Planning Law Updates

The ten year enforcement limit and what it covers

6 min readBy PlanScope Editorial Team

The Levelling-up and Regeneration Act 2023 replaced the four year enforcement limit in England with a single ten year period. Which breaches it affects, how the transitional rule works and what evidence establishes immunity.

England now has a single ten year enforcement time limit for almost every planning breach. The old four year rule, which gave operational development and the change of use of a building to a single dwellinghouse immunity after four years, has gone for breaches that happened on or after 25 April 2024. For landlords and investors who bought on the basis that an unauthorised conversion would become immune in four years, the arithmetic has changed. This explainer is current as at 9 October 2026, and the commencement position should be confirmed on legislation.gov.uk before you rely on it.

What the limits used to be

Section 171B of the Town and Country Planning Act 1990 has always set the clock. Before the change it ran three different periods.

Four years for operational development, running from the date the building, engineering, mining or other operations were substantially completed. Four years for a change of use of a building to use as a single dwellinghouse, running from the date of the breach. Ten years for any other breach, which covered all other changes of use and the breach of a condition or limitation.

That split created the pattern everyone in the sector knew. A rear extension built without permission was beyond enforcement after four years. An office converted to flats without permission took ten, because it was a change of use to multiple dwellings rather than to a single one. A single flat carved out of a house took four.

The change Part 3 of the 2023 Act makes

Part 3 of the Levelling-up and Regeneration Act 2023 amended section 171B so that the time limit for taking enforcement action in England is ten years in every case. The four year periods were removed rather than extended in stages.

The amendment applies in England only. Wales retains the earlier structure, so a Welsh property is assessed under the four and ten year periods and anyone advising across the border needs to check which regime applies, with Planning Policy Wales as the policy context.

Nothing else about enforcement changed with it. The council still has a discretion whether to act, the expediency test still applies, and the remedies, enforcement notices, breach of condition notices, stop notices and injunctions, are unchanged.

Which breaches the ten year limit now covers

Breach Old limit Limit for breaches on or after 25 April 2024
Unauthorised extension, outbuilding, dormer or hardstanding 4 years from substantial completion 10 years from substantial completion
House converted to a single flat or annexe treated as a separate dwelling 4 years from the breach 10 years from the breach
House in multiple occupation beyond a C4 or sui generis threshold 10 years 10 years
Commercial building converted to several flats 10 years 10 years
Breach of a planning condition 10 years 10 years

Two things sit outside the regime entirely and are worth stating plainly, because owners assume otherwise. Unauthorised works to a listed building never become immune through the passage of time, and carrying them out is a criminal offence under the Planning (Listed Buildings and Conservation Areas) Act 1990. Works in breach of a Tree Preservation Order are likewise an offence rather than a matter of immunity.

Works completed before the change

The transitional position is the part that gets misread. The old four year limits continue to apply to breaches that occurred before 25 April 2024, so immunity already accrued or already running on that date is not reopened.

Read that carefully. A single flat created in 2021 was already within four years of the breach on 25 April 2024, so it reached immunity in 2025 under the old limit. A flat created in May 2024 will not be immune until 2034.

The practical consequence for anyone buying converted stock is that the date of the breach, not the date of purchase or the date of discovery, decides which regime applies. Where the evidence puts the date close to April 2024, the difference between the two answers is six years of exposure.

Proving the date works were substantially completed

Immunity is a matter of evidence and the burden falls on the owner. Substantial completion is judged on the building as a whole, not on the last cosmetic item, and a scheme left unfinished to delay the clock does not start it.

What persuades an officer or an inspector:

  1. Dated invoices from builders, scaffolders, skip hire and material suppliers, ideally with the site address on them.
  2. Bank statements or card records matching those invoices, which are much harder to challenge than the invoices alone.
  3. Council tax records, utility accounts, tenancy agreements and electoral roll entries for a new unit, each showing a start date.
  4. Dated photographs with metadata intact, and aerial imagery where the date of capture is published.
  5. A statutory declaration from the owner, and ideally from the builder, setting out the sequence with dates.
  6. Building control records or a completion certificate, if one was sought.

Patchy evidence is the normal reason these cases fail. One invoice and a recollection will not carry a ten year period, and the longer period means the paperwork has to survive longer, which is a genuine problem now rather than a theoretical one. Keep the file with the deeds. The permitted development limits that might have covered the works in the first place are worth checking too, as our note on air source heat pumps and permitted development limits shows for one small class.

Effect on certificates of lawfulness

A certificate under section 191 of the 1990 Act is how immunity is turned into something a lender or buyer will accept. The test the council applies is whether, on the balance of probabilities, the use or works have become immune from enforcement, which means the applicant must now show ten years of continuous unauthorised use or ten years since substantial completion.

For continuing uses, the ten years must be unbroken and run up to the date of the application. A gap, a period of genuine vacancy, or a reversion to the lawful use resets it.

Councils are entitled to refuse where the evidence is thin and to grant a certificate in narrower terms than were applied for. Both happen. If you are applying on the strength of an old conversion, decide before you submit whether the weakest link in the chain of evidence will hold, because a refusal is a public record that a purchaser's solicitor will find.

What this means when you buy or sell

Indemnity insurance against enforcement action usually prices on the remaining exposure period. A longer limit means a longer exposure, and insurers have adjusted accordingly, so the cost and the availability of cover for recent unauthorised works are not what they were.

For sellers the sequence is unchanged but the timing is slower. Establish the date of the breach, assemble the evidence while the people who did the work are still contactable, and apply for the certificate before marketing rather than during a transaction.

For buyers the question to put to a seller is specific. Not "is this lawful" but "on what date was this substantially completed, and what documents prove it".

Reform news on enforcement and the rest of the 2023 Act is tracked on the UK planning law timeline, and the plan-making changes running alongside it are covered in our piece on plan making reform and emerging plans.

If the answer is that an application is needed after all, enter your postcode on PlanScope to see which reports the site is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

Does the ten year limit apply to works finished before April 2024?

No. The four year limits continue to apply to breaches that occurred before 25 April 2024, so immunity that had already accrued or was already running on that date is unaffected. The date the operations were substantially completed, or the date the change of use happened, decides which regime applies, not the date you bought the property.

Is the four year rule still in force in Wales?

Yes. The amendment was made for England only, so Welsh breaches are still assessed under the four year periods for operational development and change of use to a single dwellinghouse, and ten years for other breaches. Anyone advising on a Welsh site should check the Welsh position and Planning Policy Wales rather than applying the English rule.

Do unauthorised works to a listed building ever become immune?

No. The enforcement time limits in section 171B do not give immunity for works to a listed building, and carrying out such works without listed building consent is a criminal offence under the Planning (Listed Buildings and Conservation Areas) Act 1990. Length of time may affect whether a council prosecutes, but it does not make the works lawful.

What counts as substantial completion for the clock?

The building is judged as a whole rather than by the last item of finishing work, and a scheme deliberately left incomplete does not postpone the start. Dated invoices, matching bank records, utility and council tax accounts and dated photographs are the evidence that carries it. A recollection without documents rarely succeeds over ten years.

Can I still get a certificate for an old conversion?

Yes, under section 191 of the Town and Country Planning Act 1990, provided you can show on the balance of probabilities that the relevant period has passed. For a continuing use the period must be unbroken and must run up to the date of the application. A council can grant a certificate in narrower terms than applied for, or refuse where the evidence has gaps.

Sources and further reading

enforcementimmunitylevelling-up and regeneration actlawful development certificateplanning law

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Planning Law Updates

View all →
Planning Law Updates7 min read

Infrastructure funding statements and what they report

The annual infrastructure funding statement is the only published document that shows what a council collected from developers and what it spent. Here is how to read one.

Read article →
Planning Law Updates7 min read

Grey belt and the Green Belt sequence in policy

Grey belt removes the very special circumstances test for land that does not strongly contribute to three of the five Green Belt purposes. The definition, the sequence and the conditions attached.

Read article →
Planning Law Updates6 min read

Higher-risk buildings: height and storey definitions

The 18 metre and seven storey tests are measured in a specific way, and planning Gateway One uses a different definition from the construction and occupation regimes. How to scope a borderline building.

Read article →
Planning Law Updates7 min read

Grey belt and the golden rules for Green Belt release

The grey belt route gives a development management answer where a plan has not kept up, conditional on golden rules covering affordable housing, infrastructure and public green space.

Read article →
Planning Law Updates7 min read

Section 73B and the limits on amending a permission

Section 73B was inserted to fill the gap left between non-material amendments and condition variations. It does not solve the Hillside problem, and its commencement needs checking.

Read article →
Planning Law Updates8 min read

Upward extensions under Part 20 and the prior approval tests

Part 20 grants the principle of adding storeys and then gives the authority a long list of prior approval matters. Daylight, amenity and external appearance are where these applications are won or lost.

Read article →