopted.
  5. If the opinion comes back positive and the reasoning is defective, weigh a direction request against the programme. Three weeks costs little. A quashed permission costs a great deal.
  6. Consider a voluntary Environmental Statement where the scheme is borderline on its facts, the site is sensitive, and the assessment work would be done anyway.

That last option is unfashionable and it deserves more attention than it gets. Nobody enjoys volunteering for a longer determination period. Much of what an Environmental Statement contains, ecology, noise, air quality, transport, heritage and landscape, will be commissioned for a major application in any event. The incremental cost is the coordination, the non-technical summary and the formal structure. A Preliminary Ecological Appraisal and the other baseline studies do the heavy lifting either way.

And an Environmental Statement removes the challenge route entirely, which on a contested site is worth something.

One further point on sequencing. A screening request describes the development, so the description has to be wide enough to cover what you will eventually apply for. Screen a scheme of 80 dwellings and then apply for 120 and the screening no longer covers the application, which hands an objector an obvious argument. Where the quantum is uncertain, screen the upper end of the range and say so in the request.

The same applies to the red line. Adding land for an access or a drainage outfall after screening changes the location characteristics the authority assessed, and a location in or near a sensitive area is one of the Schedule 3 matters. Fix the red line before screening if you can, and re-screen if it moves materially.

Browse the full report index to see what an environmental impact assessment scheme would draw in, or read biodiversity net gain against ecological impact assessment for a related comparison. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance rather than legal advice, so check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

How long does a council have to adopt a screening opinion?

Three weeks from receiving a request that contains the required information, extendable by written agreement. The opinion must be reasoned and must engage with the Schedule 3 selection criteria covering the characteristics of the development, its location and the type of potential impact. A conclusion given without reasons is open to challenge.

When can I ask the Secretary of State for a screening direction?

The Regulations allow a request where the authority has failed to adopt an opinion within the period, and where it has adopted an opinion that the proposal is environmental impact assessment development. The Secretary of State can also issue a direction without being asked. A direction binds the authority and there is no appeal against it.

What grounds actually work in a direction request?

That the authority treated a Schedule 2 threshold as automatically requiring assessment, failed to engage with the Schedule 3 criteria, ignored mitigation embedded in the scheme, relied on speculative rather than committed cumulative development, or gave reasons that cannot be understood. Disagreement about planning judgement and the cost of assessment are not grounds.

Can a third party challenge a negative screening opinion?

Yes, by judicial review, and a successful challenge after permission is granted can quash the permission. That is why a thinly reasoned negative opinion is a risk to the applicant as much as to the authority. An opinion that works through the Schedule 3 criteria properly is the applicant's protection.

Is it ever sensible to prepare an Environmental Statement voluntarily?

On a borderline major scheme on a sensitive site, often yes. Most of the underlying work, ecology, noise, air quality, transport, heritage and landscape, will be commissioned anyway, so the incremental cost is coordination, the non-technical summary and the formal structure. It also closes off the screening challenge route entirely, which matters on a contested site.

Sources and further reading

eiascreeningenvironmental impact assessmentjudicial reviewmajor development

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons6 min read

Ownership certificate A or B on a planning application

Owner means the freeholder and any lessee with at least seven years left to run. A monthly tenant is not an owner. A tenant with twelve years remaining is.

Read article →
Comparisons7 min read

Foul Sewage Assessment or Utilities Assessment

Foul drainage is a question on the application form, so a weak answer delays validation. Utilities capacity bites later, when the network operator quotes for a reinforcement nobody budgeted for.

Read article →
Comparisons8 min read

Land contamination Phase 1 or Phase 2 investigation

The difference is not depth of detail. It is whether anyone put a hole in the ground, and the two reports answer different questions at different points.

Read article →
Comparisons7 min read

Prior notification or prior approval: the difference

A Part 6 agricultural notification runs on 28 days and asks whether the council wants a say. Prior approval applications run on 56 days and carry a deemed grant.

Read article →
Comparisons7 min read

Local plan representation or a planning application objection

A plan representation can remove an allocation or rewrite a policy. An objection can refuse or condition a scheme. Once a site is allocated, arguing the principle is wasted effort.

Read article →
Comparisons7 min read

Hazardous substances consent or planning permission

A site handling a notifiable substance usually needs both consents. They are granted under different legislation, and a change in control of part of the land can revoke the hazardous substances consent.

Read article →