Total solar energy transmittance in glazing
Total solar energy transmittance is the single largest lever in an overheating model. What it measures, typical ranges, the daylight trade-off and how to write it into a submission.
Total solar energy transmittance, usually written as the g-value, is the fraction of incident solar energy that a glazing unit admits into a room. It combines the radiation transmitted straight through the glass with the portion absorbed in the glass and then re-radiated inwards. It is determined to the relevant European standard and declared by the manufacturer for a specific unit build-up, so a g-value quoted for double glazing in general tells you nothing about the unit you are buying.
Of every input in an overheating model, this is the one with the largest effect on the answer. Change it and the result moves more than it does for almost any fabric change.
What the value measures
Picture solar radiation striking a sealed unit. Some passes directly through. Some is reflected away. Some is absorbed by the panes and the coating, and part of that absorbed heat then flows inward by conduction and re-radiation while the rest flows back outward.
The g-value is the sum of the direct transmission and the inward-flowing share of the absorbed energy, expressed as a decimal between 0 and 1. A unit with a g-value of 0.4 admits 40 per cent of the incident solar energy.
Two related terms cause confusion. Light transmittance describes the visible part of the spectrum only, and it is a different number from the g-value. Shading coefficient is an older measure expressing performance as a ratio against 3 mm clear glass, so a g-value converts to a shading coefficient by dividing by 0.87. Specifications that mix the two produce modelling errors.
Typical ranges for clear and solar control glass
Figures vary by manufacturer, coating and build-up, so take the number from the product data. The typical ranges below give the order of magnitude for a sealed unit.
| Glazing type | Typical g-value range | Typical light transmittance |
|---|---|---|
| Clear double glazing | Around 0.70 to 0.76 | High, around 0.80 |
| Low emissivity double glazing | Around 0.60 to 0.65 | Around 0.75 to 0.80 |
| Triple glazing, clear | Around 0.50 to 0.60 | Around 0.70 |
| Solar control double glazing | Around 0.30 to 0.40 | Around 0.60 to 0.70 |
| High performance solar control | Around 0.25 or below | Around 0.50 to 0.60 |
| Body tinted glass | Around 0.40 to 0.50 | Lower, with a visible colour cast |
The ratio of light transmittance to g-value, sometimes called the selectivity, is the figure to compare between products. A coating that cuts solar gain while keeping visible light is doing useful work; a tint that cuts both equally is simply making the room darker.
Effect on overheating results
In a dynamic overheating assessment the solar gain through glazing is often the dominant heat input in summer, particularly in a single-aspect flat with a large window on a sunny elevation. Lowering the g-value reduces that input directly and proportionally.
The sensitivity is worth understanding before any redesign. A reduction in g-value cuts gain across the whole cooling season, including hours when the window cannot be opened because of noise or fall protection. That makes it more reliable than a ventilation measure, which depends on occupant behaviour and on external conditions.
It is also, in a modelling sense, a free parameter. Changing the g-value changes nothing about the layout, the massing or the facade proportions, which is why it is the first thing an engineer adjusts when a scheme fails. An Overheating Risk Assessment should state the g-value used for each orientation so a reviewer can see what the result depends on.
Trade-off with daylight transmittance
The cost of a low g-value is light. A unit at 0.25 with a light transmittance around 0.5 admits half the visible light of clear glazing, and in a deep single-aspect room that can push the internal daylight result below target.
So the two assessments have to be run on the same specification. A scheme that passes overheating with solar control glass and passes daylight with clear glass has not passed either, because it is two different buildings. Where both are tight, a Daylight and Sunlight Assessment and the overheating work should be iterated together rather than produced in sequence by different consultants.
And there is an appearance dimension. Strongly coated or tinted glass reads as reflective or green-grey from outside, and in a conservation area or on a heritage-sensitive frontage that becomes a design objection. Obtain a sample and a photograph of the product in situ before committing, because the elevation drawings will not show it.
Where external shading works better
Shading placed outside the glass stops solar energy before it enters, so it reduces gain without reducing the visible light transmitted by the glass itself. That is a better outcome than a low g-value where daylight is constrained.
- Horizontal projections, brise soleil or deep reveals work on southern elevations, where the sun is high when it matters.
- Vertical fins work on east and west elevations, where low morning and evening sun defeats horizontal shading.
- Balconies above a window act as shading and should be modelled as such rather than ignored.
- External blinds or shutters give the best performance and the worst maintenance position.
- Internal blinds help far less, because the energy has already entered and the blind becomes a warm radiant surface.
The orientation rule is the one most often got wrong. Horizontal shading on a west-facing window does very little, and a scheme that relies on it will fail the assessment for rooms on that elevation.
An illustrative sensitivity test
The useful exercise is a one-variable run. Hold the geometry, construction, gains, occupancy and window opening logic constant, then model the scheme with two or three g-values and report the exceedance hours for each.
Set it out as a short table: g-value, exceedance hours per room, and pass or fail against each criterion. That tells the design team the specification the scheme actually needs, rather than the one someone hoped would be enough.
This is a method rather than a result. The size of the improvement depends on orientation, glazed proportion, construction weight, ventilation and the weather file, so the numbers have to be calculated for your building and should be labelled illustrative where used as an example.
Run the test early. A sensitivity study at concept stage costs a day of modelling; the same question answered after the facade is tendered costs a redesign, with the planning consequences set out in our note on value engineering after permission.
Specifying it in a submission
Put the g-value in the window schedule, per orientation and per unit type, with the light transmittance beside it and the standard it was determined to.
Avoid the phrase solar control glazing without a number. It commits a contractor to nothing, and a condition requiring development in accordance with an energy or overheating report that contains no figure is unenforceable in practice and unhelpful to everyone.
Where a condition is likely, propose the wording: a maximum g-value and a minimum light transmittance by orientation, with a tolerance. That gives the contractor room to substitute a product while protecting the result the assessment relied on, and it keeps the Energy Statement and the overheating work describing the same building.
Browse the report types PlanScope can draft to see what a residential scheme needs.
This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
What does the g-value measure?
The fraction of incident solar energy that a glazing unit admits, combining radiation transmitted directly through the glass with the inward-flowing share of the energy absorbed in the panes and coating. It is expressed as a decimal, so a unit at 0.4 admits 40 per cent of the solar energy striking it.
Is the g-value the same as light transmittance?
No. Light transmittance covers the visible part of the spectrum only and is a separate declared figure. A good solar control product has a low g-value with a relatively high light transmittance, and the ratio between them is the useful basis for comparing products.
How does the g-value relate to shading coefficient?
Shading coefficient is an older measure expressing performance relative to 3 mm clear glass, so a g-value converts to a shading coefficient by dividing by 0.87. Specifications that mix the two produce modelling errors, so state which measure and which standard the figure comes from.
Why is the g-value so important in overheating assessment?
Because solar gain through glazing is usually the dominant summer heat input, especially in single-aspect flats with large windows. Lowering the g-value cuts that gain across the whole cooling season, including hours when windows cannot be opened for noise or fall protection reasons, which makes it more reliable than ventilation measures.
Does low g-value glazing harm daylight?
It can. A unit at 0.25 with light transmittance around 0.5 admits half the visible light of clear glazing, which in a deep single-aspect room can push the internal daylight result below target. Run the daylight and overheating assessments on the same specification rather than in sequence.
When is external shading a better answer?
When daylight is constrained, because shading outside the glass stops solar energy before it enters without reducing the glass's own light transmittance. Use horizontal projections on southern elevations and vertical fins on east and west, where low sun defeats horizontal shading.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.