Use Classes and Change of Use

Splitting one unit into two commercial premises

7 min readBy PlanScope Editorial Team

Two smaller units let more easily, and the split usually needs permission. What to submit, which conditions to check first, and why means of escape decides viability.

Subdividing a commercial unit is usually worth doing and almost always needs an application. Two smaller shops let more easily than one large one, and the rent per square metre goes up. What landlords underestimate is that splitting one planning unit into two can be development in its own right, even where both halves stay in exactly the same use class, and the works that make the split usable generally need permission whatever the use position is.

This is the execution guide. The legal tests are set out separately in the piece on the planning tests for subdividing a commercial unit, and what follows assumes you have satisfied yourself on those and want to know what to submit and in what order.

Whether subdivision is development

Start with the planning unit. The courts have approached the question by asking what the unit of occupation is and whether the activities within it are ancillary to a single main use, an approach that traces back to the reasoning in Burdle. Where one occupier holds the whole and one main use runs through it, that is a single planning unit.

Create two separate occupations with independent access, servicing and control, and you have created two planning units. Whether that amounts to a material change of use depends on the effects in planning terms: trip generation, servicing demand, hours, noise, waste, and the character of the frontage. Doubling the number of shopfronts on a parade is a change in character that officers notice.

For dwellings the position is settled by statute, because the Town and Country Planning Act 1990 treats the use of a building as two or more separate dwellinghouses as involving a material change of use. There is no equivalent provision for commercial premises, which is why the commercial answer is fact-sensitive rather than automatic. Where the position matters commercially, a certificate of lawfulness for a proposed use or development under section 192 of the 1990 Act is the formal way to establish it.

Creating separate planning units in practice

The features that make two units two units are the ones to describe clearly in the application.

  • Separate customer entrances from the street or from a common lobby
  • Separate service and refuse arrangements, with bin capacity for each
  • Separate sanitary provision and separate staff facilities
  • Independent metering and, where needed, independent plant
  • A physical division that is not readily reversible
  • Separate leases and separate rating assessments

That last pair sits outside the planning system, and it is evidence of the position rather than the cause of it. A single lease over both halves with a partition that could be removed in a weekend is a weaker case for two units than two leases and a masonry wall.

Shopfront and access alterations

Internal works alone are rarely development, because the definition of development turns on building works that materially affect the external appearance or on a material change of use. The moment the split needs a second door, a new shopfront, a mullion where the glazing ran continuously, or a change to the fascia, external works are engaged.

Shopfront design is where these applications get refused. A wide traditional shopfront divided into two narrow ones can lose the proportions that made the frontage work, particularly on a historic parade. The moves that succeed are keeping the original stallriser, cornice and fascia line running across both halves, dividing with a pilaster that matches the existing rhythm rather than a plain post, and keeping the two fascias to a single depth and alignment. Where the building is listed, listed building consent is needed in addition to planning permission, and the internal division becomes part of that assessment because internal works to a listed building require consent.

New fascia signs and any illumination may also need express advertisement consent, and it is cleaner to apply for that separately than to leave signage undrawn.

Servicing, waste and parking for each unit

Two units generate more of almost everything than one did. Officers will ask for the arithmetic.

Item What to show
Refuse Bin capacity for each unit, storage location, collection point and frequency
Deliveries Where each unit's deliveries are made and how long a vehicle waits
Parking Provision against the council's standards for each proposed use
Cycle parking Provision for staff and customers where standards require it
Servicing conflicts Whether two deliveries can be accommodated at once

Parking standards are applied per unit, and two units of the same combined floorspace can attract a higher requirement than one. In a town centre with a controlled parking zone that may not matter. In an out-of-centre parade with a shared forecourt it frequently does, and a Transport Statement covering servicing and parking demand for both units is proportionate evidence.

Think about the likely occupiers rather than the theoretical ones. If half the unit will realistically end up as a takeaway, the extraction, odour and late-hours questions arrive with it, and applying for the split without addressing them just moves the argument to the next application.

Conditions attached to the original permission

Check the planning history before anything else. Conditions restricting subdivision are common, particularly on retail parks, industrial estates and units granted permission as a single large floorplate to protect a town centre.

Typical wording prevents the unit being subdivided into more than one retail unit, or restricts the goods that may be sold, or limits the net sales area. Where such a condition exists, the application is an application under section 73 to vary or remove it, and the council will reconsider the reason the condition was imposed. On a retail unit that reason is usually town centre impact, so expect to address the sequential test and impact policy in the supporting statement if the resulting units fall within the relevant thresholds.

Conditions on a use class basis matter too. A permission granted for a specific use before the 2020 use class changes may be tied to that use by condition, which can restrict the flexibility that Class E otherwise gives. And some uses sit outside the classes altogether, so understanding which uses are sui generis tells you what each half can actually be let to without a further application.

Building Regulations implications

Planning and Building Regulations are separate consents, and subdivision engages the Regulations comprehensively.

Means of escape has to work for each unit independently, which on a deep unit with one frontage is the technical problem that decides whether the split is viable at all. Fire separation between the units to the standard in Approved Document B, protected escape routes, accessibility and sanitary provision under the other Approved Documents, and any structural work to form openings all need a Building Regulations application. Get a designer to test escape before you spend on a planning application, because a split that cannot be made to comply is not worth pursuing.

The application pack

  1. Existing and proposed floor plans and elevations, drawn to scale, with the division and each unit's area clearly marked.
  2. A Planning Statement covering the planning unit analysis, the use class position for each half, the planning history and any condition to be varied.
  3. Section 73 application where a condition restricts subdivision, quoting the condition in full.
  4. Servicing and refuse details, with bin capacity per unit.
  5. Transport and parking evidence where standards or access make it necessary.
  6. A Ventilation and Extraction Statement where any half is intended for food preparation.
  7. Advertisement consent application for new or altered signage.
  8. Listed building consent where the building is listed, covering internal as well as external works.

Draft the supporting statement and the servicing details together, since the officer will read them as one document whatever order you submit them in. This is general guidance rather than legal advice, so check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is subdividing a commercial unit development?

It can be. Where two separate occupations with independent access, servicing and control replace one, two planning units are created, and whether that is a material change of use depends on effects such as trip generation, servicing, hours, waste and the character of the frontage. Statute settles the position for dwellings but there is no equivalent provision for commercial premises.

Do I need permission if both halves stay in Class E?

Possibly. Movement within Class E is not development, but the subdivision itself is a separate question, and the external works that make the split usable almost always need permission. A new shopfront, a second entrance or an altered fascia materially affects external appearance, which brings the works within the definition of development.

What if a condition prevents subdivision?

Then the application is one under section 73 to vary or remove that condition, quoting it in full. The council will reconsider why the condition was imposed, which on a retail unit is usually town centre impact. Expect to address sequential and impact policy in the supporting statement where the resulting units reach the relevant thresholds.

How is parking assessed for two units?

Standards are applied per unit, so two units of the same combined floorspace can attract a higher requirement than one. In a town centre with controlled parking that may not matter. On an out-of-centre parade with a shared forecourt it often does, and a transport statement covering servicing and parking demand for both units is proportionate.

What Building Regulations issues does a split raise?

Means of escape for each unit independently, which on a deep unit with a single frontage is often the point that decides viability. Fire separation to the standard in Approved Document B, protected escape routes, accessibility, sanitary provision and any structural work to form openings all need a Building Regulations application. Test escape before spending on the planning application.

Sources and further reading

subdivisionuse classesclass eshopfrontlandlord

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Soft play centres: Class E(d) or Class F2?

Indoor recreation sits in Class E(d); Class F2 covers outdoor recreation and community halls. This explains how to classify a play centre, why it matters for later flexibility, and the noise and parking evidence expected.

Read article →
Use Classes and Change of Use7 min read

Shisha lounges and where they sit in the use classes order

A shisha venue is classified by what it primarily does, and the smoke-free definition of substantially enclosed premises dictates what can be built. This sets out both tests and the conditions that follow.

Read article →
Use Classes and Change of Use7 min read

Petrol stations, forecourt shops and ancillary retail

A filling station falls in no use class, so the shop is lawful only while it stays ancillary. This sets out the ancillary test, the floorspace conditions that control it, and the storage and charging consents that sit alongside planning.

Read article →
Use Classes and Change of Use7 min read

The planning unit and when one building holds two uses

Identifying the planning unit decides whether a building in two occupations has one composite use or two, which permitted development rights apply, and when immunity starts to run.

Read article →
Use Classes and Change of Use7 min read

Gyms, climbing walls and Class E(d) indoor sport

A shop or office in Class E can become a gym without planning permission for the use. The fit-out, the plant and the structure-borne noise from free weights are the real applications.

Read article →
Use Classes and Change of Use6 min read

Part 4 temporary use rights and the day limits

Class B of Part 4 allows temporary use of land for a limited number of days each calendar year. The exclusions, the counting and the ban on permanent works catch people out.

Read article →