Use Classes and Change of Use

Turning a shop into a hot food takeaway

6 min readBy PlanScope Editorial Team

Hot food takeaways left the use classes in 2020, so every change from a shop needs permission, and the application is decided on the flue route as much as on policy.

Shop to hot food takeaway planning always needs an application. Since the 2020 amendment to the Use Classes Order revoked the old A1 to A5 classes, the sale of hot food for consumption off the premises has been sui generis, sitting outside every class. A shop, a hairdresser, an office or a cafe is within Class E. A takeaway is not. Moving from one to the other is a material change of use and there is no permitted development route.

That is the easy part. The application itself turns on extraction, odour, noise and litter, and those are won or lost on drawings rather than on argument.

Why a takeaway sits outside Class E

The 2020 Regulations swept shops, financial and professional services, cafes and restaurants, indoor sport, medical uses, creches, offices and light industry into a single Class E, and moved hot food takeaways, drinking establishments, cinemas, live music venues and hot food delivery-only operations out into sui generis or the new F classes.

The practical effect is one-way flexibility. You can convert a takeaway into almost anything inside Class E without permission, because Class E has no restriction on what it receives. Going the other way needs consent every time.

Watch the existing lawful use rather than the last occupier. A unit that traded as a takeaway for years without permission is not lawful simply because nobody complained, unless the time limits have run and a certificate confirms it.

The line between a cafe and a takeaway

Class E(b) covers the sale of food and drink principally for consumption on the premises. Once the greater part of the trade leaves the shop in a bag, the use has moved.

There is no percentage written into the Order. The assessment is one of fact and degree, and the factors officers weigh are the number of covers, the layout, the proportion of turnover taken away, the hours, the presence of a delivery operation and the way the business advertises itself. A cafe that sells sandwiches to office workers at lunchtime is a cafe. A cafe with four stools, a hot counter and three delivery platforms on the window is a takeaway in all but name.

Growth can trigger it too. Where a lawful cafe use gradually shifts towards takings taken away, the change can amount to development through intensification of an existing use even though nothing physical altered.

Extraction, odour and the route of the flue

This is the issue that refuses applications. Frying, grilling and tandoor cooking produce odour that has to be captured, treated and discharged where it will not affect anyone.

An officer expects a Ventilation and Extraction Statement that addresses each of the following, with a drawing to match:

  1. The cooking processes proposed, by type and duty, since odour risk scales with the method.
  2. The canopy specification and extract volume.
  3. The treatment train, typically grease filtration followed by carbon or electrostatic treatment, with maintenance intervals stated.
  4. The internal route of the duct through the building, including any flats above and the fire protection of the riser.
  5. The discharge point, normally at or above ridge level, vertically upward with no cowl restricting the plume.
  6. The separation from openable windows and from any air intake serving other premises.

The commonest reason for refusal on a parade with flats above is that no lawful route exists for the flue. Owners of the upper floors are under no obligation to let a duct through their demise, and planning permission does not grant that right. Settle the route, and the consent to use it, before you apply.

Where the surrounding area is sensitive or the process is high risk, the council may want a fuller Odour Assessment prepared to recognised industry guidance rather than a statement of intent.

Noise from plant, and from the customers

The extract fan runs all evening. A Noise Impact Assessment using BS 4142:2014+A1:2019 compares the rating level of the plant with the measured background sound level at the nearest window, and the margin between them drives the officer's conclusion. Include the fan and any refrigeration and air conditioning in the same assessment, because they run together.

Customer noise is assessed differently, as an amenity matter rather than under BS 4142. Late-night arrivals, car doors, conversation outside the door and mopeds are what neighbours report. Where the unit sits under flats, expect scrutiny of closing time above everything else.

Litter, hours and delivery riders

Issue What councils ask for What usually works
Litter A management plan and on-street bin provision Staff litter picking within a stated radius, at stated intervals
Hours A condition on opening and on deliveries Offering a closing time rather than defending an open-ended one
Riders Waiting and parking arrangements A designated internal waiting area and no engine idling
Waste Storage and collection details Enclosed bin store, collections in daytime hours only

Councils have powers under the Environmental Protection Act 1990 to deal with litter around premises, so a planning application that ignores the issue invites a condition drafted by someone else. Propose the plan yourself.

Delivery-led operations deserve a separate paragraph in the planning statement. A unit taking a hundred orders an evening with riders arriving and departing continuously behaves nothing like a counter operation, and inspectors have been unsympathetic to applicants who describe it as a minor detail.

Health policies and distance from schools

Many adopted local plans now restrict new hot food takeaways within a defined walking distance of a secondary school, or where the proportion of takeaway units in a frontage already exceeds a stated figure. The exact distance, the frontage percentage and the definition of the primary shopping area vary by authority, so read the adopted policy rather than assuming a national rule.

Where such a policy applies, the application needs to address it directly. Arguments that have carried weight include closing before the school day ends, the absence of a school within the defined catchment on a measured walking route rather than as the crow flies, and evidence that the unit has been vacant and marketed.

Highway evidence and what to submit

Short-stay parking is the concern, not long-stay. Officers want to know where customers will stop, whether that is on a red route, a bus stop or a bend, and whether riders will mount the pavement. A short transport note with a survey of kerbside activity during the evening peak answers it.

The usual bundle for a change of use of this kind is a Planning Statement covering the use class position and the development plan, the extraction statement with drawings, an acoustic assessment of plant, a management plan covering litter, hours and riders, a waste strategy, and existing and proposed floor and elevation drawings showing the duct.

One honest caveat. Even a well-evidenced application can fail on a frontage where a local policy caps the number of takeaways, and no amount of technical work displaces an adopted policy. Check that first, because it decides whether the rest is worth paying for.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Enter your postcode on PlanScope to see which reports a change of use to a takeaway is likely to need.

Frequently asked questions

Can I change a shop to a takeaway without planning permission?

No. The 2020 amendment to the Use Classes Order made the sale of hot food for consumption off the premises a sui generis use outside every class, while shops sit in Class E. The change is therefore material and needs a full planning application. No permitted development right covers it.

How much takeaway trade turns a cafe into a takeaway?

There is no fixed percentage. Class E(b) covers food and drink sold principally for consumption on the premises, so once the greater part of trade leaves the unit the use has changed. Officers weigh covers, layout, hours, delivery platforms and turnover split as a matter of fact and degree.

Where does the extract flue have to discharge?

Normally at or above ridge level, discharging vertically upward without a cowl that deflects the plume, and clear of openable windows and air intakes. The internal route matters as much as the outlet. Where flats sit above, you need the owner's consent for the duct, which planning permission does not provide.

Will the council restrict my opening hours?

Very probably, particularly where there is residential accommodation above or adjoining. Proposing a closing time in the application is usually better than defending an open-ended one at committee. Conditions commonly cover opening hours, delivery and servicing hours, and the operation of the extraction system.

Do policies about takeaways near schools apply everywhere?

No. They are local policies, not national ones, and the distance, the measurement method and the frontage thresholds differ between authorities. Read the adopted local plan and any supplementary guidance before spending money on technical reports, because an adopted exclusion policy is difficult to overcome.

Sources and further reading

hot food takeawaychange of useclass eextractionodour

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →