Wales, Scotland and Northern Ireland

The SPPS and local development plans in Northern Ireland

6 min readBy PlanScope Editorial Team

Northern Ireland only. Eleven councils, one strategic policy statement, retained policy statements that switch off on Plan Strategy adoption, and mandatory pre-application community consultation for major schemes.

This article covers Northern Ireland only. The framework here is the Planning Act (Northern Ireland) 2011, the Strategic Planning Policy Statement and the two part local development plan, and none of the English terminology transfers.

Northern Ireland runs a two-tier planning system in which eleven councils determine most applications and the Department for Infrastructure handles the largest category. The policy framework sits in a single strategic statement published in 2015, with a stack of older policy statements still carrying weight until each council completes its own plan. Working out which policy applies to a site means knowing where that council has got to.

What the SPPS is and what it replaced

The Strategic Planning Policy Statement for Northern Ireland, published in September 2015, sets out regional planning policy for the whole jurisdiction. It consolidated the subject-based planning policy statements that had accumulated over the previous two decades into one document organised around sustainable development.

It did not sweep the old statements away. The retained policy statements continue to apply until a council adopts the Plan Strategy part of its local development plan, at which point the council's own policies take over for that district. Where a retained statement conflicts with the strategic statement, the strategic statement prevails.

The practical consequence is that the answer to "which policy applies" is different in each of the eleven council areas and changes as each plan progresses. Check the council's plan status before you cite anything.

The two part local development plan

The 2011 Act replaced the old area plans with a local development plan in two parts, prepared in sequence.

  1. A timetable, agreed with the Department, setting out when each stage will happen.
  2. A Preferred Options Paper, consulting on the strategic choices before anything is drafted.
  3. The Plan Strategy: the vision, objectives, the spatial strategy and the strategic policies, published in draft, subjected to independent examination and then adopted.
  4. The Local Policies Plan: site allocations, settlement limits, designations and local policies, following the same draft, examination and adoption route.

Adoption of the Plan Strategy is the moment that matters for anyone citing policy, because it is the trigger that switches off the retained regional statements for that district. Between adoption of the Plan Strategy and adoption of the Local Policies Plan, a council is working from its new strategic policies alongside the site-specific content of the old area plan.

The Regional Development Strategy sits above all of it as the spatial strategy for the region, and plans must take account of it.

The development hierarchy

Applications fall into three categories, and the category decides who determines the application and what process applies.

Category Determined by Notable requirements
Regionally significant Department for Infrastructure Referred or called in, with its own procedures
Major The council Pre-application community consultation, proposal of application notice
Local The council Standard procedures

The thresholds for major development are set in regulations and cover residential unit numbers, floorspace and site area among other categories, in the same general shape as the English definition but with their own figures. Take the current thresholds from the regulations rather than assuming the English numbers apply.

Pre-application community consultation

This is the feature that surprises practitioners arriving from England. For major development, the applicant must serve a proposal of application notice on the council and carry out pre-application community consultation before submitting the application, under the 2011 Act.

The notice sets out what is proposed and how consultation will be carried out. The consultation has to happen, and the application must be accompanied by a report on it. Submitting a major application without having done this is not a matter of weight, it is a validity problem.

Plan it into the programme at the start. The consultation report should record what was said and what changed as a result, and where nothing changed it should say why. A Statement of Community Involvement prepared for an English scheme has a similar purpose but a different statutory basis, so it needs rewriting rather than relabelling for a Northern Ireland application.

How applications are determined

Section 6(4) of the 2011 Act provides the plan-led rule: where regard is to be had to the local development plan, the determination must be made in accordance with the plan unless material considerations indicate otherwise. That will read as familiar to anyone who knows section 38(6) in Great Britain, and it operates in the same way.

Councils determine local and major applications, with planning committees and delegated arrangements set out in each council's own scheme of delegation. The Department for Infrastructure retains call-in powers and determines the top tier of the hierarchy.

Appeals go to the Planning Appeals Commission rather than to the Planning Inspectorate. The Commission is an independent appellate body with its own procedures and its own published decisions, and the appeal period differs from the English one, so check the current deadline on the Commission's own material rather than assuming six months.

Community planning and its influence

The community planning duty introduced for councils in 2014 sits alongside the planning system rather than inside it, and the two connect at the plan.

Each council prepares a community plan with its partners covering wellbeing, economic development, health and infrastructure. The local development plan must take account of it, which in practice means the plan's objectives echo the community plan's outcomes.

For an applicant, the useful consequence is that a scheme aligned with a stated community plan outcome has an argument available that does not exist in the English system. It is not a policy test and it will not carry a scheme on its own, and it is worth a paragraph in a supporting statement where it really applies.

Reading the policy framework for a site

Work in this order.

Find out whether the council has adopted its Plan Strategy, and whether the Local Policies Plan has followed. Identify what remains of the old area plan for the site, including settlement limits and designations. Then identify which regional policy statements still apply in that district, and read the strategic statement's corresponding section for anything that overrides them.

Only then write the policy section. A Planning Statement that cites an English framework paragraph in a Northern Ireland application signals immediately that the author has not done this, and a Design and Access Statement prepared to English validation requirements will need checking against the Northern Ireland regulations, which have their own thresholds for when one is required.

PlanScope's drafting is grounded in English national policy and English local plans. A draft prepared for a Northern Ireland application will carry a sound structure and the wrong policy references, and it needs a reviewer who works in the Northern Ireland system to replace them before submission. That is a real limitation, not a formality.

This is general guidance on the Northern Ireland system, not legal advice. Check the position with the relevant council or a qualified Northern Ireland planning professional before relying on it.

PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.

Frequently asked questions

What is the SPPS?

The Strategic Planning Policy Statement for Northern Ireland, published in September 2015, which sets out regional planning policy and consolidated the subject-based planning policy statements issued over the previous two decades. It did not revoke them: the retained statements continue to apply in a district until that council adopts its Plan Strategy.

What are the two parts of a local development plan?

The Plan Strategy, containing the vision, objectives, spatial strategy and strategic policies, and the Local Policies Plan, containing site allocations, settlement limits, designations and local policies. Each goes through draft, independent examination and adoption in turn, so a council can have adopted one and not the other.

Who determines applications in Northern Ireland?

The eleven councils determine local and major applications under their own schemes of delegation, while the Department for Infrastructure determines regionally significant applications and retains call-in powers. The three category development hierarchy is set out in the Planning Act (Northern Ireland) 2011 and the associated regulations.

Is pre-application consultation compulsory?

For major development, yes. The applicant must serve a proposal of application notice on the council and carry out pre-application community consultation before submitting, with a report on that consultation accompanying the application. Failing to do it is a validity problem rather than a matter of weight, so build it into the programme early.

Where do planning appeals go?

To the Planning Appeals Commission, an independent appellate body with its own procedures and published decisions, rather than to the Planning Inspectorate. The appeal period differs from the English one, so take the current deadline from the Commission's own material rather than assuming the six month period used in England.

Sources and further reading

northern irelandsppslocal development planplanning act 2011community consultation

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Wales, Scotland and Northern Ireland

View all →
Wales, Scotland and Northern Ireland7 min read

Householder permitted development in Northern Ireland

Extensions, outbuildings and dormers in Northern Ireland are governed by the Planning (General Permitted Development) Order (Northern Ireland) 2015, not the England Order. The differences are substantive.

Read article →
Wales, Scotland and Northern Ireland7 min read

The two tier planning system in Northern Ireland

Eleven councils determine most applications and the Department for Infrastructure takes the regionally significant ones. The category decides the consultation, the decision-maker and the appeal route.

Read article →
Wales, Scotland and Northern Ireland7 min read

Notification of planning applications to Scottish Ministers

Notification bites after a Scottish authority has decided to approve, not before. The categories that trigger it, what happens during the pause, and why withdrawing a statutory objection is the whole game.

Read article →
Wales, Scotland and Northern Ireland7 min read

The hierarchy of developments in Scotland explained

In Scotland the development category decides whether you must consult the community twelve weeks before applying, how long determination takes and where an appeal goes. Here is how to work out which category applies.

Read article →
Wales, Scotland and Northern Ireland7 min read

Listed building consent in Scotland: categories A, B and C

Scotland grades listed buildings A, B and C, protects interiors as standard and still requires a separate conservation area consent for demolition. Here is how the consent works and who must be consulted.

Read article →
Wales, Scotland and Northern Ireland7 min read

Local place plans in Scotland and what they change

The Planning (Scotland) Act 2019 gave communities a statutory route to set out proposals for land in their area. Registration matters, and so does the timetable.

Read article →