The tree constraints plan in a BS 5837 survey
Categories, root protection areas, crown spreads and shade, drawn before the layout. How the constraints plan is produced and what happens when it arrives too late.
The tree constraints plan is the drawing that should exist before the layout does. It takes the survey schedule from a BS 5837:2012 tree survey and turns it into spatial information a designer can work with: root protection areas, crown spreads, shade patterns and a category for each tree. Produced at the right moment it shapes the building footprint. Produced after planning drawings are fixed, which is the common case, it becomes a record of the conflicts already designed in.
What the plan shows
A tree constraints plan is a scale drawing, normally at the same scale as the site survey, carrying four layers of information for every tree recorded.
The existing crown spread, plotted from the four cardinal point measurements rather than drawn as a circle. The root protection area, shown as a plotted area rather than a note. The category, usually by colour or hatch, with a legend. And shade, where trees sit in positions that affect the usable parts of the site.
It does not show the proposal. That is the point of it. The moment a building outline appears on the same drawing, the conversation shifts from what the constraints are to whether they can be accommodated, and those are different questions asked at different times.
Category grading and what each letter commits you to
BS 5837:2012 sorts trees into four categories based on quality and remaining contribution.
| Category | Meaning | Design consequence |
|---|---|---|
| U | Unsuitable for retention, in decline or dangerous | Removal expected irrespective of the development |
| A | High quality, with an estimated remaining contribution of at least 40 years | Retention expected; the layout should work around these |
| B | Moderate quality, contribution of at least 20 years | Retention normally expected unless a good reason is given |
| C | Low quality, contribution of at least 10 years, or young trees | Removal is arguable where replacement planting is offered |
Subcategories record why a tree matters: mainly arboricultural value, mainly landscape value, or mainly cultural and conservation value including veteran status. A category B tree that screens a row of houses from the site is a different negotiation from a category B tree in the middle of a field.
Category U is worth checking rather than accepting. It is the category most open to optimistic grading, and a council tree officer who disagrees will say so at consultation.
Calculating and plotting root protection areas
For a single stem tree, the root protection area is calculated as a circle with a radius of twelve times the stem diameter measured at 1.5 m above ground, with the resulting area capped at 707 m², which corresponds to a radius of about 15 m. Multi-stem trees use a different derivation of the stem diameter, and the survey schedule should show which was applied.
The area is what matters, not the shape. Where existing site conditions make roots unlikely in one direction, a building, a road or a river, the area can be redistributed into ground where roots are more likely to be, provided the total area is maintained and the reasoning is stated. Redistribution has to be justified by evidence about the soil and the existing constraints rather than by the shape of the proposed building.
Two errors turn up repeatedly. Plotting the root protection area as a tidy circle when a wall or an adopted road already prevents root growth on one side, which understates the usable ground elsewhere. And quietly reducing the radius to fit a footprint, which a tree officer with a scale rule will find in a minute.
Plot the areas at survey stage and leave them alone. If the design needs them changed, that is a discussion with the arboriculturist, recorded in the Tree Survey documentation.
Shade, future growth and what a plan can hide
Shade is the constraint designers forget, and it is the one that produces complaints from occupiers rather than objections from officers.
A mature tree to the south of a proposed dwelling casts shade across the garden and the principal rooms for much of the day, and the pressure to fell or heavily reduce it arrives within a year or two of occupation. Plotting the shade pattern at survey stage lets the layout put the tree to the north of the garden instead, which costs nothing at that stage.
Future growth is the second hidden constraint. The survey records the tree as it is, and trees get bigger. A young category C tree with twenty years ahead of it will have a wider crown and a larger stem diameter, which means a larger root protection area, by the time the development is halfway through its life.
Where the plan omits shade and growth, it is doing half the job. Ask for both.
Using the plan to position a building
The sequence that works is simple and is followed less often than it should be. Survey first, constraints plan second, layout third.
With the plan in front of you, the moves available are clear. Shift the footprint out of the root protection area rather than proposing a no-dig construction to get into it. Route drainage and service runs outside the areas, because a single trench through a root protection area can do more damage than the building. Keep site access, compounds and material storage off the areas, which is a construction issue that has to be resolved at layout stage because there may be nowhere else to put them.
Where an incursion is unavoidable, the standard allows engineered solutions, cellular confinement systems, pile and beam foundations, no-dig surfacing, and the arboriculturist should be specifying them rather than the architect assuming them. These solutions have real cost, and the earlier they enter the appraisal the better.
The layout rationale belongs in the Design and Access Statement, and a design evolution section that shows the footprint moving because of a root protection area is exactly the kind of evidence officers respond to.
When the plan is drawn after the design
In practice many arboriculturists are appointed after the planning drawings are complete, and are asked to produce a constraints plan that supports a layout already fixed.
The honest response is to produce the plan properly and let it show the conflicts. Reports that quietly redraw root protection areas to fit the scheme damage the arboriculturist's position and rarely survive consultation. A tree officer reads dozens of these.
Where conflicts are found late, the options narrow to redesign, engineered solutions at cost, or an argument for removal with replacement planting. The last of these works better for category C trees than for category A, and not at all for a tree protected by a Tree Preservation Order unless the case is strong. Trees in a conservation area carry their own notification requirement before works, with a notice period the council can use to make an order.
Moving from constraints to impact assessment
The constraints plan feeds the arboricultural impact assessment, which identifies the trees affected, quantifies the loss, and proposes mitigation. That in turn feeds the tree protection plan and the arboricultural method statement, which are the documents the contractor works to.
Keep the tree numbers consistent through all four. Where the same trees appear in an ecological report or a Biodiversity Net Gain Assessment, the numbering should carry across, since hedgerows and individual trees are counted in the statutory metric and mismatched references make the calculation impossible to check.
The protection measures themselves land in the construction phase sections of a management plan, which is where fencing specifications, ground protection and supervision get written down for people on site.
Councils expect this work from a suitably qualified arboriculturist, and professional review is strongly advised before submission. Browse all 66 PlanScope report types to see which tree and landscape documents a scheme is likely to need.
PlanScope provides AI-assisted draft reports for planning applications. Reports should be reviewed before submission. We do not guarantee planning approval.
Frequently asked questions
How is a root protection area calculated?
For a single stem tree it is a circle with a radius of twelve times the stem diameter measured at 1.5 m above ground, with the area capped at 707 m², which corresponds to a radius of about 15 m. Multi-stem trees use a different derivation of stem diameter, and the survey schedule should record which method was applied.
Can a root protection area be changed in shape?
The area can be redistributed where existing conditions such as a wall, an adopted road or a watercourse make root growth unlikely in one direction, provided the total area is maintained and the reasoning is stated. It cannot be reduced to fit a proposed footprint, and a tree officer with a scale rule will identify that quickly.
What do the BS 5837 tree categories mean?
Category U covers trees unsuitable for retention. Category A covers high quality trees with an estimated remaining contribution of at least 40 years, B moderate quality with at least 20 years, and C low quality with at least 10 years or young trees. Subcategories record whether the value is arboricultural, landscape or cultural.
Should a tree constraints plan show the proposed building?
No. The plan records the constraints alone, so that the layout can be designed around them. Once a building outline appears on the same drawing, the discussion shifts from what the constraints are to whether they can be accommodated, and the constraints tend to move rather than the design.
What happens if trees are surveyed after the layout is fixed?
The conflicts get recorded rather than avoided. The remaining options are redesign, engineered solutions such as no-dig surfacing or pile and beam foundations at cost, or an argument for removal with replacement planting. That argument works better for category C trees than category A, and rarely for a tree covered by a Tree Preservation Order.
Sources and further reading
This article is general guidance about the planning system in England and, where stated, the rest of the UK. It is not legal or professional advice. Check your local planning authority’s validation requirements and take professional advice for your specific site.