Permitted Development

What counts as a side elevation fronting a highway

6 min readBy PlanScope Editorial Team

A highway is not only a road. A public footpath running past your gable is a highway, and that can change which permitted development rights you hold.

The phrase catches people because both halves of it are wider than they look. A highway is any way over which the public has a right of passage, so a public footpath running along your gable is a highway. And a side elevation fronting a highway does not have to adjoin it, only to face towards it and be seen from it.

Put those together and a perfectly ordinary semi-detached house with a public right of way down the side passage can lose permitted development rights that its neighbour two doors along still holds.

How wide the word highway runs

The planning legislation borrows the general meaning, and in highway law a highway is a way over which the public has a right to pass and repass. Surfacing, ownership and maintenance status are all irrelevant to that question.

So the family includes carriageways, footways alongside them, and separately recorded public footpaths, bridleways, restricted byways and byways open to all traffic. A grass track across a field with a recorded public footpath on it is a highway. A tarmac private drive with no public rights is not.

Two records answer the question. The definitive map and statement, held by the surveying authority, records public rights of way. The list of streets kept under the Highways Act 1980 records the highways maintainable at public expense. Neither is complete on its own, because a highway can exist at common law without appearing on either, but together they cover almost every domestic case.

One qualification worth holding on to. Some provisions in the Order use narrower wording, for example limiting a restriction to a highway used by vehicular traffic, which is how the height limits for gates, fences and walls in Part 2 work. So read the actual words of the class rather than assuming every reference to a highway means the same thing.

Identify the principal elevation first

Everything downstream depends on getting this right, and the government's technical guidance is clear that a dwellinghouse has one principal elevation.

The principal elevation is normally the front. The indicators are the main architectural treatment, the position of the main entrance, and the relationship to the road the property is addressed from. A rear extension is measured from the wall opposite it. Everything else is a side elevation.

Some real complications sit here. A house that was turned round in a conversion may present its architectural front to a garden and its entrance to a lane. A bungalow on a plot accessed from the rear may have its main windows facing away from the road. And a building with a symmetrical design on two frontages, a corner shop conversion for instance, can support an argument for two principal elevations, though officers resist it.

Where curtilage and principal elevation interact, the detail is worked through in curtilage, principal elevation and Class A cases.

What fronting means in practice

Fronting is a directional test, not a proximity test. A wall fronts a highway where it faces towards the highway and is visible from it.

Three consequences follow. A wall separated from the road by a verge, a service strip or a front garden still fronts it. A wall that faces the highway but is screened by another building generally does not, because the visual relationship has been broken. And a wall at an oblique angle is a question of degree, resolved by standing on the highway and looking.

That last point is not a joke. The sensible way to answer these questions is to walk the highway with the drawings and photograph the wall from several points along it. An officer will do exactly that, and a photograph sheet in the submission saves a site visit.

Corner plots with two frontages

The corner plot is where the phrase does most of its work.

A typical corner house has its principal elevation to the road it is addressed from, and a long side elevation facing the side road. That side elevation fronts a highway. The house is otherwise identical to a mid-terrace equivalent, and its owner has fewer rights.

Where the plot backs onto a footpath rather than a road, the same analysis applies. A rear boundary onto an adopted footpath makes the rear elevation front a highway, which surprises people who think of highways as things with cars on them.

The practical response on a corner plot is to check each class you intend to rely on separately, because the restrictions are not uniform. Rear extension depth under Class A is governed by projection from the original rear wall and by boundary proximity, not by a highway test, and those limits are set out in Class A rear extension limits and the larger home scheme. Other classes bring the highway in directly.

Where the phrase actually bites

The provisions that turn on a wall or roof slope fronting a highway are narrower than the folklore suggests. They cluster around three areas.

Installations on the outside of the building. Flues, chimneys and soil vent pipes under Class G, and antennas and satellite dishes under Class H, carry restrictions on article 2(3) land tied to whether the element is on a wall or roof slope that fronts a highway or is visible from one. Article 2(3) land means conservation areas, National Parks, National Landscapes, the Broads and World Heritage Sites.

Microgeneration. Solar photovoltaic and solar thermal equipment under Part 14 is restricted on article 2(3) land where it would be installed on a wall fronting a highway.

Boundary treatment. Part 2 limits the height of gates, fences, walls and other means of enclosure to a lower figure where they are adjacent to a highway used by vehicular traffic, and to a higher figure elsewhere. Note the different wording: this one is about vehicular highways, which means a wall beside a footpath-only highway is treated differently.

Outbuildings under Class E are worth clearing up, because the myth is persistent. The Class E test is whether the building would sit forward of a wall forming the principal elevation of the original dwellinghouse, and on article 2(3) land there is a further restriction about land between a side elevation and the curtilage boundary. Neither is a highway test.

Resolving a disagreement with the case officer

Disagreements here are evidential, so answer them with documents.

  1. Obtain a definitive map extract for the route in question, and ask the surveying authority to confirm the status and the recorded width.
  2. Obtain an extract from the list of streets showing whether the way is maintainable at public expense.
  3. Produce a dimensioned site plan showing the house, the curtilage, the highway and the element you propose to install, with the relationship annotated.
  4. Photograph the relevant wall from several points along the highway, dated.
  5. Set out in writing which class you rely on, quoting the wording, and why the wall does or does not front the highway on the evidence.

If the officer still disagrees, the formal route is an application under section 192 of the Town and Country Planning Act 1990 for a certificate of lawfulness of proposed use or development. It costs half a planning application fee, the test is lawfulness rather than planning merit, and a refusal carries a right of appeal. A lawful development certificate is the only formal way to confirm that works are lawful.

A Planning Statement setting out the site's highway context, the principal elevation analysis and the class relied on gives you the spine of either submission. Draft one with PlanScope and have it checked before it goes in.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a public footpath a highway for permitted development purposes?

Yes. A highway is any way over which the public has a right of passage, which includes footpaths, bridleways, restricted byways and byways open to all traffic as well as roads. That is why a gable facing a public footpath can be treated as a side elevation fronting a highway, even though no vehicle ever passes.

Can a house have two principal elevations?

Government technical guidance treats a dwellinghouse as having one principal elevation, normally the front, containing the main architectural features and usually the main entrance. On a corner plot the second frontage is a side elevation even though it faces a road. The exception is a building designed with two equally important fronts, which is rare and needs arguing.

Does the highway have to adjoin my boundary?

No. The test in the relevant classes is whether the wall or roof slope fronts a highway, which is about facing towards and being seen from it rather than about adjoining it. A wall set back behind a verge or a grass strip can still front the highway. A wall facing a highway across other buildings generally does not.

Is a private drive a highway?

Not unless public rights exist over it. Many private drives and unadopted roads carry no public right of way, in which case they are not highways for these purposes. Some, though, carry a recorded public footpath along their length, so check the definitive map and the authority's list of streets rather than assuming from the surfacing or ownership.

How do I settle a disagreement with the case officer?

Provide evidence rather than argument: a definitive map extract, the highway authority's register of publicly maintainable highways, a dimensioned site plan and photographs from the highway towards the wall. If the disagreement persists, apply under section 192 of the Town and Country Planning Act 1990 for a certificate that the proposed works would be lawful.

Sources and further reading

permitted developmenthighwayprincipal elevationcorner plothouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →