Comparisons

TPO consent or a conservation area tree notice

6 min readBy PlanScope Editorial Team

Two different procedures protect trees, and householders regularly use the wrong one. This compares an application for consent under a tree preservation order with the six week notice for conservation area trees.

Two separate procedures protect trees in England, and they work in opposite directions. A tree covered by a tree preservation order needs an application for consent, which the council decides. A tree in a conservation area needs six weeks written notice, after which you may proceed unless the council has made an order in the meantime.

One asks permission. The other gives warning. Using the wrong procedure is a criminal offence rather than a paperwork error, which is why it is worth ten minutes checking before the tree surgeon arrives.

What a tree preservation order controls

An order made under section 198 of the Town and Country Planning Act 1990 prohibits cutting down, topping, lopping, uprooting, wilfully damaging or wilfully destroying a protected tree without the council's written consent. Orders can cover individual trees, groups, areas or whole woodlands.

An application for consent goes to the council on the standard form with a plan, a description of the work proposed and the reason for it. There is no fee. The council normally determines it within eight weeks, and it can grant consent, grant it subject to conditions, or refuse.

Conditions commonly require the work to be carried out to a British Standard specification, within a stated period, and by a competent contractor. Replanting is frequently required where a tree is removed.

There is a right of appeal to the Planning Inspectorate against a refusal or against conditions, and against a failure to decide within the period.

What a conservation area notice controls

Section 211 of the same Act applies to trees in a conservation area that are not already covered by an order. It requires six weeks written notice to the council before works are carried out.

The notice applies to trees with a stem diameter of more than 75 millimetres measured at 1.5 metres above ground level, or more than 100 millimetres where the work is thinning to help the growth of other trees. Smaller stems fall outside it.

During the six weeks the council decides whether the tree merits protection. If it makes an order, the ordinary consent procedure then applies and the work cannot proceed without consent. If it does nothing, the work may be carried out once the six weeks expire, and the permission lasts two years from the date of the notice.

The notice is not an application. There is nothing to grant, no conditions and no appeal, because the council has not decided anything.

The two side by side

Tree preservation order Conservation area notice
Legal basis Section 198 and the 2012 regulations Section 211
What you submit An application for consent A notice of intended works
Council response A decision within about eight weeks Either an order, or silence
If nothing happens You cannot proceed You may proceed after six weeks
Conditions Can be imposed, including replanting None
Appeal Yes, to the Planning Inspectorate No, because nothing is decided
Validity As stated in the consent Two years from the notice
Fee None None

Exemptions that apply to both

A short list of works fall outside both procedures, and they are narrower than most people assume.

Dead trees may be removed, but notice must be given to the council five days beforehand except in an emergency. Trees presenting an immediate risk of serious harm may be dealt with urgently, with notice given as soon as practicable afterwards. Keep photographs and, where possible, an arboricultural opinion, because the burden of showing that the exemption applied falls on the person who did the work.

Other exemptions cover work by statutory undertakers, work required to implement a full planning permission, some work to fruit trees grown for fruit production, and work required by an Act of Parliament. The overlap with planning permission is narrower than it sounds: it covers work necessary to carry out development already permitted in detail, not work that would be convenient for a scheme you intend to apply for.

Never rely on the dangerous tree exemption as a substitute for a notice where the tree is merely awkward. Councils prosecute.

Replanting duties

Remove a protected tree in contravention of an order and a duty to plant a replacement arises, enforceable by the council through a tree replacement notice. A similar duty applies to trees in conservation areas removed without the required notice.

The council can specify the species, size and position of the replacement. It is not a symbolic requirement, and a replacement notice runs with the land, so it survives a sale.

Where a consent has been granted subject to a replanting condition, plant within the period stated. Missing the planting season is the usual reason this goes wrong, and the council will not always be flexible about it.

Penalties

Cutting down, uprooting or wilfully destroying a protected tree, or damaging it in a way likely to destroy it, is an offence that can attract an unlimited fine on conviction. Courts take account of any financial benefit gained, which matters where the tree stood in the way of a development.

Lesser works in breach carry a lower maximum penalty, and both the person who carried out the work and the person who caused or permitted it can be prosecuted. A contractor instructed by a homeowner is not the only one at risk.

Checking which applies

Work through it in order.

  1. Ask the council whether the tree is subject to an order. Most publish a searchable map or register, and the planning department will confirm by email. Get the answer in writing.
  2. Check whether the property sits in a conservation area, using the council's mapping.
  3. Measure the stem diameter at 1.5 metres above ground if the conservation area route applies, since smaller stems are outside it.
  4. Check any planning permission affecting the site for conditions protecting trees, which bind separately from an order.
  5. Ask whether the tree is on a boundary or in a neighbour's ownership, because the procedure is the same but the civil position is not.

Where trees affect a development proposal rather than simply needing maintenance, a survey to the relevant British Standard is the document to commission, and a tree survey supports both the application and any consent sought for works.

For works that form part of a development, the interaction with the permission matters, and the mechanics of changing or discharging conditions are covered in discharging conditions or amending a permission. Where the question is whether the works need any consent at all, the distinction between certificates and applications in lawful development certificate or planning permission is a useful comparison.

This is general guidance, not legal advice. Check the position with your local planning authority or a qualified professional before relying on it. PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval. Enter your postcode on PlanScope to see which documents a tree related application is likely to need.

Frequently asked questions

How do I find out if a tree has a preservation order on it?

Ask the council. Most publish a searchable map or register of orders online, and the planning department will confirm by email if you give the address and describe the tree. Get the answer in writing and keep it, because an incorrect verbal assurance is no defence if the tree turns out to be protected.

What happens if the council does not respond to my section 211 notice?

Silence is the answer you want. If the council has not made a tree preservation order by the end of the six week period, you may carry out the works described in the notice, and that permission lasts for two years from the date of the notice. Keep a dated copy of what you sent.

Does the notice apply to every tree in a conservation area?

No. It applies to trees with a stem diameter of more than 75 millimetres measured at 1.5 metres above ground, or more than 100 millimetres where the work is thinning to help other trees grow. Trees already covered by an order follow the consent procedure instead, not the notice procedure.

Can I remove a dangerous tree without telling the council?

Only where there is an immediate risk of serious harm, and you must notify the council as soon as practicable afterwards. For a dead tree that presents no urgent danger, give five days notice beforehand. Photograph the tree first and obtain an arboricultural opinion, because you carry the burden of proving the exemption applied.

Who is liable if a contractor fells a protected tree?

Both the person who carried out the work and the person who caused or permitted it can be prosecuted, so a homeowner who instructed the work is exposed alongside the contractor. Penalties for destroying a protected tree can include an unlimited fine, and courts take account of any financial benefit gained.

Sources and further reading

tree preservation orderconservation areasection 211treeshouseholder

This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.

More in Comparisons

View all →
Comparisons6 min read

Extension of time agreement or renewing a permission

Two things that get confused. Extending the determination period is routine; extending the life of a permission is impossible, and section 73 cannot do it either.

Read article →
Comparisons7 min read

Deed of variation or a section 106A application

Two routes to change a planning obligation, with very different tests. Why section 106A is not a viability hearing, and when a fresh application beats both.

Read article →
Comparisons7 min read

Building notice or full plans application to building control

Two routes to building control approval under the Building Regulations 2010. What each involves, where a building notice is unavailable, and how completion certificates and regularisation work.

Read article →
Comparisons8 min read

Dropped kerb approval or permission for a front hardstanding

The crossover is licensed under the Highways Act 1980. The driveway behind it is permitted development only if it is porous or drains inside your boundary. Most people need both approvals.

Read article →
Comparisons7 min read

Strategic Environmental Assessment or Sustainability Appraisal

A local plan appraisal discharges two duties at once: strategic environmental assessment under the 2004 Regulations and sustainability appraisal under section 19(5). Only one has sharp legal teeth.

Read article →
Comparisons7 min read

Environmental permit or planning permission for a waste use

The Environment Agency permits the operation. The waste planning authority decides whether the use belongs there. Both are needed, and a registered exemption is not a planning permission.

Read article →