Viability, Obligations and Commercial

The retail sequential test: available, suitable and viable

6 min readBy PlanScope Editorial Team

A sequential test asks three questions of every alternative site. This covers catchment definition, evidencing availability with dated agent enquiries, the flexibility national policy expects, and the 300 metre edge of centre definition.

The retail sequential test is three questions asked of every alternative site, and losing an appeal on it almost always means one of the three was answered loosely. Is the site available. Is it suitable. Is it viable. National policy requires main town centre uses proposed outside a town centre to demonstrate that there are no suitable sequentially preferable sites, and Planning Practice Guidance frames that demonstration around those three limbs.

The current National Planning Policy Framework, published on 17 August 2026, carries its town centre policies as policy codes rather than the paragraph numbers used in earlier editions. Check the code in the edition you are working from, because an inspector will.

Where the test comes from

National policy applies a town centre first approach. Main town centre uses should be located in town centres, then in edge of centre locations, and only then out of centre, with preference among out of centre sites for those that are accessible and well connected to the centre.

The test applies to applications for main town centre uses that are not in an existing centre and are not in accordance with an up-to-date development plan. An allocation in an adopted plan does the work for you, which is the first thing to check before commissioning any search.

Separately from the sequential test, an impact assessment is required for retail and leisure development outside town centres above a floorspace threshold. Where the plan sets no local threshold, the national default of 2,500 m² applies. Local plans frequently set lower figures, and in a district with a 500 m² threshold the assessment burden on a mid-sized scheme is entirely different.

The search area is where arguments start. Define it with evidence rather than assertion.

Begin with the centre hierarchy in the development plan, then identify which of those centres could realistically accommodate a development of the type and scale proposed. A district centre with a 1,200 m² vacant unit is a candidate for a 1,000 m² foodstore and is not a candidate for a 6,000 m² one.

Three practical points.

The catchment should reflect how the proposal would actually trade, supported by drive time or walking distance analysis, not by a convenient administrative boundary.

Centres in neighbouring authorities count if they fall within the catchment. Omitting them because they sit over a border is the most common structural error in a sequential test, and objectors notice.

The search has to be current at the date of the decision, not the date it was written. A search eight months old will be attacked, and on a long determination it should be refreshed.

Availability and the timing question

Available means available for the development, now or within a reasonable period. Reasonable has no fixed definition, and that is where judgement enters.

Evidence availability properly:

  • Named agent enquiries, with dates, and the response recorded.
  • Ownership position, including whether the owner is willing to sell or let.
  • Existing occupation, lease terms and break dates where known.
  • Any allocation, option or conditional contract affecting the site.

A site in active occupation under a lease with eight years to run is not available in any meaningful sense, and saying so with the lease position evidenced is far stronger than asserting it. Conversely, a vacant unit whose owner has refused to engage is still available unless you can show why not.

The timing question cuts both ways. A town centre site that will come forward in three years may be sequentially preferable for a plan-led scheme and not for an occupier with a committed requirement, and the inspector will want to know which situation this is.

Suitability and the flexibility you must show

Suitability is judged against the development proposed, not against some hypothetical alternative scheme. The Supreme Court settled that in Tesco Stores Ltd v Dundee City Council, and it is the most frequently cited authority in this area.

That does not let an applicant define the proposal so tightly that no other site could ever accommodate it. National policy requires applicants to demonstrate flexibility on format and scale, so a search that rejects every alternative because it cannot take the exact floorplate, the exact car parking ratio and the exact servicing arrangement will fail.

The balance an inspector looks for:

Flexibility expected Flexibility not required
Reduced floorspace within a workable range A scheme that cannot trade
Different internal configuration or a two-storey format Abandoning the operational model entirely
Fewer parking spaces where accessibility supports it A site with no servicing access at all
Phasing or a smaller first phase Disaggregating into parcels that are not practical or viable

Disaggregation deserves its own sentence. There is no requirement to split a proposal across several sites where doing so would not be practical or viable, and the courts have accepted that. But the applicant has to explain why, in terms specific to the operation rather than in general.

Viability as the third limb

Viability here means the viability of developing the alternative site for the proposal, assessed on normal development appraisal principles. A site that could physically take the scheme but only at a cost that no operator would bear is not a sequentially preferable site.

Two cautions. First, viability evidence in a sequential test is not the same exercise as a Viability Assessment testing affordable housing or obligations, although the appraisal discipline overlaps. Second, an unsupported assertion that an alternative site is unviable carries no weight. Show the abnormal costs, the site assembly position or the remediation liability that makes it so.

Where the alternative site is in the same ownership as a landowner with no intention of selling, that is an availability point rather than a viability one. Keeping the three limbs distinct in the write-up is what makes the search legible.

Edge of centre and the 300 metre question

Edge of centre has a defined meaning in the Framework's glossary. For retail purposes it is a location well connected to and up to 300 metres from the primary shopping area. For all other main town centre uses it is a location within 300 metres of a town centre boundary.

Two consequences follow. A site at 280 metres with a severance feature between it and the centre, such as a dual carriageway with no crossing, may be edge of centre on the measurement and function as out of centre in practice. And a site at 350 metres is out of centre however good the footpath link, which affects the order of preference in the search.

Measure from the right boundary, state which boundary you measured from, and show the route rather than the straight line distance.

Presenting a search that holds up

Structure the document so the reader can audit it. A table of every centre in the catchment, a table of every site considered in each centre, and three columns recording the conclusion on availability, suitability and viability with the evidence reference for each.

Then deal with the near misses honestly. Every sequential test has one or two sites that are arguable, and addressing them head on with the evidence is more persuasive than burying them in a list.

A Sequential Test (Retail) draft structures that search and the policy framing, and an Economic Impact Assessment often sits alongside it where regeneration or employment benefits form part of the case. Councils normally expect a suitably qualified author for retail impact work, and professional review is strongly advised.

Enter your postcode on PlanScope to see which reports a retail or leisure proposal outside a centre is likely to need.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

When does the sequential test apply?

To applications for main town centre uses that are not in an existing centre and are not in accordance with an up-to-date development plan. An allocation in an adopted plan removes the need for the test, so check the plan before commissioning any search. Small scale rural development is also treated differently in national policy.

What is the impact assessment threshold?

Where a local plan sets no threshold, the national default of 2,500 square metres of gross floorspace applies to retail and leisure development outside town centres. Many plans set lower local figures, so a district with a 500 square metre threshold changes the assessment burden on a mid-sized scheme completely.

Does suitability mean suitable for any development?

No. Suitability is judged against the development proposed, which the Supreme Court settled in Tesco Stores Ltd v Dundee City Council. That does not allow an applicant to define the proposal so narrowly that no alternative could ever fit, because national policy still requires flexibility on format and scale.

Do I have to split the proposal across several sites?

Not where disaggregation would be impractical or unviable, and the courts have accepted that. The obligation is to explain why in terms specific to the operation rather than in general assertions. A sequential test that dismisses disaggregation in a single sentence invites an objection on exactly that point.

What counts as edge of centre?

For retail purposes, a location well connected to and up to 300 metres from the primary shopping area. For other main town centre uses, within 300 metres of the town centre boundary. State which boundary you measured from and show the walking route, since a severance feature can make a close site function as out of centre.

Sources and further reading

retail planningsequential testtown centresretail impactnational planning policy

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Viability, Obligations and Commercial

View all →
Viability, Obligations and Commercial7 min read

Nomination agreements and why providers reject drafts

A stalled nomination agreement becomes a planning problem when occupation is tied to it. What providers need in the drafting, and when to involve them.

Read article →
Viability, Obligations and Commercial7 min read

Phasing triggers in a section 106 and what they key to

On a phased site the triggers in a section 106 matter more than the totals. How each type behaves, and the definitions that make them work when the programme slips.

Read article →
Viability, Obligations and Commercial7 min read

Overage and clawback in a planning obligation

Section 106 overage shares scheme upside with the authority, usually as affordable housing. This covers early, mid and late stage triggers, defining the uplift, why a cap matters to funders, and the drafting traps that surface years later.

Read article →
Viability, Obligations and Commercial6 min read

Levy stop notices and what they prevent

A levy stop notice halts the whole site, not just part of it, and breaching one is a criminal offence. Here is the warning notice sequence, how an instalment default creates an overdue balance, and the contractual damage that follows.

Read article →
Viability, Obligations and Commercial6 min read

Appealing a levy surcharge to the Planning Inspectorate

Surcharge appeals under regulation 117 go to the Planning Inspectorate within 28 days, while chargeable amount disputes go to the Valuation Office Agency. The grounds are narrow and factual.

Read article →
Viability, Obligations and Commercial6 min read

Levy abatement on a section 73 permission explained

Varying a permission creates a fresh Community Infrastructure Levy liability. Abatement under regulation 128A credits the original amount, but reliefs must be claimed again.

Read article →