Use Classes and Change of Use

When a storage yard stops being B8 and becomes sui generis

6 min readBy PlanScope Editorial Team

Open storage sits comfortably in Class B8 until something is done to the material. Sorting, breaking or processing changes the class, and the Use Classes Order names some yards as sui generis outright.

A yard full of stacked material is usually Class B8, which covers use for storage or as a distribution centre and says nothing about whether the storage happens indoors. The class stops applying at the moment something is done to the material. Sorting by hand may survive. Crushing, baling, shredding or dismantling will not.

Beyond that, the Use Classes Order takes three specific yards out of the class system altogether. Article 3(6) names a scrapyard, a yard used for the storage or distribution of minerals, and a yard used for the breaking of motor vehicles. Those uses are sui generis, meaning they sit in no class, so every change into or out of them requires planning permission.

That combination catches a lot of operators who assumed an industrial estate yard came with flexibility it never had.

What B8 actually covers

Storage and distribution. Pallets, steel stock, timber, plant hire fleets awaiting hire, containers, vehicles held before onward sale by a wholesaler, building materials for a merchant. The material arrives, sits, and leaves in substantially the state it arrived in.

Ancillary activity does not break the class. Loading, unloading, an office for the yard, a weighbridge, a small workshop maintaining the operator's own vehicles. Those are incidental to the storage use rather than separate uses in their own right, provided they stay clearly subordinate in scale.

Two tests help when the position is unclear. Is the material changed. And would an ordinary observer describe the operation as storage or as something else. The second sounds loose, but planning judgement on use is a matter of fact and degree, and that is broadly how inspectors approach it.

The boundary with B2 and the industrial process definition

An industrial process, as defined in the Order, is a process for or incidental to making, altering, repairing, adapting for sale, breaking up or demolishing an article, or getting, dressing or treating minerals, carried on in the course of trade or business.

Read that list against a typical waste or aggregates yard and the answer usually appears quickly. Crushing concrete treats minerals. Baling cardboard alters an article. Shredding is a process. Dismantling a vehicle for parts breaks up an article, and is separately named in article 3(6) anyway.

Where the process would be quiet, contained and free of emissions, the question becomes whether it falls within light industrial under Class E rather than B2, and the reasoning for that is set out in the discussion of what qualifies as light industrial. For most open yards it will not, because the activity is outdoors and audible.

Waste, minerals and the permitting overlap

Yards handling waste sit under two regimes at once, and operators routinely conflate them.

Planning controls the use of land. Environmental permitting, under the 2016 Regulations, controls the operation itself, with the Environment Agency issuing permits or registering exemptions depending on the waste types and tonnages. A permit does not authorise the use in planning terms, and planning permission does not remove the need for a permit.

Where scrap metal is involved, a scrap metal dealer licence from the council is a third consent, issued under the 2013 Act with its own suitability tests.

Minerals add another layer. A yard storing or distributing minerals is sui generis under article 3(6), and in a two tier area minerals and waste applications are determined by the county council rather than the district, which catches out applicants who submit to the wrong authority and lose weeks.

Evidencing a long standing use

Many yards have operated for decades without a clear planning history, and establishing what is lawful becomes the first job.

A certificate of lawfulness of existing use under section 191 is the formal route. The burden is on the applicant, on the balance of probability, and the evidence has to be dated and specific: aerial photography from successive years, invoices, accounts, tenancy agreements, delivery records, sworn statements from people who can speak to the operation over the whole period.

Two cautions. The enforcement time limit for breaches in England was extended to ten years by the Levelling-up and Regeneration Act 2023, so a use that would once have become lawful after four years may not, and transitional questions arise for uses that were already immune. Check the current position rather than working from an older note.

And the certificate defines what is lawful with some precision. A certificate for open storage does not authorise vehicle breaking, and applying for one in terms that overstate the operation tends to produce a refusal rather than a negotiation.

Intensification without a change of use

A yard can also change its planning position without changing what it does. A material intensification of an existing use is itself development, so a site storing 20 containers that grows to 400, with lorry movements to match, may need permission even though the description of the activity has not altered.

The test is whether the change in character is material, judged on the facts. Vehicle movements, hours, noise and visual prominence all feed into it. Operators rarely see this coming, because each increment feels small.

Conditions councils use on yards

Assume the permission will be conditioned tightly. The recurring list covers hours of operation, including deliveries, which is where most complaints originate. Maximum stacking heights, often expressed against a boundary treatment. Screening by fencing, bunds or planting, with a landscape scheme to be approved. A surfacing and drainage specification, since bare hardcore yards generate silt and dust. Wheel washing. A prohibition on burning, on processing and on the storage of specified materials. Lighting hours and spill limits.

The stacking height condition is the one most often breached and the easiest for an officer to check from the road.

Dust and noise evidence usually decides how tight those conditions are. Where housing is nearby, expect to be asked for an assessment of both, and to secure the mitigation by condition.

Getting the description right

The description of development on the application form determines what your permission authorises. Vague descriptions do not give you flexibility. They give an enforcement officer an argument.

Set out the operation precisely: what is stored, in what form, to what height, moved by what vehicles, over what hours, with what ancillary activity. If you want the ability to bale or sort later, apply for it now, because adding it afterwards is a fresh change of use.

A Planning Statement should tie that description to the development plan policies on employment land, amenity and, where relevant, waste. A Transport Statement covering vehicle numbers, types and manoeuvring within the site answers the highway authority's first question, which is always whether an articulated vehicle can turn without reversing onto the road.

One last practical point. If the yard has been operating in a way that exceeds the lawful use, take advice before applying, not after. An application that describes the current operation in full is also a written admission of the breach, and the sequencing of a certificate application and a planning application matters.

Enter the site postcode on PlanScope to see which documents an application for your yard is likely to need. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice. A lawful development certificate is the only formal way to confirm that a use is lawful, so check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

Does Class B8 cover storage in the open air?

Yes. Class B8 is use for storage or as a distribution centre, and nothing in the wording confines it to a building. An open yard stacked with pallets, steel or building materials is capable of being B8. Whether the particular operation stays inside the class depends on what happens to the material while it is there.

Which yards are named as sui generis in the Order?

Article 3(6) of the Use Classes Order places outside the classes a scrapyard, and a yard used for the storage or distribution of minerals or for the breaking of motor vehicles. Those uses therefore have no class at all, so any change into or out of them needs planning permission unless a permitted development right applies.

At what point does sorting become a B2 use?

When it amounts to an industrial process, meaning making, altering, repairing, adapting for sale, breaking up or demolishing articles, or treating minerals, in the course of trade. Baling, shredding, crushing and dismantling all fall the wrong side of that line. Moving material between vehicles and stacks does not.

Does an environmental permit make the use lawful?

No. An environmental permit from the Environment Agency and planning permission are separate consents with separate tests. Holding a permit does not authorise the use in planning terms, and planning permission does not remove the need for a permit. A yard handling waste will usually need both, plus a scrap metal dealer licence where metal is involved.

How do I prove the yard's existing use is lawful?

Apply for a certificate of lawfulness of existing use under section 191 of the Town and Country Planning Act 1990, supported by dated evidence such as aerial photography, invoices, sworn statements, accounts and tenancy documents. The enforcement time limit for breaches in England was extended to ten years by the Levelling-up and Regeneration Act 2023, so check the current position before relying on any earlier period.

Sources and further reading

use classesb8sui generisopen storagewastechange of use

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use7 min read

Co-living schemes and what use class they fall into

Large-scale purpose-built shared living fits no class in the Use Classes Order, so it is sui generis. That shapes room sizes, affordable housing contributions and the conditions on any consent.

Read article →
Use Classes and Change of Use7 min read

Trampoline parks and indoor leisure capacity

Indoor trampoline parks usually sit in Class E(d), so the planning risk moves to restrictive conditions, structure-borne impact noise and the occupancy figure the fire strategy allows.

Read article →
Use Classes and Change of Use7 min read

Crematoria and burial grounds: use class and consents

Neither a crematorium nor a burial ground falls within any use class, so both need planning permission. A crematorium also carries statutory separation distances and an emissions permit, and a burial ground needs a groundwater risk assessment.

Read article →
Use Classes and Change of Use6 min read

Sports and social clubs: Class F2 or sui generis?

A sports and social club can sit in Class F2 as a local community facility, or outside the use classes entirely if the bar becomes the main event. The distinction decides what you can change without permission.

Read article →
Use Classes and Change of Use6 min read

Film and television studios and the use class question

Film and television production is not named in the Use Classes Order, so a studio consent turns on how the primary use is described and how the planning unit is drawn. Sound stages, set workshops and production offices can each fall differently.

Read article →
Use Classes and Change of Use7 min read

Data centres: which use class applies

Classifying a data centre is a matter of fact and degree, and the answer rarely decides the scheme. Grid capacity and plant noise do.

Read article →