Commercial Occupiers

A seasonal food kiosk on private land: the planning rules

6 min readBy PlanScope Editorial Team

Part 4 of the GPDO allows temporary use of land for 28 days a year, including a moveable kiosk. The curtilage exclusion, the day count across the planning unit and any hardstanding or services decide whether you need to apply.

A seasonal food kiosk on private land can often operate without planning permission for up to 28 days in a calendar year, under the temporary use right in Part 4 of the General Permitted Development Order. Beyond that, or where the land is within the curtilage of a building, you need an application. The trap that catches most operators is the curtilage exclusion, because a car park attached to a pub, a shop or a visitor centre is usually within the curtilage of that building, and the 28 day right does not apply there at all.

Read the restriction before you count the days.

Whether a kiosk is development at all

Two separate questions, and both can bite.

First, is the structure a building. A unit that is craned onto a concrete base, connected to services and left in place is operational development. A trailer towed on in the morning and away at night is a chattel rather than a building, and placing it is not operational development. Between those extremes the courts look at size, degree of permanence and physical attachment to the ground, so a timber kiosk bolted to a slab for a whole summer is closer to a building than its owner would like.

Second, is there a material change of use of the land. Selling hot food from a car park changes what the land is used for, even if the structure itself is a chattel. That change can be material depending on its scale, frequency and effect, and intensity matters more than the physical works.

So a mobile catering trailer is not automatically outside the planning system. It escapes the first question and still has to answer the second.

The temporary use allowance and its limits

Part 4 of the General Permitted Development Order permits the use of land for any purpose for not more than 28 days in total in any calendar year, together with the provision on the land of any moveable structure for the purposes of that use. A lower sub-limit applies to certain uses, including markets, and the Part has been amended more than once, so check the current text rather than a summary.

Three limits decide most cases:

  1. The right does not permit the use of a building, or of land within the curtilage of a building. A kiosk in a pub car park, a farm shop yard or a leisure centre forecourt is usually out.
  2. The 28 days are counted across the whole planning unit and across all temporary uses in that calendar year. A field that hosts a car boot sale for six days has 22 left for anything else.
  3. The structure must be moveable and provided for the permitted use, and it must come off the land when the use ends.

A fourth point is easy to miss. The right permits the provision of a moveable structure for the purposes of the permitted use, so the structure has to serve the 28 day use rather than sit on the land all year waiting for it. A kiosk left in place through the winter, shuttered, is on the land outside the permitted use.

Keep a dated log of trading days from the first season onwards. When an enforcement officer asks, a contemporaneous log is worth more than anyone's recollection, and the burden of showing the right applies sits with you.

Siting, servicing and power

Even inside the 28 day allowance, several things can take you outside it.

Laying hardstanding is engineering operations and is development in its own right. Connecting to mains water or electricity involves works. A generator is plant and, if it runs for long periods near housing, it is a noise source that invites complaints, and complaints invite scrutiny of the days count.

Waste storage is worth planning for rather than improvising. A trade waste contract, a bin store that is not visible from the road and a grease trap where frying takes place all look like detail, and all three come up in objections.

Food business registration with the council is a separate legal requirement under food law, free and normally required at least 28 days before trading. Potable water supply, handwashing and waste water storage all have to satisfy the food safety officer regardless of the planning position.

Where the kiosk sits on a highway rather than on private land, street trading consent under local government legislation applies instead, and some authorities designate areas where consent is needed. Confirm the boundary of the public highway before assuming the land is private.

Odour and litter

Hot food is where the complaints come from, and both of the usual ones have practical answers.

Odour depends on the cooking process and the discharge point. Frying generates the problem, a short flue at head height in a courtyard makes it worse, and a terminated flue above the eaves of nearby buildings with appropriate filtration usually solves it. Where a permanent arrangement is proposed, a Ventilation and Extraction Statement sets out the system, and on a sensitive site an Odour Assessment quantifies it.

Litter is a planning issue and an environmental one. Provide bins in proportion to the trade, commit to a litter sweep of a defined radius at agreed intervals, and put that commitment in writing with the application. Local authorities have powers under environmental protection legislation to require occupiers of premises, including food outlets, to clear litter in the vicinity, so volunteering the arrangement is better than having it imposed.

Highway access and visibility

A kiosk that draws passing trade changes how vehicles behave on the road outside it, and that is often the real objection.

Three things to show: that vehicles can enter and leave in forward gear, that visibility splays at the access meet the standard for the recorded speed of traffic, and that no queueing will take place on the carriageway. A layby location raises the last point sharply, and the highway authority will say so.

Parking for customers and for staff needs to be identified on a plan even for a temporary operation. Where the highway authority is uneasy, a short Transport Statement covering trip generation, parking and access geometry answers more quickly than correspondence does.

When a full application is needed

Apply where any of the following is true:

The operation will run for more than 28 days in a calendar year, or more than the sub-limit where one applies. The land is within the curtilage of a building. The structure is permanent enough to be a building. Hardstanding, services or a permanent flue are proposed. Signage needs advertisement consent, which is a separate application in its own right.

A seasonal permission is the usual outcome, granted under the power to impose a time limit, with conditions tying operation to stated months and years, requiring removal of the structure outside the season, setting opening hours, and dealing with litter and waste collection. Ask for a longer period than one season, because renewing annually costs more than the extra scrutiny of a three year permission.

Hot food sold for consumption off the premises is a sui generis use rather than part of Class E, which matters if the operation becomes permanent, and the note on cold food takeaway planning and Class E sets out the line between the two. Where you do apply, the case belongs in a short Planning Statement rather than a covering email.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I run a food kiosk for 28 days without permission?

Often yes. Part 4 of the General Permitted Development Order permits use of land for any purpose for up to 28 days in a calendar year, with a moveable structure for that use. A lower sub-limit applies to some uses and the Part has been amended, so check the current text before relying on it.

Does the 28 day right apply in a pub or shop car park?

Usually not. The right does not permit the use of a building or of land within the curtilage of a building, and a car park attached to a pub, farm shop or visitor centre is normally within that curtilage. This is the most common reason an operator who thought they were covered receives an enforcement letter.

Is a mobile catering trailer development?

The trailer itself is usually a chattel rather than a building, so placing it is not operational development. But using the land to sell food can still be a material change of use depending on scale, frequency and effect. Escaping the first question does not answer the second.

How are the 28 days counted?

Across the whole planning unit and across all temporary uses in the same calendar year. A field that hosts a car boot sale for six days has 22 days left for anything else. Keep a dated log of trading days from the first season, because the burden of showing the right applies sits with you.

What conditions come with a seasonal permission?

Typically a time limit tying operation to stated months and years, removal of the structure outside the season, opening hours, litter collection arrangements and waste storage. Ask for a three year period rather than a single season, since annual renewals cost more than the extra scrutiny of a longer permission.

Sources and further reading

temporary usefood kioskpermitted developmentchange of usecommercial

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Commercial Occupiers

View all →
Commercial Occupiers7 min read

Dessert shop planning permission and the waste stream

A cold dessert or bubble tea shop is within Class E, so moving into a former shop needs no permission. Hot food, hours, queueing and waste are the real issues.

Read article →
Commercial Occupiers7 min read

Church hall letting space to a commercial nursery

Whether a commercial nursery in a church hall needs permission turns on the planning unit. Exclusive occupation, physical alteration and intensity are what decide it.

Read article →
Commercial Occupiers7 min read

A microbrewery's effluent and the undertaker's consent

Brewing effluent is far stronger than domestic sewage. The sewerage undertaker, not the council, decides whether it can go down the drain, and on what terms.

Read article →
Commercial Occupiers6 min read

A pet crematorium and the environmental permit

Animal cremation sits outside the use classes, needs an environmental permit as well as planning permission, and is normally decided on stack height, odour and the visitor element.

Read article →
Commercial Occupiers6 min read

Reopening a nightclub after years of closure

A sui generis nightclub use does not lapse through non-use alone, but it can be abandoned. Physical condition, length of closure, intervening use and the owner's intentions decide it, and a certificate of lawfulness settles it.

Read article →
Commercial Occupiers6 min read

Betting shops, sui generis use and the change of use case

Betting offices left Class A2 in 2015 and never joined Class E, so a full application is always needed. Frontage clustering policy, shopfront design and the gambling premises licence decide the outcome.

Read article →