Statutory biodiversity credits and when to use them

6 min readBy PlanScope Editorial Team

Credits close a net gain shortfall when on-site and off-site delivery are exhausted. The evidence that they were exhausted is what authorities actually test.

Statutory biodiversity credits are the last resort in the biodiversity net gain hierarchy, and they are priced so that you will not want to use them. Buying credits from the government discharges the 10 per cent gain requirement when on-site delivery and off-site units have both been exhausted, and the price is set deliberately above the market rate for equivalent off-site units. That is the design, not an accident of the market.

For a developer appraising a constrained site, the useful question is not whether credits are expensive. It is whether the scheme can evidence that it had no alternative, because that evidence is what the local planning authority tests when it approves the biodiversity gain plan. The position described here is as at September 2026, and prices and rules should be checked on GOV.UK before they are relied on.

Where credits sit in the hierarchy

Mandatory biodiversity net gain under the Environment Act 2021 works through a condition deemed attached to most planning permissions, requiring a biodiversity gain plan approved by the authority before development begins. The plan has to show a 10 per cent gain measured with the statutory metric, secured for at least 30 years.

The hierarchy runs in a fixed order:

  1. Avoid and minimise harm to existing habitat on site, then deliver gain on site.
  2. Where on-site delivery falls short, secure off-site biodiversity units, either on land you control or from a registered provider.
  3. Where neither closes the gap, buy statutory biodiversity credits from the government.

Each step has to be shown to have been considered before moving to the next. Skipping straight to credits because it is administratively simpler is the mistake that gets gain plans refused.

How the credits are priced, and why

The government publishes a price list with credits tiered by habitat type, so replacing a distinctiveness band that is hard to recreate costs more than replacing common grassland. Prices are reviewed and updated, and the published schedule is the only reliable source, so quote it at the date you price the scheme rather than relying on a figure from a previous appraisal.

The pricing principle is the part worth understanding. Credits sit above the expected market price for equivalent off-site units precisely so that the private market in habitat banks develops and so that habitat is created in real places rather than paid for in the abstract. Receipts are directed to habitat creation through government programmes, but the site of that habitat is not yours to choose and carries no local benefit you can point to at committee.

That last point matters more than the money on a scheme where local ecological benefit is politically contested.

When a scheme may rely on credits

Credits are available to any development subject to the gain condition, but relying on them requires the gain plan to explain the steps taken. In practice, three situations recur.

A tight urban site with no surrounding land, where on-site gain is limited to green roofs and planting, and the shortfall is small. A scheme in an area where no registered off-site provider has units of the right habitat type available. And a scheme where programme pressure means an off-site agreement cannot be concluded in time, which is the weakest of the three and the one an authority is most entitled to push back on.

Where the shortfall is in a habitat that is hard to recreate, credits may be the only lawful route, because the trading rules in the statutory metric restrict what can be substituted for what.

Evidencing that on-site and off-site were exhausted

This is the part that is usually thin, and it is the part the authority reads most closely. A defensible record includes:

  • The metric outputs showing baseline, post-development on-site score and the residual shortfall in units by habitat type.
  • A design note explaining the on-site options tested and why each was rejected, with drawings rather than assertions.
  • Dated enquiries to registered off-site providers covering the relevant national character area, with their responses.
  • A note of any land in the applicant's control that was considered for off-site delivery.
  • The date the credit purchase was priced and the assumptions carried into the appraisal.

Dated enquiries are what separates a real search from a claim of one. Two emails sent the week before the gain plan is submitted read exactly as they are.

The ecological work behind all of this belongs to a competent person. The Environment Act 2021 regime expects the statutory metric to be completed by someone competent to do it, and a Biodiversity Net Gain Assessment drafted by anyone else is a starting point for that professional rather than a substitute. The habitat baseline itself normally comes from a Preliminary Ecological Appraisal carried out in an appropriate survey season.

How credits appear in the biodiversity gain plan

The gain plan is submitted after permission and before commencement. Where credits are used, it records the number and tier of credits, the residual shortfall they cover, and the purchase itself, which is made through the government service. The authority approves or refuses the plan, and development cannot lawfully begin until it is approved.

Two sequencing points catch people out. The credit purchase is generally made in connection with an approved plan rather than speculatively, so build the administrative step into the programme rather than assuming it can happen on the day. And a gain plan that relies on credits without the evidence described above can be refused, which stops the site rather than merely costing money.

What it does to a marginal appraisal

For a small scheme the credit cost is a line item. For a larger scheme with a substantial shortfall in a high distinctiveness habitat it can be material to viability, and it arrives late, after the land has usually been bought.

Three habits reduce the damage. Run the metric at the earliest design stage, not at planning submission, so that the shortfall is known while the layout can still change. Price the credit exposure as a worst case in the appraisal and carry it as a contingency. And test off-site availability during due diligence rather than after permission, because the answer changes the land value.

Where the cost tips the scheme, the shortfall belongs in the Viability Assessment with the metric outputs attached, rather than as an unexplained figure in a cost plan. Related reforms are moving too, and the planning law updates timeline is the place to follow them.

Where to check current prices and rules

Three sources, in this order. The GOV.UK guidance on biodiversity net gain for the operative rules and the current statutory credit prices. The Environment Act 2021 and the regulations made under it for the statutory position, including exemptions, which have been amended since the regime began. And the authority's own validation list and local plan, because some authorities seek gain above the statutory 10 per cent through local policy.

One honest uncertainty. The exemptions and the small sites position have both been adjusted since February 2024, and further change has been signalled. Check the current regulations for the specific scheme rather than relying on a summary written at any particular moment, including this one.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. For specialist technical reports, qualified professional input may be required.

PlanScope can draft the supporting narrative around a competent person's metric outputs. Browse the report types and start a draft. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What are statutory biodiversity credits?

They are credits sold by the government to discharge the biodiversity net gain requirement where a development cannot deliver the 10 per cent gain on site or through off-site units. They are the final step in the statutory hierarchy under the Environment Act 2021 and are priced above equivalent off-site units by design.

Can I go straight to buying credits?

Not without evidence. The biodiversity gain plan must show that on-site delivery was pursued first and that off-site units were sought, and the local planning authority approves or refuses the plan on that basis. Dated enquiries to registered off-site providers and a design note on rejected on-site options are what make the case defensible.

How much do biodiversity credits cost?

Prices are published by the government in a tiered schedule based on habitat type and are reviewed periodically, so check the current schedule on GOV.UK rather than carrying a figure across from an earlier appraisal. Higher distinctiveness habitats that are hard to recreate sit in more expensive tiers.

When is the biodiversity gain plan submitted?

After planning permission is granted and before development begins, because the gain condition prevents lawful commencement until the local planning authority has approved the plan. Where credits are relied on, the plan records the number and tier of credits and the residual shortfall they cover, so allow time in the programme.

Who has to prepare the metric calculation?

The statutory metric is expected to be completed by a competent person, and the habitat baseline normally comes from ecological survey work carried out in an appropriate season. A draft report prepared without that input is a starting point for the ecologist rather than a substitute for their judgement or their signature.

Sources and further reading

biodiversity net gainbng creditsenvironment act 2021ecologyviability

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates6 min read

Local validation lists: what authorities may require

A local list item only bites if it was published within two years and is reasonable for your scheme. How to check, and what to do when validation disagrees.

Read article →
Planning Law Updates8 min read

Temporary stop notices and how long they last

A temporary stop notice halts an activity on display, with no right of appeal, and now lasts up to 56 days in England. Here is what it can and cannot prohibit.

Read article →
Planning Law Updates7 min read

Appeal procedures compared: written, hearing and inquiry

You state a preference and the Inspectorate decides. Here is how the three appeal procedures are allocated, what each demands, and how to argue for the one you want.

Read article →
Planning Law Updates8 min read

Prior approval procedure and the deemed grant trap

The 56 day deemed grant under paragraph W runs from receipt, permits only what was submitted, and waives none of the class conditions. How to use it safely.

Read article →
Planning Law Updates7 min read

Permitted development conditions and the effect of a breach

A breached condition in the General Permitted Development Order leaves the whole extension unauthorised, not just the non-compliant part. What follows and how to fix it.

Read article →
Planning Law Updates7 min read

The standard method for local housing need explained

Local housing need now starts from existing stock rather than household projections. The result is a minimum for plan making, not a target, a ceiling or a test for any single application.

Read article →