Residential Scale Thresholds

Why screening thresholds fall away in a sensitive area

7 min readBy PlanScope Editorial Team

Regulation 2(1) makes the sensitive area route an alternative to the thresholds, so four houses can need screening while eight in a conservation area do not.

In a sensitive area the Schedule 2 thresholds stop doing any work. The definition of Schedule 2 development in regulation 2(1) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 is development of a description in column 1 of the table where either any part of it is to be carried out in a sensitive area, or an applicable threshold or criterion in column 2 is met or exceeded.

Those two routes are alternatives, which is the whole mechanism. Cross a threshold and you are in Schedule 2. Sit in a sensitive area and you are in Schedule 2 whatever the numbers say, because the eia sensitive area threshold is not a threshold at all.

What the regulations mean by a sensitive area

The term is defined, and the definition is narrower than the everyday meaning of the words. Regulation 2(1) lists the categories, which include land notified as a site of special scientific interest under section 28 of the Wildlife and Countryside Act 1981, National Parks, the Broads, World Heritage Sites, scheduled monuments, areas of outstanding natural beauty, now known as National Landscapes, and European sites designated for habitats and species.

Read the current consolidated regulation rather than a summary of it, including this one. The list has a precise statutory form and the consequence of getting it wrong runs in both directions, so check each designation against the wording before you either rely on a threshold or abandon it.

A second point about the drafting. The test refers to the description in column 1, so a development still has to be of a listed description to be caught. The categories relevant to most development are urban development projects, which include housing and most mixed schemes, infrastructure projects, and the various industrial and extractive descriptions. A proposal that falls outside every column 1 description is outside Schedule 2 wherever it is.

Designations that are not sensitive areas

This is where most of the mistakes happen, and they go the cautious way. Several designations that dominate planning practice do not appear in the definition.

Designation Sensitive area for the 2017 Regulations?
Site of special scientific interest Yes
National Park, the Broads Yes
World Heritage Site Yes
Scheduled monument Yes
National Landscape, formerly an AONB Yes
Conservation area No
Listed building, including grade I No
Green Belt No
Tree preservation order, local wildlife site No
Flood Zone 2 or 3 No

So a scheme of eight houses in the middle of a large town conservation area does not become Schedule 2 development by virtue of the conservation area. It may well need a heritage assessment, an archaeological desk study and an ecological appraisal. It does not need a screening opinion unless it crosses a threshold.

And the reverse trap is worse. A scheme of four houses on a paddock that clips the edge of a notified site of special scientific interest is Schedule 2 development, needs screening, and cannot lawfully be granted permission until screening has happened. Four houses. The threshold is irrelevant.

Any part of the development, including the access

The phrase "any part of that development" does a great deal of work. It catches sites that straddle a designation boundary, and it catches development outside the designation whose access, drainage outfall, visibility splay works or construction compound fall inside it.

Draw the red line and then overlay the designations, rather than the other way round. A housing scheme on unconstrained land that proposes a new access across a verge within a National Park boundary has part of the development in a sensitive area, and the screening obligation follows.

Watch three details. Scheduled monuments are often small, irregular and unmarked on the ground, so the official spatial data rather than the site visit decides the answer. National Landscape and National Park boundaries frequently follow historic parish lines rather than physical features. And European site boundaries can sit offshore or along a river, catching outfalls and crossings.

What the screening request has to carry

Being in a sensitive area changes the content of the request as well as the need for one. The Schedule 3 selection criteria already require the environmental sensitivity of the location to be considered, covering the abundance, quality and regenerative capacity of natural resources in the area and the absorption capacity of the natural environment.

Four things to put in a request for a scheme in or adjoining a designation.

  1. The designation identified precisely, with the citation or list entry reference and the distance from the development.
  2. The interest features of that designation, taken from the citation rather than described generically, because an SSSI notified for its invertebrate assemblage raises different questions from one notified for its geology.
  3. The pathway by which an effect could occur, or the reasoned absence of one. Hydrological connection, dust, lighting, recreational pressure, nitrogen deposition or direct land take.
  4. Any mitigation relied on, with the mechanism by which it will be secured, because mitigation that is not certain cannot be weighed.

A Preliminary Ecological Appraisal often produces most of this material, and where a scheduled monument is involved an Archaeological Desk-Based Assessment does the same job for the heritage interest.

Where a negative opinion remains available

Being Schedule 2 development is not the same as being EIA development, and the sensitive area route does not change that. The authority still asks whether the development is likely to have significant effects on the environment by virtue of factors such as its nature, size or location, and it can conclude that it is not.

Small schemes in designated areas are screened out regularly, and properly so. A single dwelling on a serviced plot inside a National Park, replacing an existing building, with no hydrological connection to anything and no land take from a habitat, is unlikely to generate effects of that order. What matters is that the authority reaches and records that conclusion with reasons, rather than nobody asking the question.

The distinction between a householder proposal and development of a new dwelling matters here too, and the householder or minor single dwelling line is the same boundary that decides several other requirements.

What happens if screening is skipped

A planning permission granted for Schedule 2 development without screening is defective, and the defect is in the authority's decision rather than in the application. That sounds like somebody else's problem until you are the developer holding the permission.

Two exposures. Judicial review, where a claim concerning a decision under the planning Acts generally has to be brought within six weeks, with the risk that the permission is quashed. And the discovery problem, where a purchaser's or funder's solicitor spots the absence of a screening opinion during due diligence and the transaction stops until it is resolved, which on an implemented permission may not be possible.

Both are avoidable with a request that costs a fraction of either. An Environmental Impact Assessment must be prepared by competent experts where one is required, and the screening request itself is a planning document rather than a technical one.

Checking designations before relying on a threshold

Do this before the fee quote, not after the layout.

Take the red line, including access and off-site works, into the public designation datasets. The Defra multi-agency geographic information service covers statutory nature conservation designations and National Landscapes. The planning data service carries boundary datasets for a growing list of designations. The National Heritage List for England gives scheduled monument entries with their mapped extents. Then record the search, with the dataset name and the date, in the screening request.

Illustrative example: fourteen dwellings on a 0.9 hectare paddock, with an existing field access to be widened across a verge that lies inside a National Landscape boundary. Unit count below the Schedule 2 indicator, site area below five hectares, and nonetheless Schedule 2 development because part of the works sits in a sensitive area. The right move is a screening request with the National Landscape purposes addressed, a landscape note, and a reasoned case that no effect of that order arises.

Browse the 66 report types to see which environmental documents a constrained site needs. This is general guidance, not legal advice, so check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required.

Frequently asked questions

What is a sensitive area under the EIA Regulations?

A defined list in regulation 2(1) of the 2017 Regulations, including sites of special scientific interest notified under section 28 of the Wildlife and Countryside Act 1981, National Parks, the Broads, World Heritage Sites, scheduled monuments, National Landscapes formerly known as areas of outstanding natural beauty, and European sites. Read the current consolidated regulation rather than a summary.

Is a conservation area a sensitive area for screening purposes?

No. Conservation areas, listed buildings, Green Belt, tree preservation orders, local wildlife sites and flood zones are all absent from the definition. A scheme in a conservation area may need heritage, archaeology and ecology work, but it does not need a screening opinion unless it crosses a Schedule 2 threshold.

Does a small scheme in a National Park need screening?

If it is of a description in column 1 of the Schedule 2 table, yes. The thresholds do not apply where any part of the development is in a sensitive area, so a handful of houses can require a screening opinion. Screening may still conclude that significant effects are unlikely, which is the common outcome for small proposals.

What does any part of that development cover?

More than the built area. It catches sites straddling a designation boundary and development outside a designation whose access works, drainage outfall, visibility splay works or construction compound fall inside it. Draw the red line including off-site works, then overlay the designation datasets.

What should a screening request say about a designation?

Identify the designation with its citation or list entry reference and the distance from the development, set out the interest features from the citation rather than generically, explain the pathway by which an effect could occur or why there is none, and state any mitigation relied on with the mechanism securing it.

What is the risk of skipping screening?

A permission granted for Schedule 2 development without screening is defective. It can be challenged by judicial review, which for a decision under the planning Acts generally has to be brought within six weeks, and the absence of a screening opinion is routinely picked up in due diligence on a sale or funding.

Sources and further reading

eia screeningsensitive areaschedule 2designationssssinational landscape

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Residential Scale Thresholds

View all →
Residential Scale Thresholds7 min read

Levy liability at 100 square metres or one home

The Community Infrastructure Levy minor development exemption applies below 100 m2 of new floorspace, but never where the development creates a dwelling of any size.

Read article →
Residential Scale Thresholds7 min read

The retail impact assessment threshold of 2,500 m2

The default national threshold for a retail impact assessment is 2,500 m2 of floorspace where a local plan sets no figure. The sequential test has no threshold at all and applies at any scale.

Read article →
Residential Scale Thresholds7 min read

Affordable housing at ten units and the rural option

Affordable housing contributions are not sought below major development, meaning 10 dwellings or 0.5 hectares. In designated rural areas under the Housing Act 1985 a plan may set a threshold of five units or fewer.

Read article →
Residential Scale Thresholds8 min read

One hundred and fifty units and Active Travel England

The residential trigger is 150 units, with further triggers at 7,500 square metres of floorspace and 5 hectares of site area. Here is what the consultee looks at and what answers it.

Read article →
Residential Scale Thresholds8 min read

Eighteen metres and seven storeys, measured properly

Height runs from the lowest adjacent ground to the floor surface of the top storey, not to the parapet. Here is how the storey count, plant exclusions and mezzanine rule actually work.

Read article →
Residential Scale Thresholds7 min read

EIA screening at 150 dwellings and five hectares

The housing screening trigger is more than 150 dwellings, and the five hectare overall area limb catches far more schemes. Here is how screening actually works.

Read article →