Use Classes and Change of Use

Nail bars, tattoo studios and the Class E boundary

6 min readBy PlanScope Editorial Team

Salons and nail bars are Class E uses and can change freely within the class. Tattoo and piercing studios are less settled, and old A1 conditions still bite.

The tattoo studio use class question has no tidy answer, and anyone who tells you otherwise has not read the Use Classes Order carefully. Nail bars, beauty salons and hairdressers sit comfortably within Class E after the 2020 amendments. Tattoo and piercing studios sit at the edge of it, and the safe course is to get the position confirmed in writing by the local planning authority before signing a lease.

That distinction is worth money. A use inside Class E can change to another Class E use without planning permission at all, because movement within a class is not development. A use outside the classes needs a full application every time it changes.

Which personal services sit in Class E

Class E of the Town and Country Planning (Use Classes) Order 1987, as amended in September 2020, gathers together most of what used to be spread across the old A1, A2, A3, B1, D1 and D2 classes. The part that matters for personal services is Class E(c), which covers financial services, professional services other than health or medical services, and any other services appropriate to provide in a commercial, business or service locality.

Hairdressing was expressly within the old retail class and is now within Class E. Nail bars, beauty treatment rooms, waxing and massage studios, barbers and dry cleaning shop fronts are all normally treated the same way. Health and medical services, including a physiotherapist or a dental practice, fall into Class E(e) instead, which is still within Class E and so still interchangeable.

The practical effect is large. A vacant hairdresser can become a nail bar, a beauty salon, a small office, a physiotherapy clinic or a day nursery without an application, provided nothing else bites.

Where a use falls outside the class

Four things pull a personal service use out of Class E.

Body modification that goes beyond conventional beauty treatment is the first and least settled. Some authorities treat tattooing and body piercing as within Class E(c)(iii) on the basis that it is a service appropriate to a shopping street. Others treat it as sui generis, arguing that the character of the use, its hours, its clientele and its waste stream take it outside what the class contemplates. Appeal decisions point in both directions, and they are indicative of how inspectors have approached the question rather than binding.

The second is a condition on an earlier permission. Where a unit was granted permission subject to a condition restricting it to retail use under the old Class A1, that condition continues to control the unit even though A1 no longer exists. Changing to a nail bar then needs an application under section 73 to vary or remove the condition, whatever the Use Classes Order now says. Check the planning history of the unit as well as its current use.

Third, anything ancillary that becomes material. A beauty salon that starts selling hot food, opens as a bar in the evening or lets a room for overnight stays has introduced a use outside the class.

Fourth, an authority may argue that the use is not appropriate in a commercial, business or service locality at all. That argument is rarely run against a nail bar on a high street. It has more force in a residential conversion.

If the position is uncertain, the honest options are a written confirmation from the authority, or a certificate of lawfulness of proposed use under section 192 of the Town and Country Planning Act 1990, which is the only formal way to settle it. A Planning Statement setting out the use, the hours, the staff numbers and the planning history does most of the work in either route.

Ventilation and extraction requirements

Nail bars are the reason environmental health officers get involved in what looks like a simple shop fit-out. Acrylic systems and solvent-based products release vapours that need local extract ventilation at each workstation, not a single extract grille at the back of the room, and the Health and Safety Executive treats nail bar exposure control as a workplace issue under the COSHH regime independently of planning.

Where the extract discharges to open air through a wall or roof, the discharge point and its effect on neighbours becomes a planning matter. On a unit with flats above, expect a request for a Ventilation and Extraction Statement covering the system design, the extract rate, the termination height and position, filtration, and odour and noise from the fan. Get the mechanical design done before the application drawings are finalised, because a duct route added later usually needs a different elevation.

The same applies to any salon using chemical treatments, and to tattoo studios where autoclave and sterilisation areas need dedicated ventilation.

Registration and licensing as parallel regimes

Planning permission does not make a studio lawful to operate. Tattooing, cosmetic piercing, electrolysis and acupuncture require registration of both the premises and the practitioner with the local authority under the Local Government (Miscellaneous Provisions) Act 1982. In London, special treatment premises are licensed under separate London legislation and the standards are more demanding, covering room finishes, wash hand basins, sharps handling and record keeping.

Two consequences follow for the planning application. The layout you submit will be inspected against the registration standards, so draw the wash hand basin, the sluice, the sharps store and the separation between treatment and waiting areas properly. And the registration officer's requirements can force a layout change that alters the planning drawings, so run the two processes in parallel rather than in sequence.

Hours, frontage and the character of the area

Local plans commonly protect primary shopping frontages by controlling the proportion of non-retail uses within a defined frontage, and they commonly ask for active frontages at ground floor level. Since most personal service uses are now within Class E, those policies bite only where planning permission is actually needed, for example a change from a sui generis use, a first floor conversion or a new shopfront.

Where an application is needed, the points officers raise are consistent. Opening hours, particularly late evening trading. The treatment of the shopfront, including whether windows are to be obscured with vinyl film, which authorities in conservation areas resist. Plant noise from extract fans and air conditioning condensers, which usually needs a Noise Impact Assessment where there is residential accommodation above or behind.

Waste is the quiet one. A tattoo or piercing studio generates clinical and sharps waste that has to be stored securely and collected by a registered carrier under the duty of care in the Environmental Protection Act 1990. Show the storage location on the plan.

Evidence for the application

Where an application is needed, keep the pack short and specific. Existing and proposed floor plans with room uses labelled, elevations showing any new extract termination or shopfront alteration, a mechanical ventilation schematic with extract rates, a short noise assessment for external plant, a statement of hours and staff numbers, and a waste storage and collection arrangement.

Describe the use precisely on the form. A description reading change of use to beauty salon and tattoo studio invites a condition restricting the mix. A description naming only the element you need may be the better course, though it must be accurate.

For the wider question of which uses sit outside the classes altogether, the note on sui generis uses covers the ground, and where a unit is being split the tests are set out in the note on subdividing a commercial unit.

This is general guidance, not legal advice; check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Is a tattoo studio within Class E?

The position is not settled. Some authorities treat tattooing and body piercing as a service within Class E(c)(iii), while others treat it as sui generis because of the character, hours and waste stream of the use. Appeal decisions point both ways. Get written confirmation from the authority, or apply for a certificate of lawfulness of proposed use under section 192.

Can a hairdresser become a nail bar without permission?

Normally yes, because both are treated as falling within Class E and movement within a use class is not development. Two things can stop it: a condition on an earlier permission restricting the unit to a particular use, and any physical works such as a new extract flue or shopfront alteration that need permission in their own right.

Does an Article 4 direction stop a change within Class E?

No. An Article 4 direction removes permitted development rights, and a change within a use class is not development at all, so there is nothing for the direction to remove. Article 4 directions matter for changes that rely on Schedule 2 of the GPDO, such as Class MA conversions from commercial to residential use.

What ventilation does a nail bar need?

Local extract ventilation at each workstation rather than a single grille at the back of the room, because acrylic and solvent based products release vapours controlled under the COSHH regime. Where the extract discharges through a wall or roof, the termination point, filtration and fan noise become planning matters, particularly with flats above.

Do I need a licence as well as planning permission?

Yes for tattooing, cosmetic piercing, electrolysis and acupuncture. Premises and practitioners are registered with the local authority under the Local Government (Miscellaneous Provisions) Act 1982, and in London special treatment premises are licensed under separate London legislation with more demanding standards for finishes, basins and sharps handling.

Sources and further reading

use classesclass echange of usetattoo studionail barventilationcommercial occupiers

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Use Classes and Change of Use

View all →
Use Classes and Change of Use8 min read

Betting shops, payday lenders and amusement arcades

Betting offices, pay day loan shops and amusement arcades sit outside the use classes, so there is no permitted change into them and no fallback use to rely on.

Read article →
Use Classes and Change of Use6 min read

Padel and outdoor sport: consents and conditions

The use class is the easy part. How padel noise is assessed when there is no national method, what the lighting limits require, and when Sport England is consulted.

Read article →
Use Classes and Change of Use6 min read

Self-storage and the limits of Class B8

Self-storage sits within Class B8, but ancillary sales, trade counters and processing all test the edge of the class. Where the line falls and how it is conditioned.

Read article →
Use Classes and Change of Use7 min read

Dog day care and boarding: which consents you need

Day care and boarding sit outside the Use Classes Order, so the change of use always needs permission. Barking decides the case, and welfare licensing is a separate consent.

Read article →
Use Classes and Change of Use8 min read

Live-work units and how councils classify them

A live-work unit is a composite use, not a use class. That is why permission is needed, why the conditions are tight, and why councils worry about the work element disappearing.

Read article →
Use Classes and Change of Use7 min read

Merging two dwellings and the loss of a unit

Combining two dwellings into one is not automatically a change of use. Whether permission is needed turns on local housing retention policy and the evidence you bring.

Read article →