Report Deep Dives

The interpretation section of a geotechnical report

6 min readBy PlanScope Editorial Team

The interpretative section is the part of a ground investigation report that commits to a view. Here is what belongs in it and what reviewers check first.

A geotechnical interpretation section is where measured ground data becomes advice a designer can build from. Everything before it is record keeping. The interpretative part takes borehole logs, in situ test results and laboratory data and turns them into a ground model, a set of characteristic values derived under Eurocode 7, and a statement of what remains unknown. Reviewers judge the whole report on this section, because it is the only part that commits to a view. A Geotechnical Assessment prepared for a planning application is expected by most authorities to carry a named, suitably qualified author, and professional review is strongly advised before it goes in.

Factual record and interpretation stay apart

Keep the factual material and the interpretation in separate, clearly labelled parts, even in a single bound document. The factual record is the exploratory hole logs, the field test results, the laboratory certificates and the monitoring data, presented without comment. The interpretation is everything that follows from them.

That separation is not presentational fussiness. If a later designer disagrees with your ground model, they need to re-derive from the raw data without unpicking your reasoning. And if the site is investigated again in five years, the factual record remains usable while the interpretation may be superseded.

Eurocode 7 sets up the same division through the Ground Investigation Report and the Geotechnical Design Report. The first collects and presents what was found. The second assigns design values and states the geotechnical design assumptions. For planning purposes you are usually writing something closer to the first plus an interpretative chapter, with the full design report following at the detailed design stage.

Building the ground model

The ground model is a set of layers with boundaries, properties and a described origin. It should read as a physical story of the site.

Say which stratum is made ground and how you distinguished it, because the boundary between made ground and natural deposits governs foundation depth more often than anything else on a brownfield site. State where you have interpolated between holes and where you have extrapolated beyond them. A model built from four boreholes on a one-hectare site is a sketch, and describing it as anything firmer invites trouble later.

Cross-sections earn their place here. Two sections at right angles, with the exploratory holes projected onto them and the inferred boundaries drawn as lines rather than certainties, communicate more than several pages of description. Where a boundary is uncertain, draw it dashed and say so in the caption.

Deriving characteristic values

Eurocode 7 asks for a cautious estimate of the value affecting the occurrence of the limit state. That phrase does the work, and it is not the same as the mean of your test results.

Set out the derivation explicitly:

  1. List the test results for each stratum, with outliers identified rather than silently dropped.
  2. Say whether the limit state is governed by a local value or by an averaged value over a failure surface, because that choice decides how cautious the estimate needs to be.
  3. State the selected characteristic value and the reasoning, including any correlation used to convert a field test result into a strength or stiffness parameter.
  4. Name the correlation source rather than referring to published relationships in general terms.
  5. Give the partial factors and design approach you have assumed, so the designer knows what has already been applied.

A reviewer who cannot follow that chain will ask for the report to be reissued. Showing the arithmetic is the difference between a document that gets used and one that gets filed.

Groundwater and seasonal variation

Single-visit water strikes recorded during drilling are among the least reliable numbers in any ground investigation. Drilling fluid, cavity collapse and the time between striking water and taking a reading all distort them.

What the interpretation needs is monitoring data from installed standpipes or piezometers over a period long enough to catch seasonal change, ideally through a winter. Where that data does not exist, say so plainly and state the design groundwater level you have assumed and why. Perched water in made ground, which behaves quite differently from the regional water table, deserves its own paragraph on any former industrial site.

For basement schemes this section is often the one that decides the application. A Basement Impact Assessment will lean on your groundwater interpretation to predict whether the excavation alters flow paths or affects neighbouring structures, and a thin groundwater section will be sent straight back.

Stating residual uncertainty

Every interpretative section should contain a short, honest passage on what is not known. It should be a specific list, rather than hedging spread thinly across every parameter.

Typical entries are the lateral extent of a soft layer between widely spaced holes, the depth to rockhead outside the investigated footprint, the absence of a winter groundwater record, and the possibility of obstructions from a demolished structure. Then say what would resolve each one, and at what stage. A condition requiring supplementary investigation before construction is a reasonable outcome, and it is far better than an assurance that later proves wrong.

This is the same discipline that makes any evidence section defensible. Writing the sequential test section inside a flood risk assessment works the same way: state the method, show the steps, and be explicit about the limits of what you tested.

Where contamination findings cross over

Ground investigation on brownfield land usually serves two purposes at once, and the interpretative sections have to talk to each other rather than sit in separate volumes.

Gas monitoring results feed a gas risk assessment and any protection measures, and those measures then constrain foundation and slab design. Aggressive ground conditions from sulphate or chloride testing govern concrete specification. Where remediation involves excavating and replacing material, the geotechnical properties of the replacement become a design input. Contamination work is expected to follow BS 10175 and to be carried out by suitably qualified and experienced people, and the Contaminated Land Assessment for the same site should reference your ground model rather than build a different one.

Say in your interpretation which findings you have taken from the contamination work and which you have derived independently. Two reports quoting different made ground thicknesses for the same site is a familiar and entirely avoidable objection.

What a reviewing engineer checks first

Experienced reviewers do not read these reports front to back. They go to a handful of places.

They check whether the number of exploratory holes and their depths match the scale and category of the proposal. They look for the characteristic value derivation and whether it is shown or asserted. They check the groundwater basis. They look for the uncertainty statement, and its absence tells them something. Then they check whether the recommendations are usable, which means parameters and depths rather than advice to consult a specialist.

If you are commissioning rather than writing, those five checks are worth doing yourself before the report reaches the council. Where a review is needed from someone with the right competence, the professional directory is the route to a reviewer who can sign a draft off.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. For specialist technical reports, qualified professional input may be required, and a geotechnical interpretation is firmly in that category.

Frequently asked questions

What is the difference between a factual and an interpretative ground investigation report?

The factual report presents exploratory hole logs, field and laboratory test results and monitoring data without comment. The interpretative report builds a ground model from that data, derives design parameters and makes recommendations. Keeping them separate lets a later designer re-derive values from the raw data without having to unpick someone else's reasoning.

What is a characteristic value in Eurocode 7?

Eurocode 7 defines it as a cautious estimate of the value affecting the occurrence of the limit state. It is not the mean of the test results. Whether the governing case is a local value or an average over a failure surface changes how cautious the estimate has to be, so the derivation should be set out step by step.

How long should groundwater be monitored before a report is written?

Long enough to capture seasonal variation, which normally means monitoring installed standpipes or piezometers through a winter. Water strikes recorded during drilling are unreliable because of drilling fluid, cavity collapse and reading delays. Where monitoring data is missing, state the assumed design groundwater level and the basis for it.

Who should write a geotechnical interpretation for a planning application?

Most local planning authorities expect a named author with relevant geotechnical competence and professional indemnity cover, and many conditions require the work to be verified by a suitably qualified person. An AI-assisted draft can structure the document and identify the sections needed, but the derivation of design values requires professional judgement.

Should contamination and geotechnical interpretation be in one report?

They can be, and often should share one ground model. What matters is that gas and chemical findings, concrete specification and any remediation by excavation are reflected in the geotechnical recommendations. Two reports quoting different made ground thicknesses for the same site is a common and easily avoided objection.

Sources and further reading

geotechnicaleurocode 7ground investigationreport writingcontaminated land

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Report Deep Dives

View all →
Report Deep Dives7 min read

The sensitivity and magnitude matrix in an LVIA

GLVIA3 supplies a method, not a matrix. How value and susceptibility combine, what magnitude actually contains, and how to report year 1 and year 15 residual effects defensibly.

Read article →
Report Deep Dives7 min read

The ground gas assessment section of a Phase 2 report

Monitoring in settled weather, flow readings at the resolution limit and a characteristic situation with no source behind it are the three failures reviewers see most. What a defensible ground gas section contains.

Read article →
Report Deep Dives7 min read

The background sound survey in a Noise Impact Assessment

The LA90 background sets everything else in a BS 4142 rating. Measurement positions, representative periods, calibration records and the uncertainty a reviewer will look for.

Read article →
Report Deep Dives7 min read

The scope and modules of a Whole Life Carbon Assessment

Upfront, embodied and whole life carbon are three different figures from different module sets. The scope errors that get assessments rejected, and the assumptions that move the result.

Read article →
Report Deep Dives6 min read

The carbon offset and monitoring sections of an Energy Statement

Offsetting deals with what is left after fabric, plant and renewables. The residual calculation, the obligation drafting, the metering strategy and who reports once units are sold.

Read article →
Report Deep Dives6 min read

The sustainable transport section of a Transport Assessment

Trip generation is arithmetic, accessibility is judgement. Isochrones instead of circles, LTN 1/20 route quality, honest bus evidence and measures that can actually be secured.

Read article →