Templates, Checklists and Examples

A statement of common ground that narrows the issues

7 min readBy PlanScope Editorial Team

The point of a statement of common ground is to stop an inspector spending a day on facts nobody disputes. Drafted carelessly, it concedes things you needed to argue.

A statement of common ground appeal document exists to reduce what the inspector has to decide. It records what the appellant and the authority agree about the site, the history, the policy framework and the figures, and it identifies precisely what remains in dispute. Done properly it removes a day from an inquiry and sharpens the evidence on both sides. Done carelessly it hands the authority an agreed fact you needed to contest.

It is a joint document. That is the part practitioners find hardest, because the drafting is adversarial in instinct and collaborative in form.

What the document is for and who drafts it

The Planning Inspectorate expects a statement of common ground on appeals proceeding by hearing or inquiry, and increasingly encourages one on larger written representations appeals. The appeal start letter sets the deadline, and it is earlier than most people expect.

In practice the appellant's agent produces the first draft, because the appellant is the party with the incentive to move quickly. The authority then marks it up. Two or three exchanges usually settle it, with a final version signed by both parties.

Write the first draft to be signed, not to be negotiated. A draft stuffed with favourable characterisations comes back covered in tracked changes and burns two weeks. A draft that is scrupulously neutral on the contested points, and generous on the uncontested ones, gets signed.

Where the issues are technical, produce topic-specific statements as well: highways, ecology, heritage, drainage, viability. Each one is agreed between the relevant witnesses rather than between the agents, and that is what makes them useful.

Structure: agreed facts, agreed policy, matters in dispute

A workable structure runs in this order.

  1. The parties, the appeal reference and the procedure.
  2. The appeal site and its surroundings, described factually.
  3. The proposal, as described in the application and as amended.
  4. Relevant planning history, with references and dates.
  5. The development plan, listing the policies both parties consider relevant, and their status.
  6. Other material considerations both parties accept as relevant, including national policy and any supplementary guidance.
  7. Agreed facts and figures.
  8. Matters agreed between the parties, expressed as propositions.
  9. Matters in dispute, expressed as questions for the inspector.
  10. Draft conditions and, where relevant, the status of any obligation.
  11. Core documents list.

Separating items 8 and 9 is what gives the document its value. A statement that lists agreed facts but never says what is actually in dispute leaves the inspector to work it out from two statements of case.

Site description and planning history

These sections look like housekeeping and are not.

The site description will be quoted in the decision. Agree the measurements, the levels, the boundary treatments, the distances to neighbouring windows, the character of the surrounding area in factual terms. Resist adjectives that carry a planning judgement. "The site is an open paddock" is a fact. "The site is an attractive open paddock forming a valued gap" is the authority's case.

Planning history should list every relevant application with reference, description, date and outcome, including refused and withdrawn schemes, and any enforcement history. Where an earlier permission is capable of implementation, say so and agree the fallback position, because a live fallback is frequently the strongest point the appellant has.

Appeal decisions relied on by either party belong in the core documents list rather than in the narrative. They are indicative of how inspectors have approached an issue, not binding precedent, and characterising them in an agreed document invites an argument you do not need.

Agreeing figures before arguing about them

The single greatest saving comes from agreeing arithmetic.

Housing land supply calculations, trip generation, floor areas, unit mix, distances, daylight results, viability inputs, biodiversity units. In each case the parties usually disagree about a judgement applied to a number, not about the number itself. Agreeing the number, and isolating the judgement, converts a half day of evidence into a paragraph.

Where the figures really do differ, agree the method and the source instead, then present both results in a table with the point of divergence identified. An inspector who can see exactly where two experts part company can decide the point. One who receives two incompatible sets of numbers with no common basis usually prefers neither.

The discipline is the same as setting out an appraisal transparently, which is why a viability appraisal inputs schedule is a useful model for how to present contested figures.

What should never be conceded by accident

Four things get given away in drafting.

Policy interpretation. Agreeing that a policy "requires" something, when your case is that it does not, loses the point before the inquiry opens. Agree which policies are relevant. Do not agree what they mean unless you mean to.

Weight. Agreed statements about the weight to be given to a consideration are a matter for the inspector, and agreeing them is both wrong in principle and damaging in practice.

The planning balance. Nothing in a statement of common ground should express a conclusion on whether permission should be granted.

Harm. Agreeing that a proposal causes harm, even qualified as limited, concedes the first half of the heritage or Green Belt test. If the case is that there is no harm, say the level of harm is in dispute.

One more, easy to miss: do not agree a description of development that differs from the one applied for, unless a formal amendment has been made. The inspector determines the appeal on the application as made.

Timing within the appeal timetable

For an inquiry, the statement of common ground is normally required around the same time as statements of case, and the Inspectorate has pushed these deadlines earlier to shorten inquiry time. For a hearing it is usually required with the statements.

Work backwards from that date and start the week the appeal is lodged. Councils have limited capacity, the case officer may have left, and the person who has to sign the document may be a team leader with no history of the application. Sending a complete, neutral draft at the outset gives them something to react to rather than something to create.

Where the authority will not engage, the appellant should submit a unilateral statement of common ground setting out what it says is agreed and what it believes is in dispute, and say plainly that the authority did not respond. That protects the position and, if the failure causes wasted expense, it may be relevant to an application for costs. The way those applications are assessed is covered in appeal costs awards, assessed and paid.

An illustrative structure for the disputed issues section

Set out each disputed matter as a question, followed by one short paragraph from each party. Illustrative only:

Issue Appellant position Authority position
Effect on the character of the area Infill consistent with the established pattern Erosion of an established gap
Highway safety Visibility achievable to the required standard Substandard visibility to the north
Five year housing land supply 4.1 years 5.2 years

Then, beneath the table, state which sub-issues within each are agreed. On housing land supply, for instance, the parties may agree the requirement and the buffer and differ only on the deliverability of three sites, which narrows the evidence enormously.

Keep the core documents list in the same document and number it, because everyone will refer to it for the rest of the appeal. And keep the Planning Statement from the original application in that list, since the inspector will want to see what was before the council. Where you need to assemble the wider evidence base again for the appeal, the report index is a quick way to check what was submitted and what was not.

This is general guidance, not legal advice. Appeal procedures and deadlines are set by the Inspectorate for each case, so follow the start letter and check the current procedural guide before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a statement of common ground compulsory?

It is required on appeals proceeding by hearing or inquiry, and the appeal start letter sets the deadline. On written representations it is not usually required, though the Inspectorate encourages one on larger cases. Even where it is optional, agreeing facts and figures shortens the process and improves the quality of the decision.

Who writes the first draft?

Normally the appellant's agent, because the appellant has the stronger incentive to move quickly. Write it to be signed rather than negotiated: neutral on contested matters, generous on uncontested ones. A draft that reads as advocacy comes back heavily amended and costs two weeks of an already short timetable.

What should not go into a statement of common ground?

Anything that expresses a planning judgement: the weight to be given to a consideration, the planning balance, whether harm arises, or what a policy means where its interpretation is disputed. Agree which policies are relevant, the facts, the figures and the history. Leave the judgements to the inspector.

What if the council will not engage with the draft?

Submit a unilateral statement setting out what you say is agreed and what you believe is in dispute, and record that the authority did not respond. That protects your position before the inspector, and where the failure causes unnecessary expense it may support an application for an award of costs.

Should technical topics have their own statements?

Yes, on anything with expert evidence. Highways, ecology, heritage, drainage and viability statements are agreed between the witnesses rather than the agents, which is what makes them useful. They typically agree method, data and figures, leaving only the interpretation for the inspector to resolve.

Sources and further reading

appealsstatement of common groundinquiryhearingplanning consultantevidence

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Templates, Checklists and Examples

View all →
Templates, Checklists and Examples7 min read

Checklist for responding to planning objections

An applicant's response to objections is a sorting exercise first. Answer the material points with dimensioned evidence, acknowledge private law issues in one neutral sentence, and offer conditions where you cannot prove a point.

Read article →
Templates, Checklists and Examples6 min read

Checklist for handover of planning documents at completion

The planning file handed over at completion is what a buyer's solicitor asks for years later. Here is the index, and the records that are hardest to recreate.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a tree works application under a TPO

TPO applications are free and decided in eight weeks, but vague descriptions get them refused. Here is the evidence that gets consent granted as proposed.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a demolition prior notification submission

A demolition prior notification is narrow by design. The authority can consider only the method of demolition and the proposed restoration of the site.

Read article →
Templates, Checklists and Examples7 min read

Checklist for a larger home extension prior approval

A single storey rear extension deeper than 3m on a semi, or 4m on a detached house, needs prior approval under Class A. Here are the limits, the information to supply and how the neighbour consultation timetable works.

Read article →
Templates, Checklists and Examples7 min read

Checklist for responding to an invalid application notice

Until an application is validated there is no determination clock. Here is how to sort each item on an invalidity notice, decline requests that are not on the published local list, and protect the validation date.

Read article →