Energy, Sustainability and Carbon

Solar farms on best and most versatile land

6 min readBy PlanScope Editorial Team

Grades 1, 2 and 3a are best and most versatile. The published maps do not split Grade 3, which is why a site specific survey settles most solar applications.

A solar farm agricultural land classification argument is rarely about whether solar is acceptable in principle. It is about whether the site is best and most versatile land, which means Grades 1, 2 and 3a, and whether poorer land could reasonably have been used instead. Objectors know the terms. Parish councils quote them. And the provisional maps that everyone starts from cannot answer the question, because they do not separate Grade 3a from Grade 3b at all.

That gap between the published map and the policy test is where most of these applications are won or lost.

Why land grade decides these applications

National policy asks decision makers to recognise the benefits of the best and most versatile land and, where development of agricultural land is shown to be necessary, to use areas of poorer quality in preference to higher quality. Verify the current wording and policy reference in the edition of the Framework in force when you write, because the Framework has been reissued more than once and the numbering has changed.

The practical effect is a two part test. Is the land best and most versatile, and if some of it is, has the applicant shown why a lower grade alternative would not work. An application that ignores the second half of that question invites a refusal reason that is difficult to answer at appeal.

Natural England becomes a statutory consultee where a proposal not in accordance with the development plan would involve the loss of 20 hectares or more of Grade 1, 2 or 3a land, which is a threshold worth knowing before the red line is drawn.

Commissioning an agricultural land classification survey

The provisional maps produced in the 1980s were drawn at a scale suited to regional planning. They show Grade 3 undivided, and their boundaries are not reliable at field level. Relying on them is the first mistake, in both directions: applicants who assume their Grade 3 land is 3b, and objectors who assume it is 3a.

A site specific survey applies the published classification guidelines, assessing climate, site factors such as gradient and flood risk, and soil properties including texture, depth, stoniness and wetness class. Fieldwork is normally a grid of auger borings across the site, supplemented by soil pits, at a density appropriate to the variability of the ground.

Commission the survey from a soil scientist with agricultural land classification experience, and ask for the raw auger logs as well as the report. A survey that produces a grade with no supporting profile descriptions is not evidence anyone can test. Professional review of this sort of work is strongly advised, and for specialist technical reports, qualified professional input may be required.

Survey timing and soil conditions

Augering is possible for much of the year, but the results depend on conditions. Waterlogged ground makes wetness class assessment unreliable and can make augering physically impossible. Frozen or baked ground gives poor recovery and misleading texture assessment.

Plan the survey for a period when the soil is moist but not saturated, and record the antecedent weather in the report. Objectors and consultees do read this section, and a survey carried out in the middle of a drought or immediately after prolonged rain gives them something to argue about.

Standing crops are the other constraint. Access needs the occupier's agreement and the timing has to work around the farming calendar, which on an arable site usually means a window after harvest.

Making the sequential case for the site

The sequential argument is not a national requirement in the way the flood risk sequential test is, but authorities expect something equivalent, and the better applications supply it without being asked.

Set out the search area, and explain what defined it. For solar that is almost always the grid connection: the available capacity at a particular substation, the connection offer, and the cost of cable routing. Then show the sites considered, the grade of land at each, and why they were discounted, whether for grid reasons, heritage or designation constraints, willing landowners or deliverability.

Be specific rather than generic. A paragraph saying that alternatives were considered and rejected persuades nobody. A table naming five candidate parcels with their constraints does.

Reversibility, soil protection and restoration

The strongest argument an applicant has is that the land is not lost. Solar development is reversible in a way that housing is not, and permissions are normally time limited with decommissioning and restoration secured by condition.

Make that argument concrete. Mounting on driven piles rather than concrete foundations. Cable trenching with soils stripped, stored and replaced in sequence following the published construction code of practice for soils. Minimal hardstanding, limited to the substation compound and the access track. A defined operational period, a decommissioning method statement and a restoration scheme secured by condition or obligation, with a bond where the authority asks for one.

Soil condition after 40 years under grass, undisturbed and unfertilised, is frequently better than it was at the start. Say so, and say what evidence supports it, rather than asserting it. The same discipline about end of life material recovery that sits behind pre-redevelopment audits and reuse targets applies to panel and frame recovery at decommissioning.

Grazing, biodiversity and dual use arguments

Continued agricultural use between and beneath the rows is the other half of the reversibility case. Sheep grazing is the usual proposal and it works where row spacing, fencing and water supply are designed for it from the outset rather than added afterwards.

Biodiversity net gain is mandatory, and a solar site converting arable to species rich grassland with hedgerow enhancement can deliver gain comfortably on site. That is a genuine benefit, and it is also a commitment that has to be managed and monitored for 30 years, which means a management plan and a party responsible for it.

Do not overclaim. A scheme described as agricultural land in continued productive use, with no grazing agreement, no water supply and fencing that excludes livestock, will be read for what it is.

Evidence that answers the usual objection

The objection is almost always the same: prime farmland is being taken out of food production during a period of concern about food security. Answer it with evidence rather than with a policy quotation.

Provide the site specific classification with the auger logs, a plan showing the grade distribution across the site with areas in hectares, the alternatives assessment tied to grid capacity, the proposed operational period with decommissioning secured, the soil handling method, the grazing or management regime with the mechanism securing it, and the biodiversity gain position. Where the site does include some best and most versatile land, say so plainly and explain how much and why the layout cannot avoid it.

Carbon arguments help at the margin, and a Whole Life Carbon Assessment or an equivalent figure for the scheme's generation over its life gives the benefit side of the balance something to weigh. Keep the wider policy narrative in a Sustainability Statement so the classification evidence stands on its own.

One more check before submission. Larger solar schemes are consented as nationally significant infrastructure rather than by the local authority, and the capacity threshold for that route has been changed, so confirm the current figure applies to your scheme before choosing the application route.

This is general guidance, not legal advice. Check the position with your local planning authority and Natural England before relying on it.

Enter your postcode on PlanScope to see which reports a rural energy scheme is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What counts as best and most versatile land?

Grades 1, 2 and 3a in the agricultural land classification system. Grade 3b, 4 and 5 fall outside it. The distinction matters because national policy asks decision makers to use poorer quality land in preference where development of agricultural land is shown to be necessary, and Grade 3 is where most arguments happen.

Why is a site specific survey needed?

Because the provisional maps were drawn at a regional scale and show Grade 3 undivided, so they cannot tell you whether land is 3a or 3b. Their boundaries are also unreliable at field level. A survey applying the published classification guidelines, with auger borings and soil pits, is the only way to answer the policy test.

When should an ALC survey be carried out?

When the soil is moist but not saturated. Waterlogged ground makes wetness class assessment unreliable and can prevent augering, while frozen or baked ground gives poor recovery and misleading texture assessment. Record the antecedent weather in the report, and plan access around standing crops and the farming calendar.

Is Natural England consulted on solar applications?

It becomes a statutory consultee where a proposal not in accordance with the development plan would involve the loss of 20 hectares or more of Grade 1, 2 or 3a land. That threshold is worth checking against the red line early, since it changes the consultation position and the evidence expected.

Does reversibility actually help the case?

Yes, when it is evidenced rather than asserted. Driven pile mounting, soil handling to the published construction code of practice, minimal hardstanding, a defined operational period and a decommissioning and restoration scheme secured by condition all make the argument concrete. A claim of reversibility with no method statement behind it does not.

Sources and further reading

solar farmagricultural landalcrural developmentrenewable energy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Energy, Sustainability and Carbon

View all →
Energy, Sustainability and Carbon6 min read

Embodied carbon of foundations and ground works

On brownfield sites the substructure can carry more embodied carbon than the frame above. How piling, rafts, ground improvement and mix design compare, and how to report substructure so the saving is reviewable.

Read article →
Energy, Sustainability and Carbon7 min read

Green roofs: what counts and what the drawings must show

A thin sedum blanket satisfies almost no current policy. What separates extensive, biodiverse and intensive roofs, how much attenuation credit to expect, and the drawings that discharge the condition.

Read article →
Energy, Sustainability and Carbon6 min read

Water efficiency standards and how to hit 110 litres

The tighter 110 litre standard applies only where a plan policy adopts it and a condition imposes it. How the water efficiency calculation works and which fittings decide the result.

Read article →
Energy, Sustainability and Carbon7 min read

Energy and carbon conditions: what gets discharged when

Energy and carbon conditions bite at different points in the programme. The triggers, the as-built evidence councils accept, and what to do when design changes break one.

Read article →
Energy, Sustainability and Carbon7 min read

Overheating risk in a loft conversion

Sloping rooflights collect more solar gain than vertical windows, and a converted loft has almost no thermal mass. Part O rarely applies, so the design has to deal with it.

Read article →
Energy, Sustainability and Carbon7 min read

Electricity grid capacity and when it stops a scheme

Capacity is a deliverability problem, not a policy objection. What to ask the network operator, how to read an offer, and how phasing conditions should be drafted.

Read article →