Planning Law Updates

Street votes: the power and what it would allow

7 min readBy PlanScope Editorial Team

Street vote development orders would let residents of a single street grant themselves planning permission for agreed forms of development, subject to examination and a referendum.

A street vote development order is a form of planning permission that residents of a single street could grant themselves, for development of a description they propose, after independent examination and a referendum of the people who live there. The power sits in the Levelling-up and Regeneration Act 2023, which inserts provisions into the Town and Country Planning Act 1990. Almost all of the detail, including who qualifies, how the vote works and what may be permitted, is left to regulations.

This explains the statutory scheme and where it sits alongside the tools that already exist. It is not a status report. Check the current commencement position and any regulations on gov.uk before acting on it.

Where the power comes from in the 2023 Act

The Act creates street vote development orders as a new category of development order, alongside the general permitted development order made nationally and the neighbourhood development orders that communities can already make.

The structure is deliberate. A general development order grants permission across the country. A local development order is made by the council. A neighbourhood development order is made through a neighbourhood forum or parish council across a designated area. A street vote development order would operate at the smallest scale of all, a single street or a group of streets, proposed by the people who live in it.

The Act sets out the framework: who may make a proposal, that it must be examined, that it must be approved in a referendum, and that regulations will set the conditions and requirements. It does not itself say what may be built.

What a street vote development order would permit

The order would grant planning permission for development of the description set out in it, within the street area it covers, subject to any conditions it imposes.

The intended use is well understood even though the detail is not fixed. The mechanism is aimed at incremental intensification of existing residential streets: additional storeys, deeper rear extensions, replacement of a house with a small block of flats, or the conversion of large houses, all to a pattern the street has agreed in advance.

What it would not do is override everything else. The Act contemplates prescribed development requirements and restrictions that constrain what an order can permit, and other consent regimes stay in place. Listed building consent, building regulations, the Party Wall etc. Act 1996, restrictive covenants and highway consents are unaffected by a development order of any kind.

For anyone reading this because their street is discussing one, that last point is worth holding onto. A permission is not a right to build something that another regime prohibits.

Who qualifies to propose and to vote

The Act frames both by reference to qualifying groups defined in regulations, so the precise answer is not available until those regulations exist.

The questions the regulations have to settle are the interesting ones. Whether the entitlement rests with residents, with owners, or with both, which matters a great deal in a street with many tenants. How the street area is defined and how far it can extend. What majority is required, and whether a turnout threshold applies. And whether owners of property that would be affected but who sit outside the defined area get any say.

Those choices decide whether the mechanism is used at all. A high threshold protects against a small group imposing change on neighbours. A low one makes orders achievable. Anyone who tells you where the line has been drawn should be able to point at the regulation.

The independent examination stage

A proposal would be examined by an independent examiner before it could go to a vote, which is the safeguard that distinguishes this from a simple neighbourhood ballot.

Examination in comparable processes tests whether the proposal meets prescribed conditions, whether it conflicts with policy it must comply with, and whether it would have unacceptable effects. The examiner can recommend modifications or recommend that the proposal does not proceed.

That stage is where design quality, amenity, heritage and highways issues would be tested by someone who does not live in the street. It is also where the cost sits, and how examinations are funded is one of the practical questions the regulations have to answer.

Design and amenity safeguards

The obvious risk in a street-level permission is the effect on the people next door and on the wider area, and the Act anticipates it by allowing requirements and restrictions to be prescribed.

Three sets of protections are likely to matter most in practice. Design parameters controlling height, depth, roof form and materials, so that what is permitted is a pattern rather than a free hand. Amenity standards covering daylight, sunlight, privacy and overlooking between neighbouring properties, which is exactly the ground on which householder applications are usually refused. And restrictions on where an order can apply, since designated areas such as conservation areas carry their own controls.

Where a street is considering what to propose, the evidence that would normally support a planning application is the evidence that makes a proposal examinable. A daylight and sunlight study of the pattern being proposed, tested on the tightest plot in the street, is more useful than an illustrative sketch of the best one.

Commencement position and regulations

The provisions come into force through commencement regulations, and the operative detail comes through further regulations. Both have to be checked rather than assumed, and this is an area where confident second-hand summaries age badly.

Two separate questions again. Are the provisions in force, and have the regulations that give them content been made. A power that exists but has no regulations behind it cannot be used.

The Act and its commencement information are on legislation.gov.uk, and consultations and government responses are published on gov.uk. The UK planning law updates timeline is a convenient place to follow reform news, though anything relied on in a formal context should be cited from the primary source.

What residents can and cannot do today

Waiting is not the only option, because tools that do much of the same work already exist and are in force.

A neighbourhood development order, made under the neighbourhood planning provisions of the 1990 Act, can grant planning permission for specified development in a designated neighbourhood area, following examination and a referendum. The process is longer and the area larger, but the effect is comparable and it is available now.

A neighbourhood plan can set design policies that carry statutory weight in decisions, including a design code for a particular street or character area. A local development order made by the council can do something similar from the other direction, and councils will sometimes make one where a group of residents brings a coherent proposal.

Residents can also engage with what is happening now rather than what might happen later. Responding to applications on their street, contributing to the local plan review, and taking part in the council's consultation on its design guidance all change outcomes today. A Statement of Community Involvement is the document in which an applicant records that engagement, and reading one tells you a great deal about how seriously a developer has taken it.

Illustrative example: a street of two-storey interwar semis wants to allow full width two-storey rear extensions and roof additions to a common pattern. Under a street vote order, that pattern would be proposed, examined and voted on. Today, the same outcome is pursued through a neighbourhood plan policy or a local development order, or one careful application at a time establishing a precedent the council is willing to follow.

This is general guidance, not legal advice, and the position on commencement and regulations may have changed since it was written. Check the current legislation and speak to your local planning authority or a qualified professional before relying on it.

Whatever route a street takes, the supporting evidence is much the same. Browse the report types by category to see what a residential proposal usually needs.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is a street vote development order?

A form of planning permission proposed by residents of a single street or group of streets, tested by an independent examiner and then approved in a referendum of qualifying voters. The power comes from the Levelling-up and Regeneration Act 2023, which inserts provisions into the Town and Country Planning Act 1990, with the detail left to regulations.

Could a street vote force my neighbours to build?

No. A development order grants permission for development of a described kind. It permits, it does not compel. Individual owners would still decide whether to build, and they would still need building regulations approval, party wall agreements and any other consents that apply to their property.

Who would be allowed to vote?

That is left to regulations, which have to settle whether the entitlement rests with residents, owners or both, how the street area is defined, and what majority or turnout is needed. Those choices decide whether the mechanism is usable, so anyone stating the threshold should be able to point at the regulation.

Would conservation areas be affected?

The Act allows requirements and restrictions to be prescribed, and designated areas carry their own separate controls in any event. Listed building consent, conservation area consent requirements and the duties that apply to designated heritage assets are not displaced by a development order, whatever it permits for ordinary development.

What can residents do while this is unresolved?

Use the tools already in force. A neighbourhood development order can grant permission for specified development in a designated area after examination and a referendum. A neighbourhood plan can set design policies with statutory weight, and a council can make a local development order. All three are available now.

Sources and further reading

street voteslevelling up actneighbourhood planningdevelopment orderscommunityplanning reform

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates7 min read

Grey belt and the golden rules for Green Belt release

The grey belt route gives a development management answer where a plan has not kept up, conditional on golden rules covering affordable housing, infrastructure and public green space.

Read article →
Planning Law Updates7 min read

Section 73B and the limits on amending a permission

Section 73B was inserted to fill the gap left between non-material amendments and condition variations. It does not solve the Hillside problem, and its commencement needs checking.

Read article →
Planning Law Updates8 min read

Upward extensions under Part 20 and the prior approval tests

Part 20 grants the principle of adding storeys and then gives the authority a long list of prior approval matters. Daylight, amenity and external appearance are where these applications are won or lost.

Read article →
Planning Law Updates8 min read

Use Classes Order 2020: what a condition still restricts

The 2020 amendment revoked the old classes but removed no conditions. A permission restricting a unit to Class A1 and no other purpose still binds, and the ways out are a section 73 application or a certificate.

Read article →
Planning Law Updates8 min read

Securing biodiversity gain for thirty years

The thirty year securing arrangement outlives the development and has to survive the land changing hands. Section 106 and conservation covenants behave differently, and the choice matters.

Read article →
Planning Law Updates8 min read

The statutory biodiversity metric and the small sites version

The small sites metric is a simpler calculator, not a lower standard. The eligibility conditions disqualify more sites than self-builders expect, and the hedgerow account is where plots fail.

Read article →