Permitted Development

Solar panels on houses: Part 14 Classes A and B

7 min readBy PlanScope Editorial Team

Class A covers panels on a roof, Class B a stand-alone array in the garden. The dimensional limits, the two standing conditions and where listed building consent still bites.

Most domestic solar panels go up without a planning application because solar panel permitted development is granted by Part 14 of the Town and Country Planning (General Permitted Development) (England) Order 2015. Class A covers equipment fixed to a house or a building in its curtilage. Class B covers a stand-alone array in the garden. Both come with limits that are easy to breach by accident, and both carry two conditions that stay with the installation for its whole life.

The rules are dimensional rather than discretionary. Get the projection, the ridge height and the boundary distance right and you do not need permission. Get one of them wrong and the whole installation is unlawful, which matters most when you sell.

What Class A allows on a roof

Class A permits the installation, alteration or replacement of microgeneration solar photovoltaic or solar thermal equipment on a dwellinghouse or a block of flats, and on a building within the curtilage of either. That last part covers a garage or a garden office roof.

The equipment has to be for microgeneration. A domestic roof array is comfortably within that. An installation designed to export at commercial scale from a house roof is not, and the fact that you have a grid connection agreement does not change the planning position.

Where the building is a block of flats rather than a house, Class A still applies, but ownership and the lease usually decide the question long before planning does. The roof of a converted building is often retained by the freeholder.

The 200 millimetre projection and the ridge line

Two dimensional limits do most of the work in Class A.

The equipment must not protrude more than 200 millimetres beyond the plane of the wall or the roof slope, measured perpendicular to that surface. On a pitched roof that is generous for in-plane or on-plane panels and tight for anything mounted on a raised frame.

The equipment must not sit higher than the highest part of the roof, excluding the chimney. Flat roofs are where installers get caught, because a tilted frame on a flat roof can breach both limits at once. Measure from the existing roof surface, not from the parapet.

Limit Class A (on a building) Class B (stand-alone)
Projection beyond the surface 200 mm maximum Not applicable
Height No higher than the roof, chimneys excluded 4 m maximum
Area No area limit 9 m2 maximum, and no dimension over 3 m
Distance to boundary Not applicable At least 5 m
Number No stated limit One stand-alone installation per curtilage

Treat the table as the starting point and read the current text of Part 14 before you order the frame. The GPDO is amended often, and the version on legislation.gov.uk is the one that counts.

Stand-alone arrays in the garden under Class B

Class B covers a ground-mounted array in the curtilage of a house or block of flats. The array must not exceed four metres in height, must not be within five metres of the boundary of the curtilage, and the surface area of the equipment must not exceed nine square metres with no dimension over three metres including any housing or supporting framework.

Only one stand-alone installation is permitted within the curtilage. But a second array needs planning permission even where the first one is small and barely visible.

Nine square metres is roughly four or five panels. For most households that is a supplement to a roof array rather than an alternative to it, which is why ground-mounted domestic solar is far less common than the rules would suggest. A larger garden array is a full application, and on an open plot it will be assessed on visual impact and glint.

Conservation areas, listed buildings and Article 4

In a conservation area or a World Heritage Site, Class A does not permit wall-mounted solar on a wall that fronts a highway. Roof-mounted equipment on the rear or side slope is normally still permitted, though the siting condition below still applies.

Under Class B, in a conservation area or World Heritage Site the array must not be nearer to any highway bounding the curtilage than the part of the house nearest that highway. Neither class permits installation on a scheduled monument or within the curtilage of one.

Listed buildings are the bigger trap. Listed building consent under the Planning (Listed Buildings and Conservation Areas) Act 1990 is required for works affecting the special architectural or historic interest of the building, and that duty sits entirely outside the GPDO. Panels on a listed roof, and often on an outbuilding within its curtilage, need consent whatever Part 14 says. Assume consent is required, talk to the conservation officer early, and support the application with a Heritage Statement that addresses reversibility, fixings and views from the street.

An Article 4 direction can withdraw Part 14 rights for a defined area. They are less common for solar than for householder extensions, but they exist. Check the council's Article 4 register before you rely on permitted development.

The two conditions attached to every installation

Class A and Class B both carry the same pair of conditions, and they are easy to overlook because they are not dimensional.

First, the equipment must, so far as practicable, be sited to minimise its effect on the external appearance of the building and the amenity of the area. That is a genuine obligation, not a statement of intent. Putting an array on a front slope when the rear slope faces south-west at a similar yield invites an enforcement enquiry.

Second, the equipment must be removed as soon as reasonably practicable when it is no longer needed for microgeneration. Dead panels left on a roof for years are technically a breach.

Neither condition needs a council sign-off. Both can be the basis of an enforcement notice if a neighbour complains and the council agrees the siting was avoidable.

Battery storage and where it sits

Part 14 covers the generating equipment. It does not cover a battery.

A battery installed inside the house, in a garage or in an existing outbuilding is usually not development at all, because there is no building operation and no material change of use. A free-standing battery cabinet in the garden is a building operation, and its planning position comes from Part 1 Class E of the GPDO as an outbuilding incidental to the enjoyment of the dwellinghouse. Class E carries its own limits on height, position relative to the highway and total curtilage coverage.

That means the same installation can be lawful under two different classes with two different rulebooks. Where the battery cabinet sits forward of the principal elevation, or the property is in a conservation area, the outbuilding rules may bite even though the panels are fine.

Proving it was lawful when you sell

Permitted development leaves no paper trail. A conveyancing solicitor asking for evidence four years later will not accept an installer's word for it.

The clean answer is a lawful development certificate for existing use or development under section 191 of the Town and Country Planning Act 1990, or a certificate for proposed development under section 192 before you start. The proposed version costs less and moves faster, because you are describing a design rather than proving a history. A short Planning Statement setting out the projection, ridge height and boundary distances against the Part 14 wording is usually all the certificate application needs.

Keep the roof photographs, the panel specification and the installer's mounting detail. Those three documents answer nearly every question a purchaser's solicitor raises.

If the scheme also involves an outbuilding, a heat pump or an extension, check each element against its own class rather than assuming a single permitted development answer covers the lot. You can browse all 66 PlanScope report types to see which supporting documents a certificate or full application would need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it, and remember that a lawful development certificate is the only formal way to confirm that works are lawful. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Do I need planning permission for solar panels on my house?

Usually not. Class A of Part 14 of the GPDO 2015 permits solar equipment on a dwellinghouse provided it protrudes no more than 200 millimetres beyond the wall or roof plane and sits no higher than the highest part of the roof, excluding chimneys. Conservation areas restrict wall-mounted panels on elevations fronting a highway.

How big can a ground mounted solar array be without permission?

Class B allows one stand-alone installation per curtilage, up to four metres high, with a surface area no greater than nine square metres and no dimension over three metres including the frame. It must sit at least five metres from the boundary of the curtilage. Anything larger needs a planning application.

Can I put solar panels on a listed building?

Listed building consent under the Planning (Listed Buildings and Conservation Areas) Act 1990 is required for works affecting the special architectural or historic interest of the building, and that duty is separate from permitted development. Assume consent is needed for panels on a listed roof, and discuss reversible fixings and public views with the conservation officer first.

Does permitted development cover a home battery?

No. Part 14 covers the generating equipment only. A battery inside the house or an existing outbuilding is usually not development. A free-standing cabinet in the garden is assessed as an outbuilding under Part 1 Class E, with its own limits on height, position relative to the highway and coverage of the curtilage.

How do I prove my panels were permitted development?

Apply for a lawful development certificate under section 191 or section 192 of the Town and Country Planning Act 1990. The proposed development version is quicker because you describe the design rather than prove a history. Keep the mounting detail, panel specification and roof photographs for the conveyancing enquiries that follow.

Sources and further reading

solar panelspermitted developmentgpdohouseholderconservation areamicrogeneration

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

Permitted development on a house created under Class Q or MA

A dwelling created through a Part 3 prior approval has no Part 1 permitted development rights, so extensions and outbuildings need an application. Curtilage is the harder problem.

Read article →
Permitted Development6 min read

Running a business from home: when permission is needed

Most home businesses need no permission because the use of the house has not materially changed. Visitors, deliveries, noise and storage are what shift the answer.

Read article →
Permitted Development7 min read

Shepherd's huts, pods and mobile structures in a garden

A garden hut can be lawful with no permission at all, or an enforcement risk, depending on whether it is a building and how it is used. The use is what councils look at.

Read article →
Permitted Development6 min read

Cladding, render and external finishes: what needs permission

Re-rendering a house is usually permitted development under Class A. Designated land, listed buildings and Article 4 directions are where that right disappears.

Read article →
Permitted Development6 min read

Does a conservatory count towards the extension allowance

A conservatory attached to the house is an enlargement under Class A, so it uses the same depth allowance as a brick extension, measured from the original rear wall.

Read article →
Permitted Development6 min read

Designated land and the permitted development you lose

Designated land does not have a separate rulebook. The same classes apply with paragraphs switched off, and knowing which ones bite decides whether you need permission.

Read article →