Glossary

Sui generis use: what falls outside the Use Classes Order

7 min readBy PlanScope Editorial Team

Pubs, hot food takeaways, nightclubs and petrol stations sit outside every class of the Use Classes Order. That means no class freedom, almost no permitted development, and an application for nearly every change.

A sui generis use is one that does not sit in any class of the Town and Country Planning (Use Classes) Order 1987. The Latin means "of its own kind", and the planning consequence is blunt: because the use has no class, there is no class to move around within, and almost every change into or out of it needs planning permission.

That single feature is why sui generis status matters so much to a business. A pub, a hot food takeaway, a nightclub, a petrol filling station and a taxi office are all sui generis, and none of them can become anything else without an application. If you are buying a lease on one of them, the flexibility you think you are getting may not exist.

What it means for a use to fall outside the Order

Section 55(2)(f) of the Town and Country Planning Act 1990, read with article 3(1) of the Use Classes Order, provides that a change of use within the same class is not development. That is the whole benefit of being in a class. A shop can become a gym, a nursery, a dental practice or an office because all of those sit in Class E, and moving between them is not development at all.

A sui generis use gets none of that. Every material change of use to or from it is development, and development needs permission unless a specific permitted development right says otherwise.

The 2020 amendments made this more consequential than it used to be. The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 took effect on 1 September 2020, collapsed the old A1, A2, A3, B1 and D1 uses into the new Classes E, F1 and F2, and pushed several formerly classified uses out into sui generis. Premises lawfully used as a pub on 31 August 2020 did not stay in a class. They became sui generis the next day.

The uses expressly made sui generis

Article 3(6) of the Order names uses that are excluded from every class. The list includes:

  • Drinking establishments, and drinking establishments with expanded food provision.
  • Hot food takeaways, meaning the sale of hot food principally for consumption off the premises.
  • Cinemas, concert halls, bingo halls and dance halls.
  • Live music venues.
  • Theatres, nightclubs, casinos and betting offices.
  • Amusement arcades and centres, and funfairs.
  • Launderettes.
  • Petrol filling stations, and the sale or display of motor vehicles.
  • Taxi businesses and the hire of motor vehicles.
  • Scrap yards, and yards for the storage or distribution of minerals or the breaking of motor vehicles.
  • Hostels.
  • Waste disposal installations, retail warehouse clubs, and alkali works.

Read the current consolidated text before relying on any list, including this one, because article 3(6) has been amended repeatedly and the position on 1 September 2020 differs from the position before it.

Uses that are sui generis by omission

The second route into sui generis status is quieter. A use that no class describes is sui generis whether or not anyone has named it, and new business models arrive faster than the Order is amended.

A vehicle hand car wash on a former forecourt, a dog day care operation, a builders' yard that is neither general industrial nor pure storage, a livery yard, a crematorium, a self-storage site with trade counter activity: each of these has to be assessed against the class definitions on its facts, and each can end up outside them.

The test is what the actual activity is, not what the business calls itself. A "café" that sells predominantly hot food for consumption off the premises is a hot food takeaway. A "studio" whose activity is retail is Class E(a). Councils look at floor area splits, staffing, opening hours, seating and turnover, and they are entitled to.

Where the classification is arguable, the way to settle it is a Lawful Development Certificate under section 191 or 192 of the Town and Country Planning Act 1990, which produces a determination rather than an opinion.

Why there are no change of use rights

The permitted development rights in Part 3 of Schedule 2 to the GPDO 2015 are drafted class by class, and the general pattern grants movement out of classified uses rather than out of sui generis ones.

There are targeted exceptions. Part 3 contains specific rights allowing certain named sui generis uses, including betting offices, pay day loan shops, launderettes and hot food takeaways, to change to residential use subject to prior approval. Those are narrow grants with their own conditions and limitations, and they do not create a general freedom. Check the exact class text for the use you have, because a right that exists for a betting office does not exist for a nightclub.

Going the other way is even tighter. Moving from a use class into a sui generis use is always a material change of use requiring permission: Class E restaurant to hot food takeaway, Class E retail to drinking establishment, Class F1 hall to nightclub. No exceptions worth planning around.

Moving from sui generis into a use class

This is the change most operators want, usually because a pub or a takeaway is being converted to something with better trading prospects.

It is an ordinary planning application, and it is judged against the development plan. Three policy themes decide most of them, and they are set out in the adopted policies you can identify through the development plan:

  1. Protection of the existing use. Many authorities have policies resisting the loss of public houses, community facilities and cultural venues, often requiring marketing evidence over a stated period before a change is acceptable.
  2. The acceptability of what replaces it, on parking, servicing, amenity and town centre policy.
  3. Any heritage or character constraint attaching to the building, which is common for public houses.

The supporting documents follow from those themes rather than from the building. Marketing evidence, a viability position, amenity information and a policy assessment usually do more work than drawings. PlanScope can draft the supporting documents for that application, structured to the policies in the adopted plan, for review before submission.

Conditions that tie a permission to one use

A permission for a sui generis use frequently carries a condition restricting occupation to that use and nothing else. Where the condition is clearly worded, it can exclude reliance on rights that the Order or the GPDO would otherwise give, and the courts have required clear words before accepting that effect.

Read the condition literally. A condition permitting use "as a hot food takeaway only" prevents a change to a restaurant without a further application. A condition requiring the premises to be used "for purposes within Class E and for no other purpose" removes the class freedom entirely.

Varying such a condition is a section 73 application, not a non-material amendment, because the change alters what is permitted. The limits of the lighter-touch route are set out in section 96A non-material amendments.

An illustrative takeaway and drinking establishment

This example is illustrative. A unit in a small parade has been a sandwich shop for years, sitting comfortably in Class E(b). The operator wants to fit a fryer and extraction and trade until 11pm selling hot food to take away.

That is a change from Class E to a sui generis hot food takeaway and needs planning permission. The application will turn on odour control, noise from the extraction plant and from customers, litter, parking and opening hours, with a ventilation and extraction scheme and often an odour assessment forming the technical core.

Next door, a closed pub is sui generis in its own right. Turning it into a shop or a gym is also a change of use application, and in many districts the adopted plan requires marketing evidence over a defined period before the loss of the public house is accepted. Neither unit can move sideways into the other's use without applying.

Sui generis is not a penalty. It is simply the absence of a shortcut, and the earlier in a deal it is identified the less it costs to resolve.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Enter your postcode on PlanScope to see which reports a change of use application on your premises is likely to need.

Frequently asked questions

What does sui generis mean in planning?

It means a use that falls into no class of the Town and Country Planning (Use Classes) Order 1987. Because changes within a class are not development, a use with no class has no such freedom. Almost every material change of use into or out of a sui generis use needs planning permission.

Which uses are expressly sui generis?

Article 3(6) of the Order names them, including drinking establishments, hot food takeaways, cinemas, concert halls, bingo halls, dance halls, live music venues, theatres, nightclubs, casinos, betting offices, amusement arcades, launderettes, petrol filling stations, motor vehicle sales, taxi businesses, scrap yards, hostels and waste disposal installations.

Did the 2020 changes move uses into sui generis?

Yes. The Town and Country Planning (Use Classes) (Amendment) (England) Regulations 2020 took effect on 1 September 2020 and moved pubs, hot food takeaways, cinemas, concert halls, bingo halls, dance halls and live music venues out of the old classes into sui generis, while creating Classes E, F1 and F2.

Can I change from a takeaway to a restaurant without permission?

No. A hot food takeaway is sui generis and a restaurant sits in Class E, so the change is a material change of use requiring planning permission. Check the original permission too, because conditions restricting the premises to a named use are common and would need a section 73 application to vary.

How is a disputed classification settled?

Apply for a Lawful Development Certificate under section 191 for an existing use or section 192 for a proposed one. That produces a formal determination from the council rather than an opinion. Councils assess what the activity actually is, looking at floor area splits, staffing, hours, seating and the balance of trade.

Sources and further reading

sui generisuse classeschange of usetakeawayglossarycommercial

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Glossary

View all →
Glossary6 min read

Prior approval: the application that is not quite one

The permission already exists. A prior approval application only determines the matters the class lists, which is both the attraction of the route and its main trap.

Read article →
Glossary6 min read

Planning obligation: when a contribution may be required

Regulation 122 sets three statutory tests for any planning obligation. The most useful question in a contributions negotiation is which limb a given ask satisfies.

Read article →
Glossary7 min read

Section 73 application: varying a condition in practice

Section 73 lets you vary conditions on a permission you already hold, but it cannot touch the description of development and it will not buy you more time.

Read article →
Glossary7 min read

Certificate of lawfulness for a proposed use or operation

Section 192 asks whether a proposed use or operation would be lawful, not whether it would be acceptable. The authority has no discretion to refuse on the merits, and the onus of proof is on the applicant.

Read article →
Glossary7 min read

Stop notice and the compensation risk it carries

Section 183 allows a stop notice only where an enforcement notice has been issued. Section 186 then pays compensation if that notice is quashed on any ground other than the planning merits.

Read article →
Glossary7 min read

Enforcement notice: what it must specify to be effective

Section 173 of the Town and Country Planning Act 1990 fixes what an enforcement notice must say. Where the drafting fails, the notice may be a nullity rather than merely invalid, and that changes what you do next.

Read article →