The costs application procedure on an appeal

6 min readBy PlanScope Editorial Team

Costs awards are about behaviour, not about who wins. Make the application at the right moment, prove the three limbs, and expect the authority to apply against you in return.

A costs application planning appeal procedure follows is narrow and unforgiving on timing. Costs are awarded where a party has behaved unreasonably, that behaviour has caused another party to incur unnecessary or wasted expense, and the expense arises in connection with the appeal. Winning the appeal is not a ground. Losing it is not a bar. The application has to be made before the inquiry or hearing closes, or with the final written submission in a written representations case, and a late application succeeds only in exceptional circumstances.

When to make the application

For an inquiry or a hearing, the application is made orally before the event closes, and the inspector will usually ask whether any party wishes to apply. Follow the oral application with a written version, normally submitted at the same time or immediately afterwards, because the inspector decides on the material before them.

For written representations, the application goes in with your final submission, by the deadline set in the Inspectorate's timetable.

Missing the point in the procedure is fatal in most cases. The Inspectorate will consider a late application only where there is a good reason, such as the unreasonable behaviour only becoming apparent afterwards, and the bar is high.

An inspector can also raise costs on their own initiative where the conduct of a party has been plainly unreasonable, though this is uncommon and is not something to rely on.

What has to be shown

Three limbs, and all three are needed.

Unreasonable behaviour, judged against what a reasonable authority or appellant would have done. Procedural unreasonableness covers how a party conducted itself: failing to meet deadlines, introducing new material late, withdrawing a case at the door of the inquiry, not providing the documents required by the appeal process. Substantive unreasonableness goes to the planning merits of the position taken.

Unnecessary or wasted expense actually incurred by the applicant for costs. A party who would have spent the money anyway has not been caused expense by the behaviour.

A causal link between the two, which is where many applications fail. Unreasonable conduct that did not add to anyone's bill does not support an award.

The commonest substantive grounds against an authority are familiar. Failing to produce evidence to substantiate a reason for refusal. Vague or generalised assertions about an impact, unsupported by any objective analysis. Refusing on a matter capable of being dealt with by condition. Not reviewing the case before the appeal, particularly where circumstances have changed. The way a vague refusal reason exposes an authority is set out in costs claims against a council for a vague refusal reason.

Members going against an officer recommendation is not unreasonable in itself. What is unreasonable is doing so without planning grounds that can be substantiated at appeal, and then defending the decision with no evidence.

Form and content of the application

Keep it short and structured. Identify the behaviour, date it, evidence it, and say what it cost.

  • A numbered list of the unreasonable acts or omissions, each with a date and a document reference.
  • For each, the national guidance ground it falls under.
  • What the appellant had to do in response that would otherwise have been unnecessary: a further report, a witness, an extra day of inquiry, an adjournment.
  • A statement that costs were incurred, with an indication of the category of work rather than the full bill at this stage.

Do not argue the planning merits again. A costs application that reads as a second closing submission is a weak one, because it does not identify behaviour.

Be realistic about the scope. A partial award against a single reason for refusal is much easier to obtain than a full award covering the whole appeal, and inspectors grant partial awards frequently.

Responding to a costs application

If you are on the receiving end, answer the three limbs rather than the tone. Set out what you did, why it was a reasonable course at the time on the information then available, and whether the other party actually incurred extra expense because of it.

Where an element of the criticism is fair, concede it and argue about scope. A respondent who defends everything loses credibility on the points that could have been defended.

Timing is tight. The inspector will usually allow a response at the event, or set a short written deadline. Prepare the response in advance where you can see the application coming, which on a case with a shaky reason for refusal you usually can.

Partial and full awards

A full award covers the whole of the costs of the appeal. A partial award covers a defined part: the costs attributable to one reason for refusal, to a particular witness, to an adjournment, or to a period during which a party failed to engage.

The costs decision determines liability rather than quantum. It says who pays and for what, and it does not fix a figure.

Read the wording of the award carefully. A partial award expressed as the costs of dealing with the second reason for refusal has to be translated into an actual bill, and the narrower the wording the more argument there will be about what falls inside it.

Costs decisions are published by the Planning Inspectorate alongside appeal decisions, which makes them a useful source when assessing the prospects of an application in a comparable situation.

Quantifying and enforcing an award

After the award, the parties agree the amount. Most awards settle at this stage, because detailed assessment costs money and carries its own risk.

Where agreement cannot be reached, the award is enforced by detailed assessment in the Senior Courts Costs Office. That is a formal process with its own rules and timetable, and the assessing officer will test the hourly rates, the hours claimed and the proportionality of the work.

Keep a proper record from the start of the appeal. Time recorded against identified tasks, with a note of which task was caused by the other party's behaviour, is worth far more at assessment than a reconstructed estimate. Consultant invoices should be itemised by workstream for the same reason.

A costs decision can only be challenged by judicial review, and the grounds are limited to the usual public law errors rather than disagreement with the outcome.

The risk of a counter application

Either party can apply, and authorities increasingly do. The most common grounds against an appellant are pursuing an appeal with no reasonable prospect of success, introducing amended plans or new evidence late so that the authority has to reassess the scheme, failing to comply with the procedural timetable, and withdrawing an appeal at a point when the authority has already prepared for an inquiry.

That risk should shape the decision to appeal at all. Where the case is weak, the calculation in withdraw and resubmit or appeal is worth running properly, because a resubmission carries no costs exposure.

Procedure choice matters too. Inquiry costs are an order of magnitude greater than written representations costs, so the exposure on both sides scales with the procedure selected, and the trade-offs are covered in choosing between written reps, hearing and inquiry.

Make sure the appeal case itself is tidy: evidence filed on time, a clear planning statement, no late amendments. Good housekeeping both strengthens your own application and removes the obvious grounds for one against you.

You can draft the planning statement and supporting documents for an appeal on PlanScope by entering the postcode and answering the guided questions, then have them reviewed before submission.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When must a costs application be made?

Orally before the close of an inquiry or hearing, followed up in writing, or with the final written submission in a written representations appeal. Late applications are entertained only in exceptional circumstances, such as where the unreasonable behaviour only became apparent after the event closed.

Does winning the appeal entitle me to costs?

No. Costs follow unreasonable behaviour, not the outcome. A successful appellant with no complaint about the authority's conduct gets nothing, and an unsuccessful appellant can still obtain an award where the authority behaved unreasonably and that caused unnecessary expense.

Is going against the officer recommendation unreasonable?

Not in itself. Members are entitled to disagree with officers. It becomes unreasonable where the decision rests on grounds that cannot be substantiated, or where the authority then fails to produce any evidence at appeal to support the reason for refusal it has put forward.

How is the amount of an award decided?

The costs decision determines liability, not quantum. The parties then agree the sum, and most awards settle at that stage. Where no agreement is reached, the award is enforced by detailed assessment in the Senior Courts Costs Office, which tests rates, hours and proportionality.

Can the council apply for costs against me?

Yes, and authorities do. Common grounds are pursuing an appeal with no reasonable prospect of success, introducing new evidence or amended plans late so the authority must reassess, missing procedural deadlines, and withdrawing an appeal after the authority has prepared for an inquiry.

Sources and further reading

appealscostsplanning inspectorateunreasonable behaviourprocedure

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Refusals and Appeals

View all →
Refusals and Appeals7 min read

Appealing a refusal of demolition in a conservation area

Since 2013 demolition in a conservation area needs planning permission. What the section 72 duty requires, how to assess contribution and what wins the appeal.

Read article →
Refusals and Appeals7 min read

Appealing a refusal on residential space standards

The Nationally Described Space Standard only bites where a local plan has adopted it, except under permitted development. How to answer a size refusal with evidence.

Read article →
Refusals and Appeals7 min read

Rebutting a refusal on heritage setting rather than fabric

Setting cases are won on method. Identify the asset, say what the setting contributes, state the harm level plainly, then make the balance argument with evidence rather than adjectives.

Read article →
Refusals and Appeals7 min read

Rebutting a refusal on flood risk sequential grounds

A sequential test refusal is rarely about the flood modelling. It is about which geographical area the council searched and whether the sites it found were genuinely available for your development.

Read article →
Refusals and Appeals6 min read

Rebutting an amenity refusal on noise from a use

Amenity refusals on noise rarely carry numbers. Separate plant, internal activity and people outside, measure the background properly, and hand the inspector enforceable conditions including post-installation verification.

Read article →
Refusals and Appeals7 min read

Rebutting a design refusal using national design guidance

Design refusals are usually assertions about prevailing character. Replace them with measured context analysis, structure the response around the National Design Guide, and run a costs claim where the reason was vague.

Read article →