Planning Process

Section 70C and declining to determine a retrospective bid

7 min readBy PlanScope Editorial Team

Section 70C of the Town and Country Planning Act 1990 allows a council to decline to determine an application for development already covered by an enforcement notice. There is no appeal against that choice.

Section 70C of the Town and Country Planning Act 1990 lets a local planning authority refuse to entertain a planning application at all, without ever reaching the merits, where granting permission would authorise something already covered by an enforcement notice. It is not a refusal. The application is simply not determined, no decision notice issues, and there is no right of appeal to the Planning Inspectorate against the authority's choice. For anyone who has built first and applied afterwards, section 70C planning practice is the single provision most likely to close the door.

The power arrived through the Localism Act 2011, which was aimed squarely at applicants who ran an application and an enforcement appeal in parallel to buy time. Understanding how narrow the remaining routes are matters before the first spade goes in the ground, not after the notice lands.

What the power allows

An authority may decline to determine an application where the application is for planning permission for the whole or part of any matters specified in a pre-existing enforcement notice as constituting a breach of planning control.

Three features do most of the work. The power is discretionary, so an authority may use it or not, and some do not use it at all on minor householder breaches. It bites on matters specified in the notice, which means the drafting of the notice controls the scope of the power. And it can be applied to part of an application, so a scheme that mixes enforced-against development with new work can be split, with the authority declining the enforced-against element.

The trigger is the existence of the notice, not its outcome. A notice under appeal is still a notice for these purposes.

When the power bites

Sequence is everything. The notice must have been issued before the application is made. An application submitted while the authority is still investigating, before any notice is served, cannot be met with section 70C.

That is why the first response to an enforcement investigation is usually to get a properly prepared application in early. If you have received a planning contravention notice, the authority is gathering information and has not yet decided to serve. The window is open, and it can close quickly.

Two further points catch people out. A withdrawn notice removes the basis for declining, so authorities sometimes withdraw and re-serve to fix a drafting error, which resets the sequence. And where a notice has been quashed on appeal, it no longer exists, so a fresh application is not vulnerable.

How it interacts with an enforcement notice appeal

An appeal against an enforcement notice runs on statutory grounds lettered (a) to (g). Ground (a) is the planning merits argument: that permission ought to be granted for what has been built. The other grounds cover matters such as the breach not having occurred, the time limits having expired, and the steps required being excessive.

Ground (a) is the route that overlaps with an ordinary application. When an appellant pursues it, a deemed application for planning permission arises and a fee is payable, currently at twice the rate for an equivalent application. The inspector then decides the planning merits within the enforcement appeal rather than in a separate process.

So where section 70C has been used, ground (a) is usually the only surviving way to argue that the development is acceptable. Losing access to it is the real damage.

Why the ground (a) route was narrowed

Section 174(2A) of the 1990 Act removes ground (a) where an application for planning permission for the matters stated in the notice was made before the notice was issued, and that application had not been decided or had been withdrawn when the notice was served.

Read those two provisions together and the trap becomes obvious. Apply before the notice, and you may lose ground (a) at the enforcement appeal. Apply after the notice, and the authority may decline to determine under section 70C. Applicants who submit an application, wait, and then find a notice served during the determination period can end up with neither route available.

The practical answer is to force the application to a decision. A refusal gives a section 78 appeal. A non-determination appeal after the statutory period has expired gives the same. What you must avoid is leaving an application sitting undetermined while the enforcement team prepares a notice.

What is left when the authority declines

A decision to decline under section 70C carries no appeal right. The only challenge is judicial review in the Administrative Court, on the usual public law grounds, within six weeks for planning matters. That is a high bar and an expensive one, and it tests the lawfulness of the authority's approach rather than the planning merits.

More productive options usually sit elsewhere:

  1. Argue that the application is materially different from the matters in the notice. A properly redesigned scheme, with reduced scale, different siting or a different use, may fall outside the notice.
  2. Ask the authority to withdraw the notice as part of a negotiated solution, which it may do where a revised scheme resolves the harm.
  3. Pursue ground (a) if it survives, and put the full policy case into the enforcement appeal.
  4. Test immunity. If the breach is time-expired, a certificate of lawfulness under section 191 confirms it, and the authority cannot lawfully enforce.
  5. Comply with the notice and then apply for something acceptable on a clean site.

Option one is where most successful outcomes sit, and it depends on how tightly the notice was drafted.

Advising a client who has already built

Start by reading the notice, not the site. Identify the matters specified, the steps required, the compliance period and the date of issue. Those four things determine every option that follows.

Then check the time limits. The Levelling-up and Regeneration Act 2023 replaced the four year rule for operational development and changes of use to a single dwellinghouse with a ten year period in England for breaches occurring after the relevant provisions came into force. Older breaches may still be governed by the four year rule, so check the commencement provisions against the date the breach began before advising anyone that they are immune.

Be blunt with clients about cost. An enforcement appeal with a ground (a) case needs the same evidence base as a full application, because the inspector is deciding the planning merits. That means a Planning Statement setting out the policy case, and usually the technical work that would have accompanied the original application, prepared after the event and often harder to produce because the building is already there. Some evidence becomes impossible: a pre-development ecology baseline cannot be recreated once a barn has been stripped.

Evidence worth gathering in the first week

Photographs with dates, invoices, delivery notes, bank statements, council tax and utility records, sworn statements from contractors and neighbours. All of it goes to when the breach began and what was built, which drives the immunity question and the accuracy of the notice.

Collect the planning history too. Old permissions, certificates, and any correspondence in which an officer expressed a view. Authorities are not bound by informal views, but a documented exchange can shape how a notice is drafted and whether it is withdrawn.

And check what the notice omitted. Enforcement notices are drafted quickly under time pressure, and a notice that describes the breach imprecisely leaves room for a revised scheme that sits outside it. That is the gap worth working in.

Once the strategy is settled, the technical documents still have to be produced. You can see which reports a scheme of this kind usually needs and draft the policy case first, then commission the specialist work the notice has made unavoidable.

This is general guidance, not legal advice. Enforcement is fact-specific and the consequences of getting the sequence wrong are severe, so take advice from a qualified planning professional or solicitor before acting. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Can I appeal a decision to decline to determine under section 70C?

No. Declining to determine is not a refusal, so no section 78 appeal arises. The only route is judicial review in the Administrative Court on public law grounds, normally within six weeks. That challenges the lawfulness of the authority's approach rather than the planning merits of the scheme, and it is expensive.

Does section 70C apply if the enforcement notice is under appeal?

Yes. The power depends on the notice having been issued, not on the outcome of any appeal against it. A notice that is under appeal still exists and still supports the use of section 70C. If the notice is later quashed, it no longer exists and a fresh application is not vulnerable to the power.

What is the twin-tracking trap under section 174(2A)?

Ground (a) of an enforcement appeal is removed where an application for the same matters was made before the notice was issued and was still undetermined or had been withdrawn when the notice was served. Combined with section 70C, an applicant who leaves an application sitting while a notice is prepared can lose both routes.

Can a revised scheme get round section 70C?

Sometimes. The power applies to the matters specified in the notice. A scheme that is materially different in scale, siting or use may fall outside those matters, and the authority would then have to determine it. How much room exists depends on how tightly the notice was drafted, so read the notice wording closely first.

How long does a council have to enforce against unauthorised building work?

The Levelling-up and Regeneration Act 2023 moved England to a single ten year period for breaches occurring after the relevant provisions came into force. Breaches that began earlier may still fall under the previous four year rule for operational development. Check the commencement provisions against the date the breach began before relying on immunity.

Sources and further reading

section 70cenforcementretrospective applicationplanning appealstown and country planning act

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Process

View all →
Planning Process7 min read

Transferring a permission and a change of applicant

Section 75 makes a permission a benefit of the land, so a buyer acquires it on completion with no form or fee. The levy paperwork and undischarged conditions are where the risk sits.

Read article →
Planning Process8 min read

Decision notices: conditions, informatives and reasons

The permission is the description, the conditions and the drawings those conditions list. The officer report is not part of it, and a superseded drawing revision in the list is a real problem.

Read article →
Planning Process7 min read

Prior approval: the clock, deemed consent and the risks

Prior approval runs on a hard statutory deadline, and silence from the council can let development begin. The paper trail that silence leaves is rarely good enough for a lender.

Read article →
Planning Process7 min read

Permission time limits and what happens when one lapses

A permission that expires cannot be renewed. Keeping one alive means a material operation within the time limit, with every pre-commencement condition already discharged.

Read article →
Planning Process7 min read

Outline permission: what to fix and what to reserve

Access, appearance, landscaping, layout and scale can each be reserved, but reserving everything is rarely the least costly route. This sets out which to fix at outline and what the decision costs you later.

Read article →
Planning Process7 min read

Extensions of time and the eight week deadline

The eight week period is a deadline for the council, not a promise to you. Agreeing an extension helps the authority's performance figures and sometimes helps your application. Knowing when it does which is the useful part.

Read article →