Glossary

Severability: when part of a permission survives

6 min readBy PlanScope Editorial Team

Severability decides whether an unlawful condition can be removed without destroying the permission it sits on. The test turns on whether the condition is fundamental to what was granted.

Severability planning permission questions arise at the worst moments. A client reads a condition, decides it is unlawful, and asks whether they can simply ignore it. Or a permission is challenged and the claimant attacks one element, and everyone wants to know whether the rest survives. The two situations use the same word and apply different tests.

The short answer on conditions is that severance is possible but narrow. A condition can be struck out and the permission left standing only where the condition is not fundamental to the grant. If it is fundamental, and it is unlawful, the permission goes with it.

Severing a condition

The approach the courts take asks whether the condition goes to the heart of the permission. Conditions that are incidental, tidying up detail or controlling a peripheral matter, can be severed without disturbing what was granted. Conditions without which the authority would plainly never have granted permission cannot.

The authorities that established this are familiar to anyone who has argued the point. A condition requiring an applicant to construct a road at their own expense and give rights of passage over it was held to be so unreasonable as to be ultra vires and inseverable from the permission. A condition requiring a personal permission tied to an occupancy restriction has been treated as fundamental on similar reasoning.

There is a related trap in conditions that purport to control land outside the application site, or to require the applicant to give up rights. Those tend to fail the lawfulness test and tend also to be fundamental, which is the worst combination available.

So the analysis runs in two steps, not one. First, is the condition lawful, applying the usual tests of planning purpose, relationship to the development and reasonableness. Second, if it is not, was it fundamental. The second question is the one people skip, and it is the one that determines whether the client still has a permission.

When the whole thing falls

A permission granted subject to an unlawful fundamental condition is vulnerable in its entirety. That is an uncomfortable position for a developer who has already implemented it.

Two practical consequences follow. A claimant challenging a permission may attack a condition precisely because the condition is fundamental, in the hope of taking the permission with it. And a developer who wins an argument that a condition was unlawful may find the victory hollow, because the court removes the permission rather than the condition.

That asymmetry is why advisers steer clients towards section 73 of the Town and Country Planning Act 1990. An application to vary or remove the condition produces a new permission subject to different conditions, decided on planning merits, with an appeal if it is refused. It does not require anyone to argue that the original decision was unlawful.

The section 73 route has its own limits. It cannot be used to change the description of development, and the authority reconsiders the condition rather than rubber-stamping the change, so an unfavourable policy shift since the original grant can work against you. But it leaves the original permission intact and available while the new application is decided, which is the point.

Partial quashing on judicial review

The court's remedial powers under the Senior Courts Act 1981 are discretionary, and partial quashing is available where the unlawful element can be separated from the rest.

Public law draws the distinction between textual severance, where the offending words can be excised leaving a coherent text, and substantial severance, where what remains is still in substance the decision the decision-maker made. Both usually have to be satisfied. A permission where the unlawfulness lies in a discrete condition may survive with that condition quashed. A permission where the officer's report misdirected the committee on the policy test infects the whole decision, and nothing survives.

Heritage cases illustrate the point. Where a committee has been misdirected on the heritage balance, the error runs through the whole assessment and severing a condition achieves nothing. Where the same permission carries a separate and unrelated condition that happens to be unlawful, that condition can go on its own.

Split decisions

A different question, often confused with severability, is whether an authority can grant permission for part of an application and refuse the rest.

The authority determines the application before it. Where a proposal is divisible, and the applicant agrees, a split decision is occasionally issued, and some authorities are more willing than others. The difficulty is that the resulting decision can be hard to interpret, particularly where the plans show a single scheme and the description of development covers both elements.

The practical advice is straightforward. If you can see that one element is likely to be resisted and the other is not, submit them as two applications. A shop conversion and a rear extension can be applied for separately. A single application covering both hands the authority a choice between refusing everything and issuing something nobody can implement cleanly.

Illustrative example: an application for a change of use plus a new mezzanine and a plant enclosure. The use was acceptable, the enclosure was not. Submitted as one application, it was refused in full and the applicant lost four months. Submitted as two, the use would have been granted while the enclosure was redesigned. That example is illustrative.

What it means for implementation

Three points matter on site.

Do not proceed on the basis that a condition is void. If the view is wrong, the development is unauthorised, and enforcement follows. The appeal route that then opens, including the deemed application on a ground (a) appeal, puts the whole scheme back into the planning merits arena on the authority's timetable rather than yours.

Watch the relationship with any planning obligation. A section 106 agreement is usually drafted by reference to the permission it relates to. Quashing that permission, wholly or in part, raises questions about what the obligation now binds, and well-drafted agreements address the scenario expressly.

And keep the commencement position under review. Implementation in reliance on a permission that is under challenge is a commercial decision rather than a legal protection.

Advising a client who thinks a condition is void

Work through it in order.

  1. Read the condition against the tests for a lawful condition, and read the officer's report to see why it was imposed.
  2. Ask whether the authority would plainly have refused permission without it. That is the severability question, and it is often answered in the committee report.
  3. Consider whether a section 73 application would give the client what they want, faster and with less exposure.
  4. Consider a certificate of lawfulness where the argument is that the condition does not bite on the proposed activity at all, which is a different point from invalidity.
  5. Reserve judicial review for cases where the client accepts the risk that the whole permission may fall, and take the deadline seriously, because it is short.

Where the answer is a fresh application, the policy case has to be made from scratch, and a planning statement dealing openly with the history of the earlier condition tends to fare better than one that ignores it. You can see the supporting documents a fresh application needs before deciding which route to take.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What does severability mean in planning?

It is the question of whether an unlawful part of a decision can be removed while the rest survives. In practice it arises in two ways: whether an invalid condition can be struck out leaving the permission intact, and whether a court can quash part of a permission on judicial review while leaving the remainder standing.

Can an invalid condition simply be ignored?

No. Building in reliance on a private view that a condition is void is a serious risk, because if the view is wrong the development is unauthorised and enforcement follows. The orthodox routes are an application under section 73 to vary or remove the condition, an appeal, or a certificate of lawfulness.

What is the fundamental condition test?

The courts ask whether the condition goes to the heart of the permission. A condition that is incidental can be severed, leaving the permission standing. A condition so central that the permission would never have been granted without it cannot be severed, and if it is unlawful the whole permission falls with it.

Can a court quash part of a planning permission?

It can, where the unlawful element is separable from the rest both in the wording of the decision and in substance. The court considers whether what remains still makes sense as a decision the authority could have made. Where the unlawfulness infects the whole reasoning, the entire permission is quashed instead.

Can a council grant permission for part of an application?

The authority determines the application as submitted. Where a proposal is divisible and the applicant agrees, a split decision is occasionally issued, but practice varies between authorities and the approach carries risk. Where two elements are likely to be treated differently, submitting them as separate applications is usually the safer course.

Sources and further reading

severabilityconditionsjudicial reviewplanning permissionsection 73case law

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary7 min read

Competent person: who the law accepts for which report

Six planning report types carry a statutory competence requirement. Many more only expect a suitably qualified author. The difference changes who can sign and what happens if they cannot.

Read article →
Glossary7 min read

Betterment in highway terms: what a section 278 delivers

A section 278 agreement lets a developer pay a highway authority to improve the existing highway, but only where the authority is satisfied the public benefits. Here is how it is secured and programmed.

Read article →
Glossary6 min read

Exceedance route: where water goes when the system fills

Every drainage system has a capacity, and water above it has to go somewhere. An exceedance route is the designed overland path, and it is a levels exercise before it is a pipe exercise.

Read article →
Glossary6 min read

Receptor: who and what an assessment protects

Receptor is the third term in the source-pathway-receptor chain, and every discipline defines it slightly differently. Getting the list right is what makes the rest of an assessment defensible.

Read article →
Glossary7 min read

Reasonable worst case: what it means in assessment

An outline or parameter-based scheme still has to be assessed against something definite. Reasonable worst case is how that is done, and the parameters you fix decide whether the assessment holds.

Read article →
Glossary7 min read

Severance: when one permission cannot be built in parts

A planning permission is normally a permission for the whole development, not a set of independent parts. Here is what severance means, where the rule comes from, and how to check the position for a part-built site.

Read article →