Permitted Development

Temporary campsites under Part 4 Class BB

6 min readBy PlanScope Editorial Team

Class BB of Part 4 allows a temporary recreational campsite subject to prior approval. The day and pitch limits, the excluded land, what the council assesses and the licensing that runs alongside.

Class BB of Part 4 of the General Permitted Development Order 2015 allows land to be used as a recreational campsite for a limited number of days each calendar year, subject to prior approval from the local planning authority. Temporary campsite permitted development is therefore a two step process: the right exists, and the council still gets to look at siting, access, flooding and the effect on the area before the first tent goes up.

For a farm looking at diversification, it is a way to test demand before committing to a full application. It is not a shortcut to a permanent site, and authorities treat repeated use of the right on the same field as a signal to look harder.

What the class permits

The right covers the use of land for a recreational campsite for a capped number of days in a calendar year, together with moveable structures needed for that use. The cap on days and the cap on pitches are both set out in the class, along with a list of land that is excluded from the right.

Three points need checking against the current text of the Order rather than any summary, because the class has been amended since it was introduced:

  1. The number of days permitted in a calendar year and how those days are counted.
  2. How the right interacts with the separate temporary use right in Class B of the same Part, which covers other temporary uses.
  3. The maximum number of pitches and what counts as a pitch.

Read the class itself. It is short, and getting the day count wrong is the single most common route to an enforcement problem on these sites.

Land that is excluded

The right does not apply everywhere. The Order lists categories of land where the class cannot be used, which include land with particular environmental or heritage designations and land subject to safety-related constraints.

Check the site against the designation datasets before relying on the class. A field that touches a Site of Special Scientific Interest, sits within the curtilage of a listed building, or falls inside a safeguarded area may be outside the right entirely, and using it anyway is a breach rather than a technicality.

Where the land is in a designated landscape, check whether the class applies at all in that setting, and expect the authority to take a closer look at the prior approval if it does.

Prior approval and what the council assesses

Prior approval is a formal application with a fee, a plan and a description. The authority considers the matters the class specifies, which cover siting and, in broad terms, transport and highways, the risk of flooding and the effect on the surrounding area.

What that means in practice:

  • Access. A field gate onto a national speed limit road with no visibility splay is the most common reason for refusal. The authority will look at visibility in both directions, the geometry of the entrance, whether two vehicles can pass, and whether cars will queue on the carriageway. A Transport Statement is rarely required at this scale, though a visibility drawing usually is.
  • Flooding. A riverside meadow is an attractive campsite and a poor one. Where the land sits in Flood Zone 2 or 3, expect questions about warning and evacuation, and be ready to show that the camping season avoids the highest risk period or that a flood plan exists.
  • Siting. Distance from dwellings, screening, the position of vehicles and the visual effect of tents and toilets on a skyline.

Submit more than the minimum. A short covering statement with a site plan showing pitch positions, parking, the toilet block, the water point and the access arrangement converts a sceptical officer faster than any amount of policy argument.

Neighbours are consulted on prior approval applications and their concerns are predictable: noise late at night, headlights sweeping a bedroom window, dogs, and cars parked on the lane. Answering those in the covering statement, with a site management approach covering quiet hours, a no-arrivals-after-dark rule and parking on the pitch, removes most of the objection before it is written.

Amenity is also where the difference between a field with tents and a commercial operation becomes visible. Bell tents on wooden platforms, a shower block and lighting look permanent, and an officer may reasonably ask whether the use is temporary at all or whether a permanent structure is being installed under cover of the class. Keep everything moveable and keep the photographic record, dated, of the land before and after each season.

Licensing alongside planning

Planning permission and site licensing are separate regimes, and the class deals only with planning.

Campsites can be subject to licensing controls administered by the council, and the position differs for tents, caravans and motorhomes, with exemptions for certain organisations and for short-duration use. Speak to the licensing team at the same time as the planning team. Food, alcohol and entertainment each bring their own licensing if they are part of the offer.

Fire safety matters too. Spacing between units, access for an appliance, and extinguisher provision are the basics, and the local fire and rescue service will give guidance on a small site without charge.

Water, waste and drainage

A campsite generates foul waste, greywater and refuse, and the prior approval will not deal with any of it in detail. Sort it out anyway.

Chemical toilets need a disposal point connected to foul drainage or emptied under a contract. Where the site uses a septic tank or package treatment plant, the discharge is subject to the general binding rules or a permit depending on volume and location, and a seasonal peak load is exactly the condition that overwhelms a domestic-scale system. Potable water drawn from a private supply is regulated under the private water supply regime and needs testing.

Where any of this needs to be evidenced for a subsequent application, a Foul Sewage Assessment sets out the arrangements formally.

Moving to a permanent permission

The temporary right is a trial. If it works, the next step is a full planning application for a permanent campsite or holiday use, and that application is assessed on its merits against countryside and tourism policy.

Use the trial period to gather what the application will need:

  • Vehicle counts and arrival patterns through the season.
  • Photographs from public vantage points with tents in place, which are far more persuasive than a wireline drawing.
  • A record of any complaints and how they were handled.
  • Ecology observations that inform the scope of a Preliminary Ecological Appraisal.

That evidence turns a speculative application into a documented one. And keep the day count records, because an authority assessing a permanent application will look at how the temporary right was used.

Before applying, work out the document list for the permanent scheme: enter your postcode on PlanScope to see which reports the site is likely to need.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

Frequently asked questions

How many days can a Class BB campsite operate?

The class caps the number of days in a calendar year and sets out how they are counted, including how the right interacts with the separate temporary use right in Class B of the same Part. Read the current text of the Order rather than a summary, because the class has been amended and the day count is where sites get into trouble.

Does a temporary campsite need prior approval?

Yes. The right is conditional on applying to the local planning authority for prior approval, which is a formal application with a fee and a plan. The authority considers the matters the class specifies, covering siting and, in broad terms, transport and highways, flood risk and the effect on the surrounding area.

Can I use Class BB on any field?

No. The Order excludes categories of land from the right, including land with certain environmental and heritage designations and land subject to safety-related constraints. Check the site against the designation datasets first, because using excluded land is a breach of planning control rather than a technical oversight.

Do I need a site licence as well as prior approval?

Licensing is a separate regime administered by the council, and the position differs between tents, caravans and motorhomes, with exemptions for certain organisations and short duration use. Speak to the licensing team alongside the planning team. Food, alcohol and entertainment each bring their own licensing requirements if offered.

What is the most common reason prior approval is refused?

Access. A field gate onto a fast road without adequate visibility in both directions, without room for two vehicles to pass, or where cars would queue on the carriageway, is the usual sticking point. Submit a visibility drawing and a plan showing parking, the toilet point and the water point rather than the bare minimum.

Sources and further reading

campsitepermitted developmentprior approvalfarm diversificationrural planning

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Permitted Development

View all →
Permitted Development6 min read

The three year deadline on a prior approval

A planning permission must be begun within three years. A Part 3 prior approval must be completed within three years of the prior approval date, and the condition sits in the Order where nobody can vary it.

Read article →
Permitted Development7 min read

Class M: betting shops and takeaways to homes

Class M turns a small shop, betting office or hot food takeaway into a dwellinghouse through prior approval. The 150 m2 floorspace cap and the 20 March 2013 qualifying use date decide most cases before design begins.

Read article →
Permitted Development8 min read

Class L and moving between C3 and C4 use

Class L permits a dwellinghouse to become a small house in multiple occupation and back again, with no application. The limits are the household test, the six-resident ceiling and the Article 4 directions that withdraw the right.

Read article →
Permitted Development8 min read

Industrial and warehouse extensions under Part 7

Part 7 Class H lets an occupier extend an industrial building or warehouse without an application, within limits that are tighter than they look. This covers the allowance, the boundary condition and the new process restriction.

Read article →
Permitted Development7 min read

Bat roosts and roof works under permitted development

A re-roof or loft conversion needs no planning application, so nothing prompts an ecology check. This sets out when to commission a roost assessment, the survey seasons that control the programme, and who is liable.

Read article →
Permitted Development7 min read

Protected trees and permitted development on the same site

Permitted development grants planning permission for the building work, not consent to touch a protected tree. This covers the consent routes, the root protection trap in foundation design, and how to sequence the two.

Read article →